WEEKLY REPORT

PEMBANGUNAN JEMBATAN HD BLOK 5&6


BINUNGAN MINE OPERATION
PT. BERAU COAL

MINGGU KE-1

27 DESEMBER 2017 s/d 2 JANUARI 2018

CONTRACTOR BY :
PT. BORNES CITRANUSA
WEEKLY REPORT

MBANGUNAN JEMBATAN HD BLOK 5&6


BINUNGAN MINE OPERATION
PT. BERAU COAL

MINGGU KE-1

27 DESEMBER 2017 s/d 2 JANUARI 2018

CONTRACTOR BY :
PT. BORNES CITRANUSA
FOTO PROGRESS
PT. BORNES CIRANUSA
S-CURVE TIME SCHEDULE CONSTRUCT
JEMBATAN HD785 BMO
Des JANUARI FEBRUARI M
NO DESCRIPTION BOBOT
27-2 3-9 10-16 17-23 24-30 31-6 7-13 14-20 21-27 28-6
A I GENERAL REQUIREMENTS (2 UNIT)
1 Mobilization and demobilization of equipment and plant to site 2.78 0.13 0.13 0.13 0.13 0.13

2 Safety health and welfare 0.54 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

3 Temporary working, strorage and workshop, contractor office facilities 0.45 0.15 0.15 0.15

4 Design analysis, drawing, administration cost adn other cost 1.21 0.20 0.20 0.20 0.20 0.20 0.20

5 All testing requires cost and tools 0.58 0.10 0.10 0.10 0.10 0.10 0.10

II Equipment rent
1 Crawler rent 90 ton (crane support) 5.41 0.28 0.28

2 Crawler rent 40 ton (crane support) 3.87 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18

B BRIDGE CONSTRUCTION WORK EARTH WORK 0.00


1 Soil exccavation 0.06
2 Supply and instlation geoteknik 0.02
C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 7.50
2 Pier (form work, concrete and reinforcemenet) K-3000 2.77
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 0.36
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 3.56
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 1.08
D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm 16.28 3.26 3.26 3.26 3.26 3.26

2 Driving and jointing steel pile 5.31 1.06 1.06 1.06

3 Cutting of surplus lenghts OD 609 mm dia steel pile piles 0.06 0.02

4 Pile head treatment (K-300) 1.35 0.45

5 Reinforced lining protection/soil embakment protection 0.26


6 PDA Test for Bridge 0.23
7 Gabion 1.09
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w 1.09
2 InstalI erection steel structure I girder 1800x350x26x28 c/w 0.87
3 Expansion joint = seal rubber (include erection method) for span 24m' 0.13
4 Instal pedestrian metal railing 0.11
5 Supply and install drainage spots 0.08
F BRIDGE CONSTRUCTION WORK EARTH WORK
41.29
1 Soil exccavation 0.06 41.29
2 Supply and instlation geoteknik 0.02
39.14
G CONCRETE WORK 37.47
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 7.50 35.79
2 Pier (form work, concrete and reinforcemenet) K-3000 2.77
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 0.36
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 3.56
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 1.08 28.65
H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm 16.28 3.26 3.26 3.26 3.26 3.26

2 Driving and jointing steel pile 5.31


3 Cutting of surplus lenghts OD 609 mm dia steel pile piles 0.06 21.37
4 Pile head treatment (K-300) 1.35
5 (K 300, form work + support 0.26
6 PDA Test for Bridge 0.23
7 Gabion 1.09 14.21
I STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w 1.09
2 InstalI erection steel structure I girder 1800x350x26x28 c/w 0.87
3 Expansion joint = seal rubber (include erection method) for span 24m' 0.13 7.05
4 Instal pedestrian metal railing 0.11
5 Supply and install drainage spots 0.08
J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker 0.78 0.02 0.04
100.00
TOTAL
BOBOT RENCANA PER MINGGU 0.02 0.02 7.01 7.16 7.16 7.28 7.13 1.69 1.67 2.14
KUMULATIF BOBOT RENCANA PER MINGGU 0.02 0.04 7.05 14.21 21.37 28.65 35.79 37.47 39.14 41.29
BOBOT AKTUAL 0.02
KUMULATIF BOBOT AKTUAL 0.02
DEVIASI -
DULE CONSTRUCTION
HD785 BMO
MARET APRIL MEI JUNI Juli
KETERANGAN
7-13 14-20 21-27 28-3 4-10 11-17 18-24 25-1 2-8 9-15 16-22 23-29 30-5 6-12 13-19 20-26 27-3 4
190 hari kalender
99.98100
100.00
0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.02

