DETERMINACIÓN DEL COSTO FLETE X KG

"INSTALACION DEL SERVICIO AGUA POTAPLE Y DISPOSICION SANITARIA DE EXCRETAS EN EL SECT


Proyecto : CAMPESINA TULACOLLO, DISTRITO KELLUYO-CHUCUITO-PUNO"

Ubicación : Mita- Kelluyo - Chucuito - Puno

Costo por
Estivaje
Origen Destino Vehiculo - capacidad Carga viaje S/.
S/.
(Sin IGV)

Puno Obra Semi trayler 30 Ton General 2 033.90 375.00


Puno 1 Obra Camion 8 Ton Tubos 1 231.96 100.00
Juliaca Obra Semi trayler 30 Ton General 2 542.37 375.00
Lima Obra Semi trayler 30 Ton General 8 750.00 375.00
Puno 2 Obra Camion 8 ton Tanques HDPE 5 300.00 100.00
0.00 0.00 0.00 0.00

COSTO DEL FLETE DE TUBOS PVC (EQUIVALENTE EN KG )

1. En el siguiente cuadro se ha obtenido el costo de flete por kg de tubería tomando en cuenta la cantidad de
un camión peso de la carga y costo del viaje.
2. La altura de la ruma de tubos no excederá de 1.50 m para proteger contra el aplastamiento de los tubos en
3. El factor de viaje contempla la posibilidad de economizar el flete enbonando tubos uno dentro de otros cuan

Ruma de Ancho 2.20


Alto 1.50

Procedente de Puno

Peso por Peso total


Ø Longitud Cantidad Metros Costo por
Ø mm tubo aprox aprox por
pulg tubo por ruma totales viaje
(kg) ruma(kg)
1/2" 21 5 7,482 37,410 0.76 5,686.32 1231.96
3/4" 27 5 4,526 22,630 0.98 4,426.43 1231.96
1" 33 5 3,030 15,150 1.24 3,742.05 1231.96
1 1/4" 42 5 1,870 9,350 1.76 3,289.33 1231.96
1 1/2" 48 5 1,432 7,160 2.31 3,309.35 1231.96
2" 63 6 831 4,986 4.75 3,947.25 1231.96
2 1/2" 75 6 586 3,516 6.78 3,974.84 1231.96
3" 90 6 407 2,442 9.73 3,958.08 1231.96
4" 110 6 272 1,632 14.64 3,983.17 1231.96
COSTO DEL FLETE DE TANQUES HDPE (EQUIVALENTE EN KG

1. En el siguiente cuadro se ha obtenido el costo de flete por kg de tanque HDPE tomando en cuenta el númer
transportar un camión peso de la carga y costo del viaje.

Ruma de Ancho 2.20


Largo 11.00

Procedente de Puno

A B Cantidad Peso unit Peso total Costo por


Descripción
m m x camión kg m3 viaje
Tanque 250 lt 0.650 0.650 174.00 25.00 0.17 5 300.00

Biodigestor 600 lt 1.650 0.880 51.00 60.00 0.05 5 300.00

Otros 1.250 0.880 66.00 62.00 0.07 5 300.00


KG

TAS EN EL SECTOR MITA DE LA COMUNIDAD

Costo por Costo


viaje y Flete x Kg
estivaje S/. S/. (Sin
(Sin IGV) IGV)
2 408.90 0.0803
1 331.96 0.2436
2 917.37 0.0972
9 125.00 0.3042
5 400.00 514.1000
0.00 0.00

TE EN KG )

la cantidad de tubos que puede transportar

de los tubos en las camas inferiores


ro de otros cuando el diámetro lo permita

Factor Flete Flete


viaje por ml por kg

1.000 0.033 0.217


1.000 0.054 0.278
1.000 0.081 0.329
1.000 0.132 0.375
1.000 0.172 0.372
0.500 0.124 0.156
0.500 0.175 0.155
0.500 0.252 0.156
0.500 0.377 0.155
Promedio 0.156 0.2436
ENTE EN KG )

uenta el número de unidades que puede

Factor Flete Flete


viaje por und por m3
0.500 15.23 922.200

0.500 51.96 270.30

2.500 200.76 349.80

Promedio - 514.10
CÁLCULO DEL COSTO DE FLETE POR KG A OBRA

RUTA : LIMA - AREQUIPA - DVO. IMATA - SANTA LUCÍA - EMP. RO3S JULIACA - JULIACA - PU

TRANSPORTE NORMAL
Cálculo del flete basado en lo establecido en el D.S. N° 033-2006-MTC del 30.09.06 y el D.S. N° 010-2006-MTC del
25.03.06 que establecen costos del servicio de transporte de bienes en el ámbito local y por carretera para diversas ruta
y distancias virtuales establecidas previamente.

D.V. S/. X TM FRV (*) S/. X TM


ORIGEN DESTINO
(kmv)
LIMA PUNO 1,566.80 258.74 1.000 258.74
PUNO DESAGÜADERO 412.27 68.08 1.000 68.08
1,979.07 326.82 326.82

ACTUALIZACION A SETIEMBRE 2012

Iu (32) Noviembre 2012 450.67


K1 = ----------------------------- = ------------------ = 1.2131
Iu (32) Diciembre 2005 371.50

Cálculo de flete de acuerdo a los costos para el transporte de carga en ámbito local contenido en el Anexo II del D.S. N

TRAMO TIPO ESTADO DIST. REAL


FACTOR
DE A DE VIA VIA (Km)
DESAGÜADERO HUACULLANI Terrestre Asfaltado 40.00 1.00
DESAGÜADERO HUACULLANI Terrestre Afirmada 5.00 1.20
HUACULLANI PICHUPICHUNI Terrestre Trocha 3.00 1.50
TOTAL 48.00

D.V. S/. X TM FRV (*) S/. X TM


ORIGEN DESTINO
(kmv)
DESAGÜADERO PICHUPICHUNI 50.50 17.13 1.00 17.13

ACTUALIZACION A SETIEMBRE 2012

Iu (32) Noviembre 2012 450.67


K2 = ----------------------------- = ------------------ = 1.4162
Iu (32) Noviembre 2002 318.23

RUTA : AREQUIPA - DVO. IMATA - SANTA LUCÍA - EMP. RO3S JULIACA - JULIACA - PUNO - O

TRANSPORTE NORMAL
Cálculo del flete basado en lo establecido en el D.S. N° 033-2006-MTC del 30.09.06 y el D.S. N° 010-2006-MTC del
CÁLCULO DEL COSTO DE FLETE POR KG A OBRA

25.03.06 que establecen costos del servicio de transporte de bienes en el ámbito local y por carretera para diversas ruta
y distancias virtuales establecidas previamente.

D.V. S/. X TM FRV (*) S/. X TM


ORIGEN DESTINO
(kmv)
AREQUIPA PUNO 517.84 85.52 1.000 85.52
PUNO DESAGÜADERO 412.27 68.08 1.000 68.08
930.11 153.60 153.60

ACTUALIZACION A SETIEMBRE 2012

Iu (32) Noviembre 2012 450.67


K1 = ----------------------------- = ------------------ = 1.2131
Iu (32) Diciembre 2005 371.50

Cálculo de flete de acuerdo a los costos para el transporte de carga en ámbito local contenido en el Anexo II del D.S. N

TRAMO TIPO ESTADO DIST. REAL


FACTOR
DE A DE VIA VIA (Km)
DESAGÜADERO HUACULLANI Terrestre Asfaltado 40 1
DESAGÜADERO HUACULLANI Terrestre Afirmada 5 1.2
HUACULLANI PICHUPICHUNI Terrestre Trocha 3 1.5
TOTAL 48.00

D.V. S/. X TM FRV (*) S/. X TM


ORIGEN DESTINO
(kmv)
DESAGÜADERO PICHUPICHUNI 50.50 17.13 1.00 17.13

ACTUALIZACION A SETIEMBRE 2012

Iu (32) Noviembre 2012 450.67


K2 = ----------------------------- = ------------------ = 1.4162
Iu (32) Noviembre 2002 318.23

RUTA : PUNO - OBRA

TRANSPORTE NORMAL
Cálculo del flete basado en lo establecido en el D.S. N° 033-2006-MTC del 30.09.06 y el D.S. N° 010-2006-MTC del
25.03.06 que establecen costos del servicio de transporte de bienes en el ámbito local y por carretera para diversas ruta
y distancias virtuales establecidas previamente.

