MINGGU KE-1
CONTRACTOR BY :
PT. BORNES CITRANUSA
WEEKLY REPORT
MINGGU KE-1
CONTRACTOR BY :
PT. BORNES CITRANUSA
FOTO PROGRESS
PT. BORNES CIRANUSA
S-CURVE TIME SCHEDULE CONSTRUCT
JEMBATAN HD785 BMO
Des JANUARI FEBRUARI M
NO DESCRIPTION BOBOT
27-2 3-9 10-16 17-23 24-30 31-6 7-13 14-20 21-27 28-6
A I GENERAL REQUIREMENTS (2 UNIT)
1 Mobilization and demobilization of equipment and plant to site 2.78 0.13 0.13 0.13 0.13 0.13
2 Safety health and welfare 0.54 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
3 Temporary working, strorage and workshop, contractor office facilities 0.45 0.15 0.15 0.15
4 Design analysis, drawing, administration cost adn other cost 1.21 0.20 0.20 0.20 0.20 0.20 0.20
5 All testing requires cost and tools 0.58 0.10 0.10 0.10 0.10 0.10 0.10
II Equipment rent
1 Crawler rent 90 ton (crane support) 5.41 0.28 0.28
2 Crawler rent 40 ton (crane support) 3.87 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles 0.06 0.02
0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
97.91
0.02
94.50
91.69
89.28
0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28
0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
85.850.08
0.18
65.96
1.06 1.06
0.02 0.02
0.05521 0.055207
45.52 0.08
41.29
49.61
45.52
41.290.03 0.03
40
39.14 0.01 0.01
37.47
1.25 1.25 1.25 1.25 1.25 1.25
1.7779394086 1.777939409
0.5396 0.5396
0.23
0.54 0.54
0.0626300862 0.062630086
0.11
0.08
0.78 0
4.23 4.09 3.04 3.60 5.08 4.64 4.31 2.31 2.45 2.65 3.16 5.00 3.43 2.41 2.81 3.41 2.08 0.02
45.52 49.61 52.65 56.25 61.32 65.96 70.28 72.59 75.03 77.68 80.84 85.85 89.28 91.69 94.50 97.91 99.98 100
UNIT PRICE AMOUNT
NO DESCRIPTION UNIT QUANTITY BOBOT
IDR IDR
A I GENERAL REQUIREMENTS (2 UNIT)
1 Mobilization and demobilization of equipment and plant to site LS 1 900,000,000 900,000,000 2.78
2 Safety health and welfare LS 1 175,000,000 175,000,000 0.54
3 Temporary working, strorage and workshop, contractor office facilities LS 1 145,000,000 145,000,000 0.45
4 Desighn analysis, drawing, administration cost adn other cost LS 1 390,000,000 390,000,000 1.21
5 All testing requires cost and tools LS 1 187,500,000 187,500,000 0.58
II Equipment rent
1 Crawler rent 90 ton (crane support) month 5 350,000,000 1,750,000,000 5.41
2 Crawler rent 40 ton (crane support) month 5 250,000,000 1,250,000,000 3.87
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000 2,425,231,900.00 7.50
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000 895,086,010.00 2.77
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000 116,160,000.00 0.36
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000 1,149,711,750.00 3.56
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000 348,964,000.00 1.08
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667 5,262,920,520.00 16.28
2 Driving and jointing steel pile m3 1,560.00 1,100,000 1,716,000,000.00 5.31
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000 18,200,000.00 0.06
4 Pile head treatment (K-300) m3 73.48 5,950,000 437,182,200.00 1.35
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000 84,579,000.00 0.26
6 PDA Test for Bridge ea 3.00 25,000,000 75,000,000.00 0.23
7 Gabion m3 180.00 1,950,000 351,000,000.00 1.09
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000 2,425,231,900.00 7.50
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000 895,086,010.00 2.77
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000 116,160,000.00 0.36
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000 1,149,711,750.00 3.56
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000 348,964,000.00 1.08
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667 5,262,920,520.00 16.28
2 Driving and jointing steel pile m3 1,560.00 1,100,000 1,716,000,000.00 5.31
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000 18,200,000.00 0.06
4 Pile head treatment (K-300) m3 73.48 5,950,000 437,182,200.00 1.35
5 Reinforced lining protection/soil embakment protection (K 300, form work + support m3 13.98 6,050,000 84,579,000.00 0.26
6 PDA Test for Bridge ea 3.00 25,000,000 75,000,000.00 0.23