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
97.91
0.02

94.50
91.69
89.28
0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28

0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
85.850.08
0.18

0.02 0.02 0.02

0.01 0.01 0.01 80.84 80


1.25 1.25 1.25 1.25 1.25 1.25 77.68
0.92 0.92 0.92
75.03
0.09 0.09 0.09 0.09
72.59 1.19 1.19 1.19

70.28 0.54 0.54

65.96
1.06 1.06

0.02 0.02

0.45 0.45 61.32


0.13 0.13
60
0.23

0.54 0.54 56.25

52.65 0.36 0.36 0.36

0.29 0.29 0.29


49.61
0.06 0.06

0.05521 0.055207
45.52 0.08

41.29
49.61

45.52

41.290.03 0.03

40
39.14 0.01 0.01

37.47
1.25 1.25 1.25 1.25 1.25 1.25

0.92 0.92 0.92

0.09 0.09 0.09 0.09

1.7779394086 1.777939409

0.5396 0.5396

1.06 1.06 1.06 1.06 1.06

0.02 0.02 0.02

0.45 0.45 0.45 20


0.13 0.13

0.23

0.54 0.54

0.36 0.36 0.36

0.29 0.29 0.29

0.0626300862 0.062630086

0.11
0.08

0.78 0

4.23 4.09 3.04 3.60 5.08 4.64 4.31 2.31 2.45 2.65 3.16 5.00 3.43 2.41 2.81 3.41 2.08 0.02
45.52 49.61 52.65 56.25 61.32 65.96 70.28 72.59 75.03 77.68 80.84 85.85 89.28 91.69 94.50 97.91 99.98 100
UNIT PRICE AMOUNT
NO DESCRIPTION UNIT QUANTITY BOBOT
IDR IDR
A I GENERAL REQUIREMENTS (2 UNIT)
1 Mobilization and demobilization of equipment and plant to site LS 1 900,000,000 900,000,000 2.78
2 Safety health and welfare LS 1 175,000,000 175,000,000 0.54
3 Temporary working, strorage and workshop, contractor office facilities LS 1 145,000,000 145,000,000 0.45
4 Desighn analysis, drawing, administration cost adn other cost LS 1 390,000,000 390,000,000 1.21
5 All testing requires cost and tools LS 1 187,500,000 187,500,000 0.58

II Equipment rent
1 Crawler rent 90 ton (crane support) month 5 350,000,000 1,750,000,000 5.41
2 Crawler rent 40 ton (crane support) month 5 250,000,000 1,250,000,000 3.87

B BRIDGE CONSTRUCTION WORK EARTH WORK 0.00


1 Soil exccavation m3 300.00 60,000 18,000,000.00 0.06
2 Supply and instlation geoteknik m2 1,900.00 4,150 7,885,000.00 0.02

C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000 2,425,231,900.00 7.50
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000 895,086,010.00 2.77
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000 116,160,000.00 0.36
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000 1,149,711,750.00 3.56
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000 348,964,000.00 1.08

D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667 5,262,920,520.00 16.28
2 Driving and jointing steel pile m3 1,560.00 1,100,000 1,716,000,000.00 5.31
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000 18,200,000.00 0.06
4 Pile head treatment (K-300) m3 73.48 5,950,000 437,182,200.00 1.35
5 Reinforced lining protection/soil embakment protection m3 13.98 6,050,000 84,579,000.00 0.26
6 PDA Test for Bridge ea 3.00 25,000,000 75,000,000.00 0.23
7 Gabion m3 180.00 1,950,000 351,000,000.00 1.09

E STEEL STRUCTURE WORK


1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625 352,312,750.13 1.09
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625 281,168,552.70 0.87
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000 40,500,000.00 0.13
4 Instal pedestrian metal railing m' 102.00 350,000 35,700,000.00 0.11
5 Supply and install drainage spots ls 34.00 750,000 25,500,000.00 0.08

F BRIDGE CONSTRUCTION WORK EARTH WORK


1 Soil exccavation m3 300.00 60,000 18,000,000.00 0.06
2 Supply and instlation geoteknik m2 1,900.00 4,150 7,885,000.00 0.02