D.V. S/. X TM FRV (*) S/. X TM


ORIGEN DESTINO
(kmv)
PUNO DESAGÜADERO 412.27 68.08 1.000 68.08
CÁLCULO DEL COSTO DE FLETE POR KG A OBRA

412.27 68.08 68.08

ACTUALIZACION A SETIEMBRE 2012

Iu (32) Noviembre 2012 450.67


K1 = ----------------------------- = ------------------ = 1.2131
Iu (32) Diciembre 2005 371.50

Cálculo de flete de acuerdo a los costos para el transporte de carga en ámbito local contenido en el Anexo II del D.S. N

TRAMO TIPO ESTADO DIST. REAL


FACTOR
DE A DE VIA VIA (Km)
DESAGÜADERO HUACULLANI Terrestre Asfaltado 40 1
DESAGÜADERO HUACULLANI Terrestre Afirmada 5 1.2
HUACULLANI PICHUPICHUNI Terrestre Trocha 3 1.5
TOTAL 48.00

D.V. S/. X TM FRV (*) S/. X TM


ORIGEN DESTINO
(kmv)
DESAGÜADERO PICHUPICHUNI 50.50 17.13 1.00 17.13

ACTUALIZACION A SETIEMBRE 2012

Iu (32) Noviembre 2012 450.67


K2 = ----------------------------- = ------------------ = 1.4162
Iu (32) Noviembre 2002 318.23

RUTA : ALMACEN - OBRA

Cálculo de flete de acuerdo a los costos para el transporte de carga en ámbito local contenido en el Anexo II del D.S. N

TRAMO TIPO ESTADO DIST. REAL


FACTOR
DE A DE VIA VIA (Km)
ALMACEN OBRA Terrestre Trocha 3 1.5
TOTAL 3.00

D.V. S/. X TM FRV (*) S/. X TM


ORIGEN DESTINO
(kmv)
ALMACEN OBRA 4.50 12.23 1.00 12.23

ACTUALIZACION A SETIEMBRE 2012


CÁLCULO DEL COSTO DE FLETE POR KG A OBRA

Iu (32) Noviembre 2012 450.67


K2 = ----------------------------- = ------------------ = 1.4162
Iu (32) Noviembre 2002 318.23

RESÚMEN

FLETE A OBRA
ORIGEN
S/. x T.M. S/. x KG
LIMA 420.73 0.42 0.3565486447
AREQUIPA 210.59 0.21 0.1784683532
PUNO 106.85 0.11 0.0905487912
RURAL 17.32 0.02 0.0146778343
- - -

Nota:
(*) FRV : Factor de Retorno al Vacío igual a 1 para transporte normal y a 1.4 para transporte especial (de acuerdo al D.S. N° 010-2006-MTC del 25.03
Transporte Especial : Se denomina al transporte usando contenedores, cargas peligrosas, cargas liquidas (de acuerdo al D.S. N° 010-2006-MTC del
Factor de Reajuste (k) (De acuerdo al D.S. N° 011-79-VC del 02.03.79 y sus modificatorias, ampliatorias y complementarias.)
A - SANTA LUCÍA - EMP. RO3S JULIACA - JULIACA - PUNO - OBRA

033-2006-MTC del 30.09.06 y el D.S. N° 010-2006-MTC del


e de bienes en el ámbito local y por carretera para diversas rutas

REAJUSTE SUBTOTAL
K1
1.2131 313.88
1.2131 82.59
396.47

te de carga en ámbito local contenido en el Anexo II del D.S. Nº 49-2002-MTC

DIST. VIRTUAL
S/. X TM
(Km)
40.00
6.00
4.50
50.50 17.13

REAJUSTE SUBTOTAL
K2
1.4162 24.26

TA LUCÍA - EMP. RO3S JULIACA - JULIACA - PUNO - OBRA

033-2006-MTC del 30.09.06 y el D.S. N° 010-2006-MTC del


e de bienes en el ámbito local y por carretera para diversas rutas

REAJUSTE SUBTOTAL
K1
1.2131 103.75
1.2131 82.59
186.33

te de carga en ámbito local contenido en el Anexo II del D.S. Nº 49-2002-MTC

DIST. VIRTUAL
S/. X TM
(Km)
40.00
6.00
4.50
50.50 17.13

REAJUSTE SUBTOTAL
K2
1.42 24.26

033-2006-MTC del 30.09.06 y el D.S. N° 010-2006-MTC del


e de bienes en el ámbito local y por carretera para diversas rutas

REAJUSTE SUBTOTAL
K1
1.2131 82.59
1.21 82.59

te de carga en ámbito local contenido en el Anexo II del D.S. Nº 49-2002-MTC

DIST. VIRTUAL
S/. X TM
(Km)
40.00
6.00
4.50
50.50 17.13

REAJUSTE SUBTOTAL
K2
1.42 24.26

te de carga en ámbito local contenido en el Anexo II del D.S. Nº 49-2002-MTC

DIST. VIRTUAL
S/. X TM
(Km)
4.50
4.50 12.23

REAJUSTE SUBTOTAL
K2
1.42 17.32
a 1.4 para transporte especial (de acuerdo al D.S. N° 010-2006-MTC del 25.03.06)
s, cargas peligrosas, cargas liquidas (de acuerdo al D.S. N° 010-2006-MTC del 25.03.06)
CÁLCULO DEL COSTO TOTAL DE FLETE

PROCEDENCI
CANTIDAD PESO
DESCRIPCION UND A
(kg / u )

Alambre puas galvanizado N° 16 kg 175.5611 Err:504 Err:504


Alambre de fierro galvanizado N° 14 kg 14.2800 Err:504 Err:504
Alambre negro N° 8 kg 894.9850 Err:504 Err:504
Alambre negro N° 16 kg 812.1575 Err:504 Err:504
Clavo c/cabeza para madera (promedio) kg 655.8125 Err:504 Err:504
Fo. t/barra redonda lisa DN 12,70 mm (1/2") m 200.0000 Err:504 Err:504
Perno incluye tuerca 3/4" x 6" und 9.0000 Err:504 Err:504
Fo. construcción kg 14,381.9757 Err:504 Err:504
Arena fina m3 108.5093 Err:504 Err:504
Arena gruesa m3 3,401.1300 Err:504 Err:504
Material seleccionado de préstamo m3 5,331.2425 Err:504 Err:504
Grava seleccionada m3 506.2500 Err:504 Err:504
Piedra grande m3 998.1056 Err:504 Err:504
Piedra mediana m3 708.8965 Err:504 Err:504
Cable eléctrico TW de 4 mm2 ( 7 alambres) m 3,920.0000 Err:504 Err:504
Ducha cromada incl. grifería 1 llave und 200.0000 Err:504 Err:504
Inodoro tanque bajo losa i/grifo bronc. und 200.0000 Err:504 Err:504
Lavadero de granito con 1 poza und 200.0000 Err:504 Err:504
Lavatorio de losa i/ grifo crom. 1 caño und 200.0000 Err:504 Err:504
Caja Porta medidor tipo L monofasica und 200.0000 Err:504 Err:504
Fusible Unipolar 5A/20A und 200.0000 Err:504 Err:504
Fluorescente tipo circular de 22 W und 200.0000 Err:504 Err:504
Caja de fierro galv. 100 x 100 x 50 mm incluye t und 200.0000 Err:504 Err:504
Caja de fierro galv. rectang. 4" x 2 1/8" und 300.0000 Err:504 Err:504
Caja de fierro galv. octogonal 4"x 2 1/8" und 450.0000 Err:504 Err:504
Interruptor bakelita simple und 200.0000 Err:504 Err:504
Tablero eléctrico metal de 2 circuitos und 200.0000 Err:504 Err:504
Tomacorriente doble de bakelita tipo universal de und 200.0000 Err:504 Err:504
Ladrillo de arcilla king kong(a máquina) und 119,574.0000 Err:504 Err:504
Cable eléctrico NYY duplex 2x1 x 6 mm2 m 1,236.0000 Err:504 Err:504
Cemento portland tipo IP (bolsa x 42.5 kg) und 6,437.2028 Err:504 Err:504
Bisagra de fierro (promedio) und 28.5000 Err:504 Err:504
Candado und 30.5000 Err:504 Err:504
Anillo jebe p/tuber. PVC UF DN 75 mm und 1,711.9000 Err:504 Err:504
Cable de acero galv. 1/4" alma de cáñamo m 144.0000 Err:504 Err:504
Cinta selladora teflón und 667.3067 Err:504 Err:504
Tanque fibra vidrio de 250 litros und 200.0000 Err:504 Err:504
Biodigestor fibra vidrio de 600 litros und 200.0000 Err:504 Err:504
Masilla kg 53.8000 Err:504 Err:504
Pintura ocre kg 219.4600 Err:504 Err:504
Pegamento para tubo de PVC 1/4 galón und 169.7095 Err:504 Err:504
Cola sintética (envase por galón) und 51.6000 Err:504 Err:504
Soldadura cellocord AP kg 15.7484 Err:504 Err:504
Válvula de aire tipo rosca doble esfera DN 1/2" und 4.0000 Err:504 Err:504
Vidrio incoloro 3 mm p2 1,129.8000 Err:504 Err:504
Yeso (bolsa x 25kg) und 396.4243 Err:504 Err:504
CÁLCULO DEL COSTO TOTAL DE FLETE