7 Gabion m3 180.00 1,950,000 351,000,000.00 1.09
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker Ea 44.00 5,750,000 253,000,000.00 0.78
TOTAL 32,332,703,365.66 (100)
BOBOT RENCANA PER MINGGU
KUMULATIF BOBOT RENCANA PER MINGGU
DESEMEBER
1 2 3
27 28 29 30 31 1 2 TOTAL 3 4 5 6 7 8 9 10 11 12 13 14 15
- 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01 0.01 0.01
0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.037 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.037 0.01 0.01 0.01 0.01 0.01 0.01
- -
- - - 0.02 0.02 0.02 0.02 0.02 0.02
- - 0.02 0.02 0.02 0.02 0.02 0.02
- -
- -
0.18 - -
- - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 11.14 11.14 11.14 11.14 11.14 11.14
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 11.14 11.14 11.14 11.14 11.14 11.14
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
JANUARI
4 5
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0.01 0.04 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04
0.01 0.037 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04
0.05 0.02 0.02 0.02 0.02 0.02 0.02 0.18 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.15
0.02 0.17 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.17 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.17
0.02 0.17 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.17 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.17
- -
- -
- - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
0.81 78.00
- - - - - - - - - - - - - - - - - -
11.14 78.00 11.14 11.14 11.14 11.14 11.14 11.14 11.14 78.00 11.14 11.14 11.14 11.14 11.14 11.14 11.14 78.00
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
11.14 78.00 11.14 11.14 11.14 11.14 11.14 11.14 11.14 78.00 11.14 11.14 11.14 11.14 11.14 11.14 11.14 78.00
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
FEBRUARI
6 7 8
31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01
0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01
0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.15 - - - - - - - - - - - -
0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.17 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.17 0.02 0.02 0.02 0.02
0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.17 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.17 0.02 0.02 0.02 0.02
- -
- -
- 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.18
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
11.14 11.14 11.14 11.14 11.14 11.14 11.14 78.00 178.29 178.29 178.29 178.29 178.29 178.29 178.29 1,248.00 - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
11.14 11.14 11.14 11.14 11.14 11.14 11.14 78.00 178.29 178.29 178.29 178.29 178.29 178.29 178.29 1,248.00 - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
M
9 10
18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12
0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04
0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01 0.01 0.01
- - - - - - - - - - - - - - - - - - - -
0.02 0.02 0.02 0.17 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.10 - - - - - - - -
0.02 0.02 0.02 0.17 - - - - - - - - - - - - - - - -
- - -
- -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - ` - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
MARET
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3
- - - -
0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - -
- - - -
- - - -
- - - -
- - - -
- - -
- - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Minggu Ke - 1: 7 Februari s/d 13 Februari 2018
Proyek : Pembangunan Jembatan HD 785
Owner : Berau Coal
NO DESCRIPTION
II EQUIPMENT RENT
1 crawler rent 90 ton (crane support)
2 crawler rent 40 ton (crane support)
SUB TOTAL II (EQUIPMENT RENT)
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL C ( CONCRETE WORK)
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB TOTAL D (FOUNDATION WORK)
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Instal pedestrian metal railing
5 Supply and install drainage spots
SUB TOTAL E (STRUCTURE WORK)