G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300 m3 407.60 5,950,000 2,425,231,900.00 7.50
2 Pier (form work, concrete and reinforcemenet) K-3000 m3 144.95 6,175,000 895,086,010.00 2.77
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300 m3 19.20 6,050,000 116,160,000.00 0.36
4 Slab (form work, concrete and reinforcemenet t = 400) K-350 m3 190.04 6,050,000 1,149,711,750.00 3.56
5 Safety beam of parapet (form work, concrete and reinforcement) K-350 m3 57.68 6,050,000 348,964,000.00 1.08

H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm m' 1,560.00 3,373,667 5,262,920,520.00 16.28
2 Driving and jointing steel pile m3 1,560.00 1,100,000 1,716,000,000.00 5.31
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles Ea 52.00 350,000 18,200,000.00 0.06
4 Pile head treatment (K-300) m3 73.48 5,950,000 437,182,200.00 1.35
5 Reinforced lining protection/soil embakment protection (K 300, form work + support m3 13.98 6,050,000 84,579,000.00 0.26
6 PDA Test for Bridge ea 3.00 25,000,000 75,000,000.00 0.23
7 Gabion m3 180.00 1,950,000 351,000,000.00 1.09

I STEEL STRUCTURE WORK


1 Instal erection steel structure I Girder 2100x350x28x30 c/w kg 134,214.38 2,625 352,312,750.13 1.09
2 InstalI erection steel structure I girder 1800x350x26x28 c/w kg 107,111.83 2,625 281,168,552.70 0.87
3 Expansion joint = seal rubber (include erection method) for span 24m' m' 54.00 750,000 40,500,000.00 0.13
4 Instal pedestrian metal railing m' 102.00 350,000 35,700,000.00 0.11
5 Supply and install drainage spots ls 34.00 750,000 25,500,000.00 0.08

J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker Ea 44.00 5,750,000 253,000,000.00 0.78
TOTAL 32,332,703,365.66 (100)
BOBOT RENCANA PER MINGGU
KUMULATIF BOBOT RENCANA PER MINGGU
DESEMEBER
1 2 3
27 28 29 30 31 1 2 TOTAL 3 4 5 6 7 8 9 10 11 12 13 14 15
- 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01 0.01 0.01
0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.037 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.037 0.01 0.01 0.01 0.01 0.01 0.01
- -
- - - 0.02 0.02 0.02 0.02 0.02 0.02
- - 0.02 0.02 0.02 0.02 0.02 0.02

- -
- -
0.18 - -

- - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 11.14 11.14 11.14 11.14 11.14 11.14
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -

- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 11.14 11.14 11.14 11.14 11.14 11.14
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
JANUARI
4 5
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
0.01 0.04 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04
0.01 0.037 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04
0.05 0.02 0.02 0.02 0.02 0.02 0.02 0.18 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.15
0.02 0.17 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.17 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.17
0.02 0.17 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.17 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.17

- -
- -
- - -

- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
0.81 78.00

- - - - - - - - - - - - - - - - - -
11.14 78.00 11.14 11.14 11.14 11.14 11.14 11.14 11.14 78.00 11.14 11.14 11.14 11.14 11.14 11.14 11.14 78.00
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - -
11.14 78.00 11.14 11.14 11.14 11.14 11.14 11.14 11.14 78.00 11.14 11.14 11.14 11.14 11.14 11.14 11.14 78.00
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
FEBRUARI
6 7 8
31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01
0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01
0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.15 - - - - - - - - - - - -
0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.17 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.17 0.02 0.02 0.02 0.02
0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.17 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.17 0.02 0.02 0.02 0.02

- -
- -
- 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.18

- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - -
11.14 11.14 11.14 11.14 11.14 11.14 11.14 78.00 178.29 178.29 178.29 178.29 178.29 178.29 178.29 1,248.00 - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - -
11.14 11.14 11.14 11.14 11.14 11.14 11.14 78.00 178.29 178.29 178.29 178.29 178.29 178.29 178.29 1,248.00 - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
M
9 10
18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12
0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04
0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.04 0.01 0.01 0.01 0.01 0.01 0.01
- - - - - - - - - - - - - - - - - - - -
0.02 0.02 0.02 0.17 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.10 - - - - - - - -
0.02 0.02 0.02 0.17 - - - - - - - - - - - - - - - -

- - -
- -

- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - ` - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - -

- - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - -
MARET

13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3
- - - -
0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - -
- - - -
- - - -
- - - -

- - - -
- - -
- - -

- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
Minggu Ke - 1: 7 Februari s/d 13 Februari 2018
Proyek : Pembangunan Jembatan HD 785
Owner : Berau Coal

NO DESCRIPTION

A I GENERAL REQUIREMENTS (2 UNIT)


1 Mobilization and demobilization of equipment and plant to site
2 Safety health and welfare
3 Temporary working, strorage and workshop, contractor office facilities
4 Design analysis, drawing, administration cost adn other cost
5 All testing requires cost and tools
SUB TOTAL I (GENERAL REQUIREMENTS)

II EQUIPMENT RENT
1 crawler rent 90 ton (crane support)
2 crawler rent 40 ton (crane support)
SUB TOTAL II (EQUIPMENT RENT)

B BRIDGE CONSTRUCTION WORK EARTH WORK


1 Soil exccavation
2 Supply and installation geotextile
SUB TOTAL B (BRIDGE CONSTRUCTION WORK EARTH WORK)

C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL C ( CONCRETE WORK)

D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB TOTAL D (FOUNDATION WORK)
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Instal pedestrian metal railing
5 Supply and install drainage spots
SUB TOTAL E (STRUCTURE WORK)

F BRIDBRIDGE CONSTRUCTION WORK EARTH WORK


1 Soil excavation
2 Supply and instlation geoteknik
SUB TOTAL F (BRIDGE CONSTRUCTION WORK EARTH WORK)

G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL G (CONCRETE WORK)

H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB SUB TOTAL H (FOUNDATION WORK)

I STEEL STRUCTURE WORK


1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Expansion joint = seal rubber (include erection method) for span 24m'
5 Supply and install drainage spots
SUB TOTAL I (STRUCTURE WORK)

J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker
SUB TOTAL J (MISC WORK)

TOTAL
Diperiksa & disetujui oleh:

PT. Berau Coal


CHID Cost Control CHID Section Head CHID Departement Head
CHID Cost Control CHID Section Head CHID Departement Head

Lukas Patandung Devit Friga Reo Andreas


Lokasi : Blok 5&6 Binungan Mine Operation (BMO)
No Kontrak : 046/BC-BCN/DIR/AGR-CHID/XI/2017
Kontraktor : PT. Bornes Citranusa

KEMAJUAN FISIK PEKERJAAN


UNIT BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI
Volume Bobot (%) Volume Bobot (%) Volume

LS 2.78 0.184 0.513 0.037 0.103 0.221


LS 0.54 0.222 0.120 0.037 0.020 0.259
LS 0.45 0.476 0.214 - - 0.476
LS 1.21 0.667 0.804 0.167 0.201 0.833
LS 0.58 0.667 0.387 0.167 0.097 0.833
5.56

month 5.41
month 3.87 - - 0.183 0.141 0.183
9.28

m3 0.06
m2 0.02
0.08

m3 7.50
m3 2.77
m3 0.36
m3 3.56
m3 1.08
15.26

m' 16.28 312.000 3.255 1,248.000 13.022 1,560.000


m3 5.31
Ea 0.06
m3 1.35
m3 0.26
ea 0.23
m3 1.09
24.57
kg 1.09
kg 0.87
m' 0.13
m' 0.11
ls 0.08
2.27

m3 0.06
m2 0.02
0.08

m3 7.50
m3 2.77
m3 0.36
m3 3.56
m3 1.08
15.26

m' 16.28 312.000 3.255 1,248.000 13.022 1,560.000


m3 5.31
Ea 0.06
m3 1.35
m3 0.26
ea 0.23
m3 1.09
24.57

kg 1.09
kg 0.87
m' 0.13
m' 0.11
ls 0.08
2.27

Ea 0.78
0.78

100.00 8.55 26.61


Dibuat oleh:

PT. Bornes Citranusa


tement Head Site Manager Site Engineer PJO
tement Head

ndreas Bambang Tutuko Ronaldo Arnold


Report No.

peration (BMO)
M.7
ID/XI/2017

AAN BOBOT
S/D MINGGU INI PERSENTASE
Bobot (%) %

0.615 22.105
0.140 25.926
0.214 47.619
1.005 83.333
0.483 83.333

0.141 3.657

16.277 100.000
16.277 100.000

35.15

PJO
Arnold
Minggu Ke - 1: 31 Januari s/d 6 Februari 2018
Proyek : Pembangunan Jembatan HD 785
Owner : Berau Coal