PROCEDENCI
CANTIDAD PESO
DESCRIPCION UND A
(kg / u )

Plástico m2 2,025.0000 Err:504 Err:504


Aditivo impermeabilizante de concreto und 60.2563 Err:504 Err:504
Aditivo desmoldador gl 12.5723 Err:504 Err:504
Sika:plastiment HE98 balde de 20 kg und 3.6425 Err:504 Err:504
Hipoclorito de calcio al 70% kg 35.2570 Err:504 Err:504
Caja de concreto 0,45 m x 0,90 m para desagüeund 400.0000 Err:504 Err:504
Caja de concreto para válvula 1/2" und 200.0000 Err:504 Err:504
Tapa de concreto armado perfil FF de 0,60 m und 8.0000 Err:504 Err:504
Tapa concreto armado caja para desague de 0,45 und 400.0000 Err:504 Err:504
Tapa concreto para caja de valvulas 1/2" und 200.0000 Err:504 Err:504
Flete de materiales para la obra und 1.0000 Err:504 Err:504
Afirmado m3 157.5342 Err:504 Err:504
Hormigón m3 788.0727 Err:504 Err:504
Agua m3 1,824.5267 Err:504 Err:504
Gigantografia según diseño m2 8.7000 Err:504 Err:504
Madera para encofrado y carpintería p2 19,480.1817 Err:504 Err:504
Madera rollizo 4" x 4" x 9 pies und 127.3000 Err:504 Err:504
Regla de madera und 6.7200 Err:504 Err:504
Triplay de espesor 18 mm m2 60.2986 Err:504 Err:504
Marco de fierro fundido de diámetro 0,60 m und 8.0000 Err:504 Err:504
Marco+tapa fo. fdo. p/registro válvula und 44.0000 Err:504 Err:504
Perfil fo. ang "L" 3/4"x3/4"x1/8" m 240.0000 Err:504 Err:504
Perfil fo. ang "L" 1"x1"x1/8" m 384.0000 Err:504 Err:504
Perfil fo. tee "T" 3/4"x3/4"x1/8" m 42.0000 Err:504 Err:504
Perfil fo. tee "T" 1"x1"x1/8" m 246.0000 Err:504 Err:504
Platina de fierro de 4" x 1/4" m 13.0000 Err:504 Err:504
Calamina galvanizada ondulada 1.83 x 0.83 x 0.0 und 60.0000 Err:504 Err:504
Pintura imprimante base, (envase por galón) und 130.6774 Err:504 Err:504
Pintura anticorrosiva-epóxica naval, envase por g und 21.0415 Err:504 Err:504
Pintura esmalte sintético, envase por galón und 82.7577 Err:504 Err:504
Pintura látex duravinil (envase x galón) und 104.5424 Err:504 Err:504
Thinner stándard (envase por galón) und 7.0738 Err:504 Err:504
Marco y tapa de plancha LAC de 0,60 x 0,60 m e und 21.0000 Err:504 Err:504
Codo fo. galvanizado unión roscada DN 1 1/2" und 12.0000 Err:504 Err:504
Codo fo. galvanizado unión roscada DN 2" und 28.0000 Err:504 Err:504
Reduccion fo. galvanizado UR DN 3" a 2" und 4.0000 Err:504 Err:504
Tapón fo. galvanizado UR DN 1/2" (m - h) und 28.4200 Err:504 Err:504
Tapón fo. galvanizado UR DN 1" (m - h) und 71.1822 Err:504 Err:504
Tapón fo. galvanizado UR DN 2" (m - h) und 48.2800 Err:504 Err:504
Tee de fo. galvanizado UR DN 1 1/2" und 4.0000 Err:504 Err:504
Tee de fo. galvanizado UR DN 2" und 20.0000 Err:504 Err:504
Tubo de fierro galv. stándard ISO I de DN 1" m 52.0000 Err:504 Err:504
Tubo de fierro galv. stándard ISO I de 1 1/2" m 20.4007 Err:504 Err:504
Tubo de fierro galv. stándard ISO I de 2" m 10.2000 Err:504 Err:504
Tubo de fierro galv. stándard ISO I de DN 3" m 9.6000 Err:504 Err:504
Unión roscada de fo. galv. DN 1 1/2" und 3.1800 Err:504 Err:504
CÁLCULO DEL COSTO TOTAL DE FLETE

PROCEDENCI
CANTIDAD PESO
DESCRIPCION UND A
(kg / u )

Unión roscada de fo. galv. DN 2" und 1.5918 Err:504 Err:504


Unión universal fo. galv. DN 1/2" und 1,200.0000 Err:504 Err:504
Unión universal fo. galv. DN 3/4" und 20.0000 Err:504 Err:504
Unión universal fo. galv. DN 1" und 68.0000 Err:504 Err:504
Unión universal fo. galv. DN 1 1/2" und 16.0000 Err:504 Err:504
Unión universal fo. galv. DN 2" und 32.0000 Err:504 Err:504
Niple fierro galvanizado 1/2" union rosca und 404.0000 Err:504 Err:504
Niple fierro galvanizado 3/4" union rosca und 20.0000 Err:504 Err:504
Niple fierro galvanizado 1" union rosca und 68.0000 Err:504 Err:504
Niple fierro galvanizado 1 1/2" union rosca und 28.0000 Err:504 Err:504
Niple fierro galvanizado 2" union rosca und 60.0000 Err:504 Err:504
Niple fierro galvanizado 80mm union rosca und 4.0000 Err:504 Err:504
Abrazadera para cables de acero 1/4" und 84.0000 Err:504 Err:504
Ventilación con tubería de fierro pintada DN 2" und 8.0000 Err:504 Err:504
Canastilla de bronce roscada DN 2" und 8.0000 Err:504 Err:504
Registro de bronce DN 2" und 200.0000 Err:504 Err:504
Sumidero de bronce DN 2" und 200.0000 Err:504 Err:504
Abrazadera de fierro fdo. incluye anillo DN 2" und 4.0000 Err:504 Err:504
Codo de PVC SP 45° DN 1/2" und 400.0000 Err:504 Err:504
Codo de PVC SP 45° DN 3/4" und 26.0000 Err:504 Err:504
Codo de PVC SP 45° DN 1" und 93.0000 Err:504 Err:504
Codo de PVC SP 45° DN 1 1/2" und 4.0000 Err:504 Err:504
Codo de PVC SP 90° DN 2" und 16.0000 Err:504 Err:504
Codo de PVC UR 45° DN 1/2" und 1,600.0000 Err:504 Err:504
Codo de PVC UR 90° DN 1/2" und 800.0000 Err:504 Err:504
Codo de PVC UF 45° DN 75 mm und 48.0000 Err:504 Err:504
Llave de paso de resina termo DN 2" und 200.0000 Err:504 Err:504
Lubricante para tuberpia de unión flexible; (galónund 10.0700 Err:504 Err:504
Reducción de PVC SP DN 3/4" a 1/2" und 200.0000 Err:504 Err:504
Hipoclorador de flujo difusion de PVC und 4.0000 Err:504 Err:504
Tapón de PVC simple presión DN 3/4" und 14.0000 Err:504 Err:504
Tapón de PVC simple presión DN 1" und 48.0000 Err:504 Err:504
Tapón de PVC simple presión DN 1 1/2" und 2.0000 Err:504 Err:504
Tapón de PVC simple presión DN 2" und 24.0000 Err:504 Err:504
Tee de PVC simple presión DN 3/4" und 216.0000 Err:504 Err:504
Tee de PVC simple presión DN 1" und 59.0000 Err:504 Err:504
Tee de PVC simple presión DN 1 1/2" und 3.0000 Err:504 Err:504
Tee de PVC simple presión DN 2" und 16.0000 Err:504 Err:504
Tee PVC unión rosca DN 1/2" und 800.0000 Err:504 Err:504
Tee de PVC UF DN 75 mm und 3.0000 Err:504 Err:504
Tubo de PVC SP PN 10 DN 1/2" m 5,484.0175 Err:504 Err:504
Tubo de PVC SP PN 10 DN 3/4" m 4,801.5786 Err:504 Err:504
Tubo de PVC SP PN 10 DN 1" m 17,502.7308 Err:504 Err:504
Tubo de PVC SP PN 10 DN 1 1/2" m 648.7200 Err:504 Err:504
Tubo de PVC SP PN 10 DN 2" m 157.0376 Err:504 Err:504
Tubo PVC UF PN 7,5 DN 75 mm m 1,397.4000 Err:504 Err:504
CÁLCULO DEL COSTO TOTAL DE FLETE