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL G (CONCRETE WORK)
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB SUB TOTAL H (FOUNDATION WORK)
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker
SUB TOTAL J (MISC WORK)
TOTAL
Diperiksa & disetujui oleh:
month 5.41
month 3.87 - - 0.183 0.141 0.183
9.28
m3 0.06
m2 0.02
0.08
m3 7.50
m3 2.77
m3 0.36
m3 3.56
m3 1.08
15.26
m3 0.06
m2 0.02
0.08
m3 7.50
m3 2.77
m3 0.36
m3 3.56
m3 1.08
15.26
kg 1.09
kg 0.87
m' 0.13
m' 0.11
ls 0.08
2.27
Ea 0.78
0.78
peration (BMO)
M.7
ID/XI/2017
AAN BOBOT
S/D MINGGU INI PERSENTASE
Bobot (%) %
0.615 22.105
0.140 25.926
0.214 47.619
1.005 83.333
0.483 83.333
0.141 3.657
16.277 100.000
16.277 100.000
35.15
PJO
Arnold
Minggu Ke - 1: 31 Januari s/d 6 Februari 2018
Proyek : Pembangunan Jembatan HD 785
Owner : Berau Coal
NO DESCRIPTION
II EQUIPMENT RENT
1 crawler rent 90 ton (crane support)
2 crawler rent 40 ton (crane support)
SUB TOTAL II (EQUIPMENT RENT)
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL C ( CONCRETE WORK)
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB TOTAL D (FOUNDATION WORK)
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Instal pedestrian metal railing
5 Supply and install drainage spots
SUB TOTAL E (STRUCTURE WORK)
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL G (CONCRETE WORK)
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB SUB TOTAL H (FOUNDATION WORK)
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker
SUB TOTAL J (MISC WORK)
TOTAL
Diperiksa & disetujui oleh:
month 5.41
month 3.87
9.28
m3 0.06
m2 0.02
0.08
m3 7.50
m3 2.77
m3 0.36
m3 3.56
m3 1.08
15.26
m3 0.06
m2 0.02
0.08
m3 7.50
m3 2.77
m3 0.36
m3 3.56
m3 1.08
15.26
kg 1.09
kg 0.87
m' 0.13
m' 0.11
ls 0.08
2.27
Ea 0.78
0.78
peration (BMO)
M.6
ID/XI/2017
AAN BOBOT
S/D MINGGU INI PERSENTASE
Bobot (%) %
0.513 18.421
0.120 22.222
0.214 47.619
0.804 66.667
0.387 66.667
3.255 20.000
3.255 20.000
8.55
PJO
Arnold
Minggu Ke - 1: 24 januari s/d 30 Januari 2018
Proyek : Pembangunan Jembatan HD 785
Owner : Berau Coal
NO DESCRIPTION
II EQUIPMENT RENT
1 crawler rent 90 ton (crane support)
2 crawler rent 40 ton (crane support)
SUB TOTAL II (EQUIPMENT RENT)
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL C ( CONCRETE WORK)
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB TOTAL D (FOUNDATION WORK)
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Instal pedestrian metal railing
5 Supply and install drainage spots
SUB TOTAL E (STRUCTURE WORK)
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL G (CONCRETE WORK)
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB SUB TOTAL H (FOUNDATION WORK)
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker
SUB TOTAL J (MISC WORK)
TOTAL
Diperiksa & disetujui oleh:
month 5.41
month 3.87
9.28 -
m3 0.06
m2 0.02
0.08 -
m3 7.50
m3 2.77
m3 0.36
m3 3.56
m3 1.08
15.26 -
m3 0.06
m2 0.02
0.08
m3 7.50
m3 2.77
m3 0.36
m3 3.56
m3 1.08
15.26
kg 1.09
kg 0.87
m' 0.13
m' 0.11
ls 0.08
2.27
Ea 0.78
0.78
peration (BMO)
M.5
ID/XI/2017
AAN BOBOT
S/D MINGGU INI PERSENTASE
Bobot (%) %
0.410 14.737
0.100 18.519
0.146 32.619
0.603 50.000
0.290 50.000
2.442 15.000
2.442 15.000
6.43
PJO
Arnold
Minggu Ke - 1: 17 Januari s/d 23 Januari 2018
Proyek : Pembangunan Jembatan HD 785
Owner : Berau Coal
NO DESCRIPTION
II EQUIPMENT RENT
1 crawler rent 90 ton (crane support)
2 crawler rent 40 ton (crane support)
SUB TOTAL II (EQUIPMENT RENT)
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL C ( CONCRETE WORK)
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB TOTAL D (FOUNDATION WORK)
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Instal pedestrian metal railing
5 Supply and install drainage spots
SUB TOTAL E (STRUCTURE WORK)
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL G (CONCRETE WORK)
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB SUB TOTAL H (FOUNDATION WORK)
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker
SUB TOTAL J (MISC WORK)
TOTAL
Diperiksa & disetujui oleh:
month 5.41 -
month 3.87 -
9.28 - - - - -