NO DESCRIPTION

A I GENERAL REQUIREMENTS (2 UNIT)


1 Mobilization and demobilization of equipment and plant to site
2 Safety health and welfare
3 Temporary working, strorage and workshop, contractor office facilities
4 Design analysis, drawing, administration cost adn other cost
5 All testing requires cost and tools
SUB TOTAL I (GENERAL REQUIREMENTS)

II EQUIPMENT RENT
1 crawler rent 90 ton (crane support)
2 crawler rent 40 ton (crane support)
SUB TOTAL II (EQUIPMENT RENT)

B BRIDGE CONSTRUCTION WORK EARTH WORK


1 Soil exccavation
2 Supply and installation geotextile
SUB TOTAL B (BRIDGE CONSTRUCTION WORK EARTH WORK)

C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL C ( CONCRETE WORK)

D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB TOTAL D (FOUNDATION WORK)
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Instal pedestrian metal railing
5 Supply and install drainage spots
SUB TOTAL E (STRUCTURE WORK)

F BRIDBRIDGE CONSTRUCTION WORK EARTH WORK


1 Soil excavation
2 Supply and instlation geoteknik
SUB TOTAL F (BRIDGE CONSTRUCTION WORK EARTH WORK)

G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL G (CONCRETE WORK)

H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB SUB TOTAL H (FOUNDATION WORK)

I STEEL STRUCTURE WORK


1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Expansion joint = seal rubber (include erection method) for span 24m'
5 Supply and install drainage spots
SUB TOTAL I (STRUCTURE WORK)

J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker
SUB TOTAL J (MISC WORK)

TOTAL
Diperiksa & disetujui oleh:

PT. Berau Coal


CHID Cost Control CHID Section Head CHID Departement Head
CHID Cost Control CHID Section Head CHID Departement Head

Lukas Patandung Devit Friga Reo Andreas


Lokasi : Blok 5&6 Binungan Mine Operation (BMO)
No Kontrak : 046/BC-BCN/DIR/AGR-CHID/XI/2017
Kontraktor : PT. Bornes Citranusa

KEMAJUAN FISIK PEKERJAAN


UNIT BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI
Volume Bobot (%) Volume Bobot (%) Volume

LS 2.78 0.147 0.410 0.037 0.103 0.184


LS 0.54 0.185 0.100 0.037 0.020 0.222
LS 0.45 0.326 0.146 0.150 0.067 0.476
LS 1.21 0.500 0.603 0.167 0.201 0.667
LS 0.58 0.500 0.290 0.167 0.097 0.667
5.56

month 5.41
month 3.87
9.28

m3 0.06
m2 0.02
0.08

m3 7.50
m3 2.77
m3 0.36
m3 3.56
m3 1.08
15.26

m' 16.28 234.000 2.442 78.000 0.814 312.000


m3 5.31
Ea 0.06
m3 1.35
m3 0.26
ea 0.23
m3 1.09
24.57
kg 1.09
kg 0.87
m' 0.13
m' 0.11
ls 0.08
2.27

m3 0.06
m2 0.02
0.08

m3 7.50
m3 2.77
m3 0.36
m3 3.56
m3 1.08
15.26

m' 16.28 234.000 2.442 78.000 0.814 312.000


m3 5.31
Ea 0.06
m3 1.35
m3 0.26
ea 0.23
m3 1.09
24.57

kg 1.09
kg 0.87
m' 0.13
m' 0.11
ls 0.08
2.27

Ea 0.78
0.78

100.00 6.43 2.12


Dibuat oleh:

PT. Bornes Citranusa


tement Head Site Manager Site Engineer PJO
tement Head

ndreas Bambang Tutuko Ronaldo Arnold


Report No.

peration (BMO)
M.6
ID/XI/2017

AAN BOBOT
S/D MINGGU INI PERSENTASE
Bobot (%) %

0.513 18.421
0.120 22.222
0.214 47.619
0.804 66.667
0.387 66.667

3.255 20.000
3.255 20.000

8.55

PJO
Arnold
Minggu Ke - 1: 24 januari s/d 30 Januari 2018
Proyek : Pembangunan Jembatan HD 785
Owner : Berau Coal