PROCEDENCI
CANTIDAD PESO
DESCRIPCION UND A
(kg / u )

Tubo de PVC UF PN 10 DN 63 mm m 108.0000 Err:504 Err:504


Tubo de PVC UF PN 10 DN 110 mm m 108.0000 Err:504 Err:504
Tubo de PVC UF PN 10 D 75 mm m 8,874.0000 Err:504 Err:504
Unión de PVC presión-rosca DN 1/2" und 1,840.0000 Err:504 Err:504
Unión de PVC t/UR DN 1/2" und 200.0000 Err:504 Err:504
Unión de PVC t/UR DN 2" und 4.0000 Err:504 Err:504
Codo PVC SP de 45° p/desagüe DN 2" und 200.0000 Err:504 Err:504
Codo PVC SP de 90° p/desagüe DN 2" und 1,266.0000 Err:504 Err:504
Codo PVC SP de 90° p/desagüe DN 2 1/2" und 200.0000 Err:504 Err:504
Codo PVC SP de 90° p/desagüe DN 4" und 224.0000 Err:504 Err:504
Ramal en T simple PVC SP DN 2" und 600.0000 Err:504 Err:504
Ramal en T simple PVC SP DN 4" und 400.0000 Err:504 Err:504
Ramal en T simple con reducción PVC DN 4" a 2"und 600.0000 Err:504 Err:504
Reducción PVC SP DN 3" a 2" und 13.0000 Err:504 Err:504
Sombrero ventilación de PVC para desague DN und 200.0000 Err:504 Err:504
Tapón PVC SP DN 2" und 39.0000 Err:504 Err:504
Tee sanitaria PVC SP DN 2" und 26.0000 Err:504 Err:504
Tee ramal p/desague P.V.C con reducción DN 4" und 400.0000 Err:504 Err:504
Tubo PVC SAL liviana DN 2" m 2,531.3900 Err:504 Err:504
Tubo PVC SAL liviana DN 4" m 4,167.0500 Err:504 Err:504
Tubo PVC SAL liviana DN 6" m 22.0000 Err:504 Err:504
Tubo de PVC SAL 4" m 12.0000 Err:504 Err:504
Trampa "P" de PVC DN 2" und 400.0000 Err:504 Err:504
Conexiones a caja PVC SAP DN 3/4" und 800.0000 Err:504 Err:504
Conexiones a caja PVC SAP DN 1 1/2" und 200.0000 Err:504 Err:504
Curva PVC SEL de 90° DN 1 1/2" und 200.0000 Err:504 Err:504
Curva PVC SAP de 90° DN 3/4" und 400.0000 Err:504 Err:504
Tubo de PVC SAP DN 3/4" m 1,600.0000 Err:504 Err:504
Tubo de PVC SAP DN 1 1/2" m 200.0000 Err:504 Err:504
Caño de bronce para jardín DN 1/2" und 200.0000 Err:504 Err:504
Válvula compuerta de bronce tipo roscada DN 1/ und 204.0000 Err:504 Err:504
Válvula compuerta de bronce tipo roscada DN 3/ und 10.0000 Err:504 Err:504
Válvula compuerta de bronce tipo roscada DN 1"und 34.0000 Err:504 Err:504
Válvula compuerta de bronce tipo roscada DN 1 1und 8.0000 Err:504 Err:504
Válvula compuerta de bronce tipo roscada DN 2"und 20.0000 Err:504 Err:504
Válvula globo tipo roscada de bronce DN 1/2" und 400.0000 Err:504 Err:504
FLETE FLETE FLETE FLETE FLETE TOTAL
TERRETRE RURAL TERRETRE RURAL
(S/. / KG) (S/. / KG) (S/.) (S/.) (S/.)

Err:504 Err:504 Err:504 Err:504 Err:504


Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
FLETE FLETE FLETE FLETE FLETE TOTAL
TERRETRE RURAL TERRETRE RURAL
(S/. / KG) (S/. / KG) (S/.) (S/.) (S/.)

Err:504 Err:504 Err:504 Err:504 Err:504


Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
FLETE FLETE FLETE FLETE FLETE TOTAL
TERRETRE RURAL TERRETRE RURAL
(S/. / KG) (S/. / KG) (S/.) (S/.) (S/.)

Err:504 Err:504 Err:504 Err:504 Err:504


Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
FLETE FLETE FLETE FLETE FLETE TOTAL
TERRETRE RURAL TERRETRE RURAL
(S/. / KG) (S/. / KG) (S/.) (S/.) (S/.)

Err:504 Err:504 Err:504 Err:504 Err:504


Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504
Err:504 Err:504 Err:504 Err:504 Err:504

TOTAL Err:504
CALCULO DEL FLETE
"CONTRIBUCION AL ACCESO DE AGUA SEGURA Y SANEAMIENTO EN
OBRA: CONCEPCION, LLOCCEPATA, SANTA ROSA Y ANTAPITE DISTRITO CONCE
VILCASHUAMAN AYACUCHO"
1,- DATOS GENERALES DE CARGA
LOCALIDAD : ANTAPITE
a.- POR PESO

DESCRIPCION UND

BOTENES DE SEGURIDAD PUNTA DE ACERO PAR


MALLA OLIMPICA #10 DE H=2M ML
ALAMBRE DE PUAS ML
MADERA PARA ENCOFRADDO P2
CLAVOS KG
LIJA PARA MADERA UNID
LIJA PARA METAL UNID
PINTURA ANTICORROSIVA ES GLS
PINTURA ESMALTE GLS
PEGAMENTO PVC GLS
TEE PVC SAP 2" UND
UNION PVC SAP C10, 2" UNID
VALVULA DE BRONCE COMPUERTA 2" UNID
SOLDADURA CELLOCORD A.P. KG
THINNER GLN
TUBERIA FO NO 1"X2.5MM ML
CINTA TEFLON UND
ADAPTADOR PVC 2" UND
TAPON PVC SAP MACHO C10, 2" UND
TUBERIA FO NO 2 1/2"X3.3MM ML
PERFIL FIERRO ANGULO 1 1/4"X1 1/4"X1/8" ML
CODO PVC 90°,2" UND
UNION UNIVERSAL PVC SAP 2" UND
DETERGENTE KG
ESCOBILLA DE PLASTICO UND
SOLDADURA ELECTRICA KG
TEE PVC SAP 1 " UND
CODO PVC SAP 1 1/2" UND
CANASTILLA DE BRONCE 1/2" A 1" UND
REDUCCION PVC SAP C10, 1"X 1/2" UND
TUBO METALICO GALVANIZADO 3/4" DIA. ML
TUBO PVC SAP 1 1/2" C-7.5 ML
TUBO PVC SAP 1" C-7.5 ML
NIPLE PVC SAP 1 " UND
UNION UNIVERSAL PVC SAP 1 1/2" UND
CODO PVC SAP 2"X90° UND
CODO PVC SAP 2" UND
NIPLE PVC SAP 3/4" UND
VALVULA BRONCE COMPUERTA 1" UND
TUBERIA PVC SAP C10, 1 " ML
UNION PVC SAP C10, 1 " UND
VALVULA PVC COMPUERTA 3/4" UND
CODO PVC SAP 1 "X45° UND
CANASTILLA BRONCE 1 1/2" UND
REDUCCION PVC SAP C10,1 "X1/2" UND
ADAPTADOR PVC 3/4" UND
ADAPTADOR PVC 1/2" UND
UNION PVC SAP UNIVERSAL 1" UND
TUBO PVC SAP 1" C-7.5 ML
ADAPTADOR PVC 1" UND
UNION UNIVERSAL DE PVC DE 3/4" UND
GUANTES DE CUERO PAR
CASCO BLANCO NACIONAL 6 PUNTAS UND
CASCO ROJO NACIONAL 6 PUNTAS UND
GAFAS LENTES PROTECCION DE PLASTICO LUNA UND
RESPIRADOR PLASTICO SIMPLE UND
CEMENTO BOL

b.- FLETE LOCAL DE AGREGADOS

DESCRIPCION UND
ARENA GRUESA (NO AFECTO IGV) m3
PIEDRA CHANCADA 1/2" (NO AFECTO IGV) m3
HORMIGON (NO AFECTA IGV) m3
MATERIAL ZARANDEADO (NO AFECTA IGV) m3
CEMENTO BOL
ARENA FINA m3
VALVULA BRONCE COMPUERTA 3/4" UNID