m3 0.06 -
m2 0.02 -
0.08 - - - - -
m3 7.50 -
m3 2.77 -
m3 0.36 -
m3 3.56 -
m3 1.08 -
15.26 - - -
m3 0.06 -
m2 0.02 -
0.08 - - - -
m3 7.50 -
m3 2.77 -
m3 0.36 -
m3 3.56 -
m3 1.08 -
15.26 - - - - -
kg 1.09 -
kg 0.87 -
m' 0.13 -
m' 0.11 -
ls 0.08 -
2.27 - - - -
Ea 0.78 -
0.78 - - - -
peration (BMO)
M.4
ID/XI/2017
AAN BOBOT
S/D MINGGU INI PERSENTASE
Bobot (%) %
0.308 11.053
0.080 14.815
0.079 17.619
0.402 33.333
0.193 33.333
1.062
1.628 10.000
1.628
-
1.628 10.000
1.628
4.32
PJO
Arnold
Minggu Ke - 1: 10 Januari s/d 16 Januari 2018
Proyek : Pembangunan Jembatan HD 785
Owner : Berau Coal
NO DESCRIPTION
II EQUIPMENT RENT
1 crawler rent 90 ton (crane support)
2 crawler rent 40 ton (crane support)
SUB TOTAL II (EQUIPMENT RENT)
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL C ( CONCRETE WORK)
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB TOTAL D (FOUNDATION WORK)
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Instal pedestrian metal railing
5 Supply and install drainage spots
SUB TOTAL E (STRUCTURE WORK)
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL G (CONCRETE WORK)
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB SUB TOTAL H (FOUNDATION WORK)
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker
SUB TOTAL J (MISC WORK)
TOTAL
Diperiksa & disetujui oleh:
month 5.41
month 3.87
9.28
m3 0.06
m2 0.02
0.08
m3 7.50
m3 2.77
m3 0.36
m3 3.56
m3 1.08
15.26
m3 0.06
m2 0.02
0.08
m3 7.50
m3 2.77
m3 0.36
m3 3.56
m3 1.08
15.26
kg 1.09
kg 0.87
m' 0.13
m' 0.11
ls 0.08
2.27
Ea 0.78
0.78
peration (BMO)
M.3
ID/XI/2017
AAN BOBOT
S/D MINGGU INI PERSENTASE
Bobot (%) %
0.205 7.368
0.060 11.111
-
0.201 16.667
0.097 16.667
0.814 5.000
0.814 5.000
2.19
PJO
Arnold
Minggu Ke - 1: 27 Des s/d 2 Januari 2017
Proyek : Pembangunan Jembatan HD 785
Owner : Berau Coal
NO DESCRIPTION
II EQUIPMENT RENT
1 crawler rent 90 ton (crane support)
2 crawler rent 40 ton (crane support)
SUB TOTAL II (EQUIPMENT RENT)
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL C ( CONCRETE WORK)
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB TOTAL D (FOUNDATION WORK)
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Instal pedestrian metal railing
5 Supply and install drainage spots
SUB TOTAL E (STRUCTURE WORK)
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL G (CONCRETE WORK)
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB SUB TOTAL H (FOUNDATION WORK)
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker
SUB TOTAL J (MISC WORK)
TOTAL
Diperiksa & disetujui oleh:
KEMAJUA
UNIT UNIT PRICE AMOUNT BOBOT MINGGU LALU
QUANTITY
IDR IDR Volume
32,332,703,365.66 100.00
Dibuat oleh:
PT. Bornes Ci
CHID Departement Head Site Manager Site Engin
Reo Andreas Bambang Tutuko Ronald
Report No.
NO DESCRIPTION
II EQUIPMENT RENT
1 crawler rent 90 ton (crane support)
2 crawler rent 40 ton (crane support)
SUB TOTAL II (EQUIPMENT RENT)
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL C ( CONCRETE WORK)
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB TOTAL D (FOUNDATION WORK)
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Instal pedestrian metal railing
5 Supply and install drainage spots
SUB TOTAL E (STRUCTURE WORK)
G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL G (CONCRETE WORK)
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB SUB TOTAL H (FOUNDATION WORK)
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker
SUB TOTAL J (MISC WORK)
TOTAL
Diperiksa & disetujui oleh:
LS 2.78
LS 0.54 0.037 0.020 0.037
LS 0.45
LS 1.21
LS 0.58
5.56
month 5.41
month 3.87
9.28
m3 0.06
m2 0.02
0.08
m3 7.50
m3 2.77
m3 0.36
m3 3.56
m3 1.08
15.26
m' 16.28
m3 5.31
Ea 0.06
m3 1.35
m3 0.26
ea 0.23
m3 1.09
24.57
kg 1.09
kg 0.87
m' 0.13
m' 0.11
ls 0.08
2.27
m3 0.06
m2 0.02
0.08
m3 7.50
m3 2.77
m3 0.36
m3 3.56
m3 1.08
15.26
m' 16.28
m3 5.31
Ea 0.06
m3 1.35
m3 0.26
ea 0.23
m3 1.09
24.57
kg 1.09
kg 0.87
m' 0.13
m' 0.11
ls 0.08
2.27
Ea 0.78
0.78
100.00 - 0.020
Dibuat oleh:
Operation (BMO)
M.1
HID/XI/2017
JAAN BOBOT
S/D MINGGU INI PERSENTASE
Bobot (%) %
0.020 3.704
0.020
PJO
Arnold