Kasuga dam
INTRODUCTION
Background
Kasuga dam is located in Kasuga Village, within the
administrative location of Kasuga Ward, Kakonko Division in
Kibondo District, at a geographical location of 9638860N and
0268261E, about 55km North- West of Kibondo Town. In the
year 2007/08 the village community of Kasuga requested
assistance from Government of Tanzania to construct a dam at
the proposed dam location site that would supply water for
domestic, livestock and horticultural crops.
DESIGN DESCRIPTION OF KASUGA EARTH DAM
The successful design, construction, and operation of a reservoir project
over the full design period required a comprehensive site classification,
a detailed design of each feature, construction supervision, continuous
measurement and monitoring of performance of the project features
during operation. The design and construction of dams are normally
complex activities because of the nature of the varying foundation
conditions and range of properties of the materials available for use in
the embankment, however under proper engineering analysis the above
said problems are overcome. The design of this project was carried out
prior to the following steps:
The first step was to conduct detailed geological and subsurface
investigations, which illustrate the extent of hard strata of dam
foundation, abutments and potential borrow areas.
The next step was to conduct a study of the type and physical properties
of materials to be placed in the embankment. This study incorporates
determination of quantities and sequence in which they became
available. The design includes all of the studies, testing, analysis and
assessment to ensure that the embankment met all technical criteria and
the requirements of a dam as outlined hereunder.
Embankment shall be safe against overtopping by
provision of adequate spillway capacity and sufficient free
board.
Embankment shall be safe against sliding and overturning
by providing adequate cut-off and by using suitable soil
material for embankment construction
Water should not infiltrate through bed or cracks of dam
embankment and hence proper compaction is necessary.
The upstream and downstream slopes of the embankment
should be stable under all conditions. This will be taken
care by provision of stone pitching/ riprap to the upstream
face to protect the embankment against wave action. And
grass plantation on the downstream face to avoid
possibility of soil erosion.
RESISTING MOMENT
FORCE kN Lever Arm(m) Moment(kNm)
P1=0.5*19.82*9.91* 13.21 22,054.62
17.00=1669.54
P2=4.5*9.91*17.00 22.07 16731.71
=758.12
P3=0.5*9.91*29.73*17.0 34.23 85,722.53
=2,504.31
DISTURBING MOMENT
P4=0.5*8.4*25.23*9.81 45.64 47,444.15
=1,039.53
P5=0.5*8.4*9.81*8.4 3.30 1,144.84
=346.92
U1=0.5*9.91*54.05*9.81 36.03 94,661.62
=2,627.30
F.Srotation=Rest. Moment /Dist.Moment
=171,953.01/95,806.456
=1.80>1.50 Ok