153.00

b.- FLETE LOCAL DE AGREGADOS

DESCRIPCION UND

ARENA GRUESA (NO AFECTO IGV) m3


HORMIGON (NO AFECTA IGV) m3
CEMENTO BOL
PIEDRA CHANCADA 1/2" (NO AFECTO IGV) m3
ARENA FINA m3

volumen total

c.- PESO TOTAL PARA FLETE LOCAL

DESCRIPCION
DE MATERIALES
DE AGREGADOS

D) CANTIDAD DE MATERIALPOR VOLUMEN:


EN AGREGADOS
DESCRIPC. UNIDAD
PIEDRA CHANCADA 1/2" M3
ARENA GRUESA M3
ARENA FINA M3
Peso Total

E) FLETE TERRESTRE DE MATERIALES


Este flete se trata el costo del traslado del material del punto de venta has el lugar de almacen de la obra
DESCRIPCION unid metrado
Flete terrestre por peso (Ayacucho -ANTAPITE) Kg 10,432.05

Flete terrestre por Volumen (Rio puente C.- ANTAPITm3 26.00

E) TOTAL FLETE TERRESTRE (SIN IGV)


FLETE
SEGURA Y SANEAMIENTO EN LOS CC.PP. DE
Y ANTAPITE DISTRITO CONCEPCION PROVINCIA
MAN AYACUCHO"

P. PARCIAL
CANTIDAD PESO U.(kg)
(KG)
6.00 0.30 1.80
40.000 30.00 1,200.00
320.000 0.08 25.60
340.000 0.50 170.00
28.000 1.00 28.00
8.000 0.01 0.08
12.000 0.30 3.60
4.500 4.50 20.25
8.000 4.50 36.00
5.000 4.00 20.00
14.000 0.10 1.40
26.000 0.08 2.08
4.000 2.00 8.00
25.000 1.00 25.00
26.000 8.00 208.00
48.000 2.50 120.00
52.000 0.10 5.20
28.000 0.09 2.52
8.000 0.05 0.40
55.000 2.10 115.50
352.000 2.00 704.00
20.000 0.19 3.80
18.000 0.50 9.00
5.000 1.00 5.00
4.000 0.20 0.80
26.000 1.00 26.00
23.000 0.10 2.30
2.000 0.08 0.16
1.000 1.80 1.80
2.000 0.01 0.02
180.000 1.00 180.00
20.000 0.20 4.00
90.000 0.25 22.50
28.000 0.03 0.84
3.000 0.08 0.24
8.000 0.30 2.40
6.000 0.08 0.48
18.000 0.04 0.72
2.000 1.20 2.40
10.000 0.05 0.50
5.000 0.07 0.35
2.000 0.80 1.60
8.000 0.07 0.56
1.000 2.00 2.00
3.000 0.05 0.15
8.000 0.03 0.24
18.000 0.04 0.72
14.000 0.08 1.12
35.000 0.04 1.40
12.000 0.02 0.24
3.000 0.06 0.18
8.000 0.05 0.40
2.000 1.00 2.00
8.000 1.00 8.00
8.000 1.00 8.00
9.000 1.00 9.00
175.000 42.50 7,437.50

Peso Total 10,432.05

Kg/ m3 por P. PARCIAL


CANTIDAD
Unidad U. (m3)
12.00 1,900.00 22,800.00
13.00 2,300.00 29,900.00
0.00 -
-
175.00 42.50 7,437.50
1.00 1,700.00 1,700.00
3.00 -
-
Peso Total 61,837.50

Kg/ m3 por P. PARCIAL


CANTIDAD
Unidad U. (m3)
12.00 1,900.00 22,800.00

175.00 42.50
13.00 2,300.00 29,900.00
1.00 1,700.00 1,700.00

201.00 Peso Total 54,400.00

P. PARCIAL
(m3)
10,432.05
54,400.00

Peso Total 64,832.05

cantidad
13.00
12.00
1.00
26.00

cen de la obra
P.U Costo parcial
0.30 3,129.62

0.00 0.00

3,132.13
S/.
COSTO TOTAL DEL FLETE LOCAL

"CONTRIBUCION AL ACCESO DE AGUA SEGURA Y SANEAMIENTO EN LOS CC.PP. DE CONCEPCION, LLOCCEPATA, SANTA ROSA Y ANTAPITE DISTRITO
Proyecto :
CONCEPCION PROVINCIA VILCASHUAMAN AYACUCHO"
Ubicación : ANTAPITE

FLETE RURAL

TRANSPORTE DE MATERIALES, EQUIPOS Y HERRAMIENTAS A ZONAS SIN ACESO VEHICULAR


Peso total a transportar 64 832.05 Kg
Distancia promedio 0.15 Km
Velocidad promedio acemila 1.50 Km/h
Peso carga de acemila 50.00 kg
Alquiler de acemila S/. 30.00 x dia
Jornal diario ayudante S/. 60.00 x dia

Kg transp
x Und
Cuadrilla Cuadrilla( Costo por Viajes por Numero Costo
Materiales Und Cuadrilla cuadrilla(r transp x
(peon) acemila) dia S/. dia de dias total S/.
endimient dia (Kg)
ox 1 viaje)

CAPTACIÓN
Materiales transportados (Kg) Kg 1.00 4.00 4acem + 1pe 180.00 200.00 40.00 8,000.00 8.10 1,458.72

FLETE RURAL 1,458.53


CALCULO DEL FLETE
"CONTRIBUCION AL ACCESO DE AGUA SEGURA Y SANEAMIENTO EN L
OBRA: CC.PP. DE CONCEPCION, LLOCCEPATA, SANTA ROSA Y ANTAPITE DISTR
CONCEPCION PROVINCIA VILCASHUAMAN AYACUCHO"
1,- DATOS GENERALES DE CARGA
LOCALIDAD : LLOCCEPATA
a.- POR PESO

DESCRIPCION UND CANTIDAD

BOTENES DE SEGURIDAD PUNTA DE ACERO PAR 6.00


MALLA OLIMPICA #10 DE H=2M ML 80.000
ALAMBRE DE PUAS ML 1,421.600
MADERA PARA ENCOFRADDO P2 290.400
CLAVOS KG 22.400
LIJA PARA MADERA UNID 22.000
LIJA PARA METAL UNID 28.000
PINTURA ANTICORROSIVA ES GLS 4.500
PINTURA ESMALTE GLS 6.800
PEGAMENTO PVC GLS 2.000
TEE PVC SAP 2" UND 12.000
UNION PVC SAP C10, 2" UNID 35.000
VALVULA DE BRONCE COMPUERTA 2" UNID 8.000
SOLDADURA CELLOCORD A.P. KG 25.000
THINNER GLN 38.000
TUBERIA FO NO 1"X2.5MM ML 68.000
CINTA TEFLON UND 60.000
ADAPTADOR PVC 2" UND 120.000
TAPON PVC SAP MACHO C10, 2" UND 18.000
TUBERIA FO NO 2 1/2"X3.3MM ML 33.000
PERFIL FIERRO ANGULO 1 1/4"X1 1/4"X1/8" ML 352.000
CONO DE REBOSE PVC 3X2 UND 290.400
CODO PVC 90°,2" UND 20.000
UNION UNIVERSAL PVC SAP 2" UND 38.000
DETERGENTE KG 5.000
ESCOBILLA DE PLASTICO UND 1.000
SOLDADURA ELECTRICA KG 24.000
TEE PVC SAP 1 " UND 4.000
CODO PVC SAP 1 1/2" UND 0.889
CANASTILLA DE BRONCE 2" UND 0.649
REDUCCION PVC SAP C10, 3"X2" UND 0.072
TUBO METALICO GALVANIZADO 3/4" DIA. ML 0.450
TUBO PVC SAP 1 1/2" C-7.5 ML 11.577
TUBO PVC SAP 2" C-7.5 ML 0.912
REDUCCION PVC SAP C10 SP 2"-1 1/2" UND 53.900
NIPLE PVC SAP 1 " UND 28.000
UNION UNIVERSAL PVC SAP 1 1/2" UND 0.180
CODO PVC SAP 2"X90° UND 8.000
CODO PVC SAP 2" UND 162.000
NIPLE PVC SAP 3/4" UND 18.000
VALVULA BRONCE COMPUERTA 1" UND 8.000
TUBERIA PVC SAP C10, 1 " ML 10.000
UNION PVC SAP C10, 1 " UND 24.000
VALVULA PVC COMPUERTA 3/4" UND 4.000
CODO PVC SAP 1 "X45° UND 22.000
CANASTILLA BRONCE 1 1/2" UND 6.000
REDUCCION PVC SAP C10,1 "X1/2" UND 3.000
ADAPTADOR PVC 3/4" UND 8.000
ADAPTADOR PVC 1/2" UND 18.000
UNION PVC SAP UNIVERSAL 1" UND 14.000
VALVULA DE BRONCE FLOTADOR 3/4" UND 4.000
TUBO PVC SAP 1" C-7.5 ML 35.000
ADAPTADOR PVC 1" UND 12.000
UNION UNIVERSAL DE PVC DE 3/4" UND 3.000
ROLLIZO DE EUCALIPTO 4" L=2.6M UND 24.000
GUANTES DE CUERO PAR 8.000
CASCO BLANCO NACIONAL 6 PUNTAS UND 2.000
CASCO ROJO NACIONAL 6 PUNTAS UND 8.000
GAFAS LENTES PROTECCION DE PLASTICO LUNA UND 8.000
RESPIRADOR PLASTICO SIMPLE UND 9.000
CEMENTO BOL 58.000