NO DESCRIPTION

A I GENERAL REQUIREMENTS (2 UNIT)


1 Mobilization and demobilization of equipment and plant to site
2 Safety health and welfare
3 Temporary working, strorage and workshop, contractor office facilities
4 Design analysis, drawing, administration cost adn other cost
5 All testing requires cost and tools
SUB TOTAL I (GENERAL REQUIREMENTS)

II EQUIPMENT RENT
1 crawler rent 90 ton (crane support)
2 crawler rent 40 ton (crane support)
SUB TOTAL II (EQUIPMENT RENT)

B BRIDGE CONSTRUCTION WORK EARTH WORK


1 Soil exccavation
2 Supply and installation geotextile
SUB TOTAL B (BRIDGE CONSTRUCTION WORK EARTH WORK)

C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL C ( CONCRETE WORK)

D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB TOTAL D (FOUNDATION WORK)
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Instal pedestrian metal railing
5 Supply and install drainage spots
SUB TOTAL E (STRUCTURE WORK)

F BRIDBRIDGE CONSTRUCTION WORK EARTH WORK


1 Soil excavation
2 Supply and instlation geoteknik
SUB TOTAL F (BRIDGE CONSTRUCTION WORK EARTH WORK)

G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL G (CONCRETE WORK)

H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB SUB TOTAL H (FOUNDATION WORK)

I STEEL STRUCTURE WORK


1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Expansion joint = seal rubber (include erection method) for span 24m'
5 Supply and install drainage spots
SUB TOTAL I (STRUCTURE WORK)

J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker
SUB TOTAL J (MISC WORK)

TOTAL
Diperiksa & disetujui oleh:

PT. Berau Coal


CHID Cost Control CHID Section Head CHID Departement Head
CHID Cost Control CHID Section Head CHID Departement Head

Lukas Patandung Devit Friga Reo Andreas


Lokasi : Blok 5&6 Binungan Mine Operation (BMO)
No Kontrak : 046/BC-BCN/DIR/AGR-CHID/XI/2017
Kontraktor : PT. Bornes Citranusa

KEMAJUAN FISIK PEKERJAAN


UNIT BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI
Volume Bobot (%) Volume Bobot (%) Volume

LS 2.78 0.111 0.308 0.037 0.103 0.147


LS 0.54 0.148 0.080 0.037 0.020 0.185
LS 0.45 0.176 0.079 0.150 0.067 0.326
LS 1.21 0.333 0.402 0.167 0.201 0.500
LS 0.58 0.333 0.193 0.167 0.097 0.500
5.56

month 5.41
month 3.87
9.28 -

m3 0.06
m2 0.02
0.08 -

m3 7.50
m3 2.77
m3 0.36
m3 3.56
m3 1.08
15.26 -

m' 16.28 156.000 1.628 78.000 0.814 234.000


m3 5.31
Ea 0.06
m3 1.35
m3 0.26
ea 0.23
m3 1.09
24.57
kg 1.09
kg 0.87
m' 0.13
m' 0.11
ls 0.08
2.27

m3 0.06
m2 0.02
0.08

m3 7.50
m3 2.77
m3 0.36
m3 3.56
m3 1.08
15.26

m' 16.28 156.000 1.628 78.000 0.814 234


m3 5.31
Ea 0.06
m3 1.35
m3 0.26
ea 0.23
m3 1.09
24.57

kg 1.09
kg 0.87
m' 0.13
m' 0.11
ls 0.08
2.27

Ea 0.78
0.78

100.00 4.32 2.12


Dibuat oleh:

PT. Bornes Citranusa


tement Head Site Manager Site Engineer PJO
tement Head

ndreas Bambang Tutuko Ronaldo Arnold


Report No.

peration (BMO)
M.5
ID/XI/2017

AAN BOBOT
S/D MINGGU INI PERSENTASE
Bobot (%) %

0.410 14.737
0.100 18.519
0.146 32.619
0.603 50.000
0.290 50.000

2.442 15.000
2.442 15.000

6.43

PJO
Arnold
Minggu Ke - 1: 17 Januari s/d 23 Januari 2018
Proyek : Pembangunan Jembatan HD 785
Owner : Berau Coal

NO DESCRIPTION

A I GENERAL REQUIREMENTS (2 UNIT)


1 Mobilization and demobilization of equipment and plant to site
2 Safety health and welfare
3 Temporary working, strorage and workshop, contractor office facilities