b.- FLETE LOCAL DE AGREGADOS


DESCRIPCION UND CANTIDAD

ARENA GRUESA (NO AFECTO IGV) m3 4.50


PIEDRA CHANCADA 1/2" (NO AFECTO IGV) m3 4.50
HORMIGON (NO AFECTA IGV) m3 0.00
MATERIAL ZARANDEADO (NO AFECTA IGV) m3
CEMENTO BOL 58.00
PIEDRA MEDIANA m3
VALVULA BRONCE COMPUERTA 3/4" UNID

b.- FLETE LOCAL DE AGREGADOS

DESCRIPCION UND CANTIDAD

ARENA GRUESA (NO AFECTO IGV) m3 4.50


HORMIGON (NO AFECTA IGV) m3 0.00
CEMENTO BOL 58.00
PIEDRA CHANCADA 1/2" (NO AFECTO IGV) m3 4.50
ARENA FINA m3
volumen total 67.00

c.- PESO TOTAL PARA FLETE LOCAL

DESCRIPCION
DE MATERIALES
DE AGREGADOS

D) CANTIDAD DE MATERIALPOR VOLUMEN:


EN AGREGADOS
DESCRIPC. UNIDAD cantidad
PIEDRA CHANCADA 1/2" M3 4.50
ARENA GRUESA M3 4.50
ARENA FINA M3 0.00
Peso Total 9.00

E) FLETE TERRESTRE DE MATERIALES


Este flete se trata el costo del traslado del material del punto de venta has el lugar de almacen de la obra
DESCRIPCION unid metrado P.U
Flete terrestre por peso (Ayacucho - COLCABAMBA Kg 6,913.65 0.30

Flete terrestre por Volumen (Rio puente C.- Colcaba m3 9.00 0.00

TOTAL FLETE TERRESTRE (SIN IGV) S/.


ETE
EGURA Y SANEAMIENTO EN LOS
NTA ROSA Y ANTAPITE DISTRITO
SHUAMAN AYACUCHO"

P. PARCIAL
PESO U.(kg)
(KG)
0.30 1.80
30.00 2,400.00
0.08 113.73
0.50 145.20
1.00 22.40
0.01 0.22
0.30 8.40
4.50 20.25
4.50 30.60
4.00 8.00
0.10 1.20
0.08 2.80
2.00 16.00
1.00 25.00
8.00 304.00
2.50 170.00
0.10 6.00
0.09 10.80
0.05 0.90
2.10 69.30
2.00 704.00
0.20 58.08
0.19 3.80
0.50 19.00
1.00 5.00
0.20 0.20
1.00 24.00
0.10 0.40
0.08 0.07
1.80 1.17
0.01 0.00
1.00 0.45
0.20 2.32
0.25 0.23
0.06 3.23
0.03 0.84
0.08 0.01
0.30 2.40
0.08 12.96
0.04 0.72
1.20 9.60
0.05 0.50
0.07 1.68
0.80 3.20
0.07 1.54
2.00 12.00
0.05 0.15
0.03 0.24
0.04 0.72
0.08 1.12
0.30 1.20
0.04 1.40
0.02 0.24
0.06 0.18
8.00 192.00
0.05 0.40
1.00 2.00
1.00 8.00
1.00 8.00
1.00 9.00
42.50 2,465.00
Peso Total 6,913.65
Kg/ m3 por P. PARCIAL
Unidad U. (m3)
1,900.00 8,550.00
2,300.00 10,350.00
-
-
42.50 2,465.00
-
3.00 -
Peso Total 35,192.30

Kg/ m3 por P. PARCIAL


Unidad U. (m3)
1,900.00 8,550.00
-
42.50 2,465.00
2,300.00 10,350.00
-
Peso Total 21,365.00

P. PARCIAL
(m3)
6,913.65
21,365.00

Peso Total 28,278.65


acen de la obra
Costo parcial
2,074.09

0.00

2,072.02
COSTO TOTAL DEL FLETE LOCAL

"CONTRIBUCION AL ACCESO DE AGUA SEGURA Y SANEAMIENTO EN LOS CC.PP. DE CONCEPCION, LLOCCEPATA, SANTA ROSA Y ANTAPITE DISTRITO
Proyecto :
CONCEPCION PROVINCIA VILCASHUAMAN AYACUCHO"
Ubicación : LLOCCEPTA

FLETE RURAL

TRANSPORTE DE MATERIALES, EQUIPOS Y HERRAMIENTAS A ZONAS SIN ACESO VEHICULAR


Peso total a transportar 28 278.65 Kg
Distancia promedio 0.80 Km
Velocidad promedio acemila 1.50 Km/h
Peso carga de acemila 50.00 kg
Alquiler de acemila S/. 30.00 x dia
Jornal diario ayudante S/. 60.00 x dia

Kg transp
x Und
Cuadrilla Cuadrilla( Costo por Viajes por Numero Costo
Materiales Und Cuadrilla cuadrilla(r transp x
(peon) acemila) dia S/. dia de dias total S/.
endimient dia (Kg)
ox 1 viaje)

CAPTACIÓN
Materiales transportados (Kg) Kg 1.00 4.00 4acem + 1pe 180.00 200.00 7.50 1,500.00 18.85 3,393.44

FLETE RURAL 3,393.52


CALCULO DEL FLETE
"CONTRIBUCION AL ACCESO DE AGUA SEGURA Y SANEAMIENTO EN L
OBRA: CONCEPCION, LLOCCEPATA, SANTA ROSA Y ANTAPITE DISTRITO CO
PROVINCIA VILCASHUAMAN AYACUCHO"
1,- DATOS GENERALES DE CARGA
LOCALIDAD : CONCEPCION
a.- POR PESO

DESCRIPCION UND CANTIDAD

BOTENES DE SEGURIDAD PUNTA DE ACERO PAR 6.00


MALLA OLIMPICA #10 DE H=2M UNID 61.60
ALAMBRE DE PUAS ML 9.00
MADERA PARA ENCOFRADDO P2 290.40
CLAVOS KG 141.36
LIJA PARA MADERA UNID 4.81
LIJA PARA METAL UNID 27.95
PINTURA ANTICORROSIVA ES GLS 441.21
PINTURA ESMALTE GLS 51.14
PEGAMENTO PVC GLS 11.18
TEE PVC SAP 2" UND 1.37
UNION PVC SAP C10, 2" UNID 35.00
VALVULA DE BRONCE COMPUERTA 2" UNID 54.59
SOLDADURA CELLOCORD A.P. KG 11.00
THINNER GLN 87.12
TUBERIA FO NO 1"X2.5MM ML 52.70
CINTA TEFLON UND 85.00
ADAPTADOR PVC 2" UND 120.00
TAPON PVC SAP MACHO C10, 2" UND 13.00
TUBERIA FO NO 2 1/2"X3.3MM ML 33.00
PERFIL FIERRO ANGULO 1 1/4"X1 1/4"X1/8" ML 352.00
CONO DE REBOSE PVC 3X2 UND 290.40
CODO PVC 90°,2" UND 9.00
CANASTILLA DE PVC DE 3" A 2" UND 6.00
UNION UNIVERSAL PVC SAP 2" UND 38.00
DETERGENTE KG 3.00
ESCOBILLA DE PLASTICO UND 1.00
SOLDADURA ELECTRICA KG 24.00
TEE PVC SAP 1 1/2" UND 2.00
VALVULA BRONCE COMPUERTA 1 1/2" UND 0.10
CODO PVC SAP 1 1/2" UND 0.89
CANASTILLA DE BRONCE 2" UND 0.65
REDUCCION PVC SAP C10, 3"X2" UND 0.07
TUBO METALICO GALVANIZADO 3/4" DIA. ML 0.45
TUBO PVC SAP 1 1/2" C-7.5 ML 11.58
TUBO PVC SAP 2" C-7.5 ML 0.91
REDUCCION PVC SAP C10 SP 2"-1 1/2" UND 53.90
NIPLE PVC SAP 1 1/2" UND 11.80
NIPLE PVC SAP 3" UND 1.00
UNION UNIVERSAL PVC SAP 1 1/2" UND 0.18
CODO PVC SAP 2"X90° UND 8.00
LUCERITO UND 9.00
CODO PVC SAP 2" UND 228.80
NIPLE PVC SAP 3/4" UND 18.00
VALVULA BRONCE COMPUERTA 1" UND 40.00
TUBERIA PVC SAP C10, 1 1/2" ML 1.58
CLAVOS 5" KG 6.00
TEFLON ROLL 2.00
UNION PVC SAP C10, 1 1/2" UND 5.00
VALVULA PVC COMPUERTA 3/4" UND 2.04
CODO PVC SAP 1 1/2"X45° UND 36.00
CANASTILLA BRONCE 2" UND 4.00
CONO DE REBOSE PVC 4"X2" UND 10.00
REDUCCION PVC SAP C10,1 1/2"X1" UND 35.00
ADAPTADOR PVC 3/4" UND 12.00
ADAPTADOR PVC 1 1/2" UND 6.00
UNION PVC SAP UNIVERSAL 1" UND 4.00
VALVULA DE BRONCE FLOTADOR 1 1/2" UND 4.00
TUBO PVC SAP 1" C-7.5 ML 21.00
ADAPTADOR PVC 1" UND 12.00
UNION UNIVERSAL DE PVC DE 3/4" UND 3.00
ROLLIZO DE EUCALIPTO 5" L=2.6M UND 1.00
GUANTES DE CUERO PAR 1.00
CASCO BLANCO NACIONAL 6 PUNTAS UND 7.50
CASCO ROJO NACIONAL 6 PUNTAS UND 3.00
GAFAS LENTES PROTECCION DE PLASTICO LUNA UND 2.00
RESPIRADOR PLASTICO SIMPLE UND 9.00
CEMENTO BOL 121.00

b.- FLETE LOCAL DE AGREGADOS

DESCRIPCION UND CANTIDAD

ARENA GRUESA (NO AFECTO IGV) m3 10.50


PIEDRA CHANCADA 1/2" (NO AFECTO IGV) m3 10.50
HORMIGON (NO AFECTA IGV) m3 3.80
PIEDRA MEDIANA m3 1.05
ARENA FINA m3 2.50
volumen total 28.35

c.- PESO TOTAL PARA FLETE LOCAL

DESCRIPCION

ARENA GRUESA (NO AFECTO IGV) m3 10.50


HORMIGON (NO AFECTA IGV) m3 3.80
PIEDRA CHANCADA 1/2" (NO AFECTO IGV) m3 10.50
ARENA FINA m3 2.50
PIEDRA MEDIANA m3 0.40

c.- PESO TOTAL PARA FLETE LOCAL

DESCRIPCION
DE MATERIALES
DE AGREGADOS

B) CANTIDAD DE MATERIALPOR VOLUMEN:


EN AGREGADOS
DESCRIPC. UNIDAD cantidad
PIEDRA CHANCADA 1/2" M3 10.50
ARENA GRUESA M3 10.50
PIEDRA MEDIANA M3 0.40
HORMIGON M3 3.80
ARENA FINA M3 2.50
Peso Total 16.80

C) FLETE TERRESTRE DE MATERIALES


Este flete se trata el costo del traslado del material del punto de venta has el lugar de almacen de la obra
DESCRIPCION unid metrado P.U
Flete terrestre por peso (Ayacucho - Concepci Kg 11,533.36 0.30

Flete terrestre por Volumen (Rio puente ) m3 16.80 0.00

D ) TOTAL FLETE TERRESTRE (SIN IGV) S/.


SANEAMIENTO EN LOS CC.PP. DE
APITE DISTRITO CONCEPCION
YACUCHO"

P. PARCIAL
PESO U.(kg)
(KG)
0.30 1.80
30.00 1,848.00
0.08 0.72
0.50 145.20
1.00 141.36
0.01 0.05
0.30 8.38
4.50 1,985.45
4.50 230.13
4.00 44.70
0.10 0.14
0.08 2.80
2.00 109.17
1.00 11.00
8.00 696.96
2.50 131.75
0.10 8.50
0.09 10.80
0.05 0.65
2.10 69.30
2.00 704.00
0.20 58.08
0.19 1.71
0.30 1.80
0.50 19.00
1.00 3.00
0.20 0.20
1.00 24.00
0.10 0.20
1.50 0.14
0.08 0.07
1.80 1.17
0.01 0.00
1.00 0.45
0.20 2.32
0.25 0.23
0.06 3.23
0.03 0.35
0.04 0.04
0.08 0.01
0.30 2.40
0.04 0.36
0.08 18.30
0.04 0.72
1.20 48.00
0.05 0.08
1.00 6.00
0.03 0.06
0.07 0.35
0.80 1.63
0.07 2.52
2.00 8.00
0.09 0.90
0.05 1.75
0.03 0.36
0.04 0.24
0.08 0.32
0.30 1.20
0.04 0.84
0.02 0.24
0.06 0.18
8.00 8.00
0.05 0.05
1.00 7.50
1.00 3.00
1.00 2.00
1.00 9.00
42.50 5,142.50
Peso Total 11,533.36

Kg/ m3 por P. PARCIAL


Unidad U. (m3)
1,900.00 19,950.00
2,300.00 24,150.00
2,100.00 7,980.00
1,400.00 1,470.00
1,400.00 3,500.00
Peso Total 57,050.00

P. PARCIAL
(m3)
1,900.00 19,950.00
2,100.00 7,980.00
2,300.00 24,150.00
1,700.00 4,250.00
1,500.00 600.00
Peso Total 56,930.00

P. PARCIAL
(m3)
11,533.36
56,930.00

Peso Total 68,463.36


Costo parcial
3,460.01

0.00

3,469.43
COSTO TOTAL DEL FLETE LOCAL

"CONTRIBUCION AL ACCESO DE AGUA SEGURA Y SANEAMIENTO EN LOS CC.PP. DE CONCEPCION, LLOCCEPATA, SANTA ROSA Y ANTAPITE DISTRITO
Proyecto :
CONCEPCION PROVINCIA VILCASHUAMAN AYACUCHO"
Ubicación : CONCEPCION

FLETE RURAL

TRANSPORTE DE MATERIALES, EQUIPOS Y HERRAMIENTAS A ZONAS SIN ACESO VEHICULAR


Peso total a transportar 68 463.36 Kg
Distancia promedio 0.10 Km
Velocidad promedio acemila 1.50 Km/h
Peso carga de acemila 50.00 kg
Alquiler de acemila S/. 30.00 x dia
Jornal diario ayudante S/. 60.00 x dia

Kg transp
x Und
Cuadrilla Cuadrilla( Costo por Viajes por Numero Costo
Materiales Und Cuadrilla cuadrilla(r transp x
(peon) acemila) dia S/. dia de dias total S/.
endimient dia (Kg)
ox 1 viaje)

CAPTACIÓN
Materiales transportados (Kg) Kg 1.00 4.00 4acem + 1pe 180.00 200.00 60.00 12,000.00 5.71 1,026.95

FLETE RURAL 1,030.69


CALCULO DEL FLETE
"CONTRIBUCION AL ACCESO DE AGUA SEGURA Y SANEAMIENTO EN
OBRA: CONCEPCION, LLOCCEPATA, SANTA ROSA Y ANTAPITE DISTRITO CONCE
VILCASHUAMAN AYACUCHO"
1,- DATOS GENERALES DE CARGA
LOCALIDAD : SANTA ROSA
a.- POR PESO

DESCRIPCION UND

BOTENES DE SEGURIDAD PUNTA DE ACERO PAR


MALLA OLIMPICA #10 DE H=2M UNID
ALAMBRE DE PUAS ML
MADERA PARA ENCOFRADDO P2
CLAVOS KG
LIJA PARA MADERA UNID
LIJA PARA METAL UNID
PINTURA ANTICORROSIVA ES GLS
PINTURA ESMALTE GLS
PEGAMENTO PVC GLS
TEE PVC SAP 2" UND
UNION PVC SAP C10, 2" UNID
VALVULA DE BRONCE COMPUERTA 2" UNID
SOLDADURA CELLOCORD A.P. KG
THINNER GLN
TUBERIA FO NO 1"X2.5MM ML
CINTA TEFLON UND
ADAPTADOR PVC 2" UND
TAPON PVC SAP MACHO C10, 2" UND
TUBERIA FO NO 2 1/2"X3.3MM ML
PERFIL FIERRO ANGULO 1 1/4"X1 1/4"X1/8" ML
CONO DE REBOSE PVC 3X2 UND
CODO PVC 90°,2" UND
CANASTILLA DE PVC DE 3" A 2" UND
UNION UNIVERSAL PVC SAP 2" UND
DETERGENTE KG
ESCOBILLA DE PLASTICO UND
SOLDADURA ELECTRICA KG
TEE PVC SAP 1 1/2" UND
VALVULA BRONCE COMPUERTA 1 1/2" UND
CODO PVC SAP 1 1/2" UND
CANASTILLA DE BRONCE 2" UND
REDUCCION PVC SAP C10, 3"X2" UND
TUBO METALICO GALVANIZADO 3/4" DIA. ML
TUBO PVC SAP 1 1/2" C-7.5 ML
TUBO PVC SAP 2" C-7.5 ML
REDUCCION PVC SAP C10 SP 2"-1 1/2" UND
NIPLE PVC SAP 1 1/2" UND
NIPLE PVC SAP 3" UND
UNION UNIVERSAL PVC SAP 1 1/2" UND
CODO PVC SAP 2"X90° UND
LUCERITO UND
CODO PVC SAP 2" UND
NIPLE PVC SAP 3/4" UND
VALVULA BRONCE COMPUERTA 1" UND
TUBERIA PVC SAP C10, 1 1/2" ML
CLAVOS 5" KG
TEFLON ROLL
UNION PVC SAP C10, 1 1/2" UND
VALVULA PVC COMPUERTA 3/4" UND
CODO PVC SAP 1 1/2"X45° UND
CANASTILLA BRONCE 2" UND
CONO DE REBOSE PVC 4"X2" UND
REDUCCION PVC SAP C10,1 1/2"X1" UND
ADAPTADOR PVC 3/4" UND
ADAPTADOR PVC 1 1/2" UND
UNION PVC SAP UNIVERSAL 1" UND
VALVULA DE BRONCE FLOTADOR 1 1/2" UND
TUBO PVC SAP 1" C-7.5 ML
ADAPTADOR PVC 1" UND
UNION UNIVERSAL DE PVC DE 3/4" UND
ROLLIZO DE EUCALIPTO 5" L=2.6M UND
GUANTES DE CUERO PAR
CASCO BLANCO NACIONAL 6 PUNTAS UND
CASCO ROJO NACIONAL 6 PUNTAS UND
GAFAS LENTES PROTECCION DE PLASTICO LUNA UND
RESPIRADOR PLASTICO SIMPLE UND
BOTAS DE JEBE PAR
CEMENTO BOL

b.- FLETE LOCAL DE AGREGADOS

DESCRIPCION UND

ARENA GRUESA (NO AFECTO IGV) m3


PIEDRA CHANCADA 1/2" (NO AFECTO IGV) m3
HORMIGON (NO AFECTA IGV) m3
PIEDRA MEDIANA m3

b.- FLETE LOCAL DE AGREGADOS

DESCRIPCION UND

ARENA GRUESA (NO AFECTO IGV) m3


HORMIGON (NO AFECTA IGV) m3
PIEDRA CHANCADA 1/2" (NO AFECTO IGV) m3
ARENA FINA m3
PIEDRA MEDIANA m3
volumen total

c.- PESO TOTAL PARA FLETE LOCAL

DESCRIPCION
DE MATERIALES
DE AGREGADOS
D) CANTIDAD DE MATERIALPOR VOLUMEN:
EN AGREGADOS
DESCRIPC. UNIDAD
PIEDRA CHANCADA 1/2" M3
ARENA GRUESA M3
PIEDRA MEDIANA M3
HORMIGON M3
ARENA FINA M3
Peso Total

E) FLETE TERRESTRE DE MATERIALES


Este flete se trata el costo del traslado del material del punto de venta has el lugar de almacen de la obra
DESCRIPCION unid metrado
Flete terrestre por peso (Ayacucho - Santa Rosa) Kg 11,276.35

Flete terrestre por Volumen (Rio) m3 1.60

E) TOTAL FLETE TERRESTRE (SIN IGV)


FLETE
SEGURA Y SANEAMIENTO EN LOS CC.PP. DE
Y ANTAPITE DISTRITO CONCEPCION PROVINCIA
MAN AYACUCHO"

P. PARCIAL
CANTIDAD PESO U.(kg)
(KG)
6.00 0.30 1.80
219.600 10.00 2,196.00
1,339.600 0.08 107.17
328.221 0.50 164.11
11.164 1.00 11.16
12.361 0.01 0.12
331.796 0.30 99.54
44.796 4.50 201.58
4.941 4.50 22.23
0.470 4.00 1.88
39.000 0.10 3.90
38.000 0.08 3.04
3.000 2.00 6.00
65.880 1.00 65.88
55.434 8.00 443.47
219.600 2.50 549.00
2.000 0.10 0.20
4.000 0.09 0.36
57.000 0.05 2.85
439.200 2.10 922.32
219.600 2.00 439.20
18.000 0.20 3.60
6.000 0.19 1.14
2.000 0.30 0.60
6.000 0.50 3.00
4.000 1.00 4.00
4.000 0.20 0.80
1.000 1.00 1.00
6.000 0.10 0.60
23.000 1.50 34.50
39.000 0.08 3.12
1.000 1.80 1.80
17.000 0.01 0.17
18.000 1.00 18.00
5.000 0.20 1.00
5.000 0.25 1.25
1.000 0.06 0.06
9.000 0.03 0.27
1.000 0.04 0.04
14.000 0.08 1.12
4.000 0.30 1.20
32.000 0.04 1.28
48.000 0.08 3.84
8.000 0.04 0.32
4.000 1.20 4.80
10.300 0.05 0.52
16.000 1.00 16.00
8.000 0.03 0.24
17.000 0.07 1.19
4.000 0.80 3.20
2.000 0.07 0.14
16.000 2.00 32.00
16.000 0.09 1.44
4.000 0.05 0.20
8.000 0.03 0.24
56.000 0.04 2.24
8.000 0.08 0.64
16.000 0.30 4.80
12.000 0.04 0.48
8.000 0.02 0.16
8.000 0.06 0.48
128.000 8.00 1,024.00
3.000 0.05 0.15
1.000 1.00 1.00
3.000 1.00 3.00
3.000 1.00 3.00
6.000 1.00 6.00
3.000 0.30 0.90
114.00 42.50 4,845.00
Peso Total 11,276.35

Kg/ m3 por P. PARCIAL


CANTIDAD
Unidad U. (m3)
1.00 1,900.00 1,900.00
1.00 2,300.00 2,300.00
0.50 2,100.00 1,050.00
0.40 1,400.00 560.00

Peso Total 5,810.00

Kg/ m3 por P. PARCIAL


CANTIDAD
Unidad U. (m3)
4.70 1,900.00 8,930.00
0.20 2,100.00 420.00
5.20 2,300.00 11,960.00
1,700.00 -
0.40 1,500.00 600.00
10.50 Peso Total 21,910.00

P. PARCIAL
(m3)
11,276.35
5,810.00

Peso Total 17,086.35


cantidad
1.00
0.00
0.40
0.20
0.00
1.60

cen de la obra
P.U Costo parcial
0.30 3,382.90

0.00 0.00

3,373.05
S/.
COSTO TOTAL DEL FLETE LOCAL

"CONTRIBUCION AL ACCESO DE AGUA SEGURA Y SANEAMIENTO EN LOS CC.PP. DE CONCEPCION, LLOCCEPATA, SANTA ROSA Y ANTAPITE DISTRITO
Proyecto :
CONCEPCION PROVINCIA VILCASHUAMAN AYACUCHO"
Ubicación : SANTA ROSA

FLETE RURAL

TRANSPORTE DE MATERIALES, EQUIPOS Y HERRAMIENTAS A ZONAS SIN ACESO VEHICULAR


Peso total a transportar 17 086.35 Kg
Distancia promedio 1.50 Km
Velocidad promedio acemila 1.50 Km/h
Peso carga de acemila 50.00 kg
Alquiler de acemila S/. 30.00 x dia
Jornal diario ayudante S/. 60.00 x dia

Kg transp
x Und
Cuadrilla Cuadrilla( Costo por Viajes por Numero Costo
Materiales Und Cuadrilla cuadrilla(r transp x
(peon) acemila) dia S/. dia de dias total S/.
endimient dia (Kg)
ox 1 viaje)

CAPTACIÓN
Materiales transportados (Kg) Kg 1.00 4.00 4acem + 1pe 180.00 200.00 4.00 800.00 21.36 3,844.43

FLETE RURAL 3,840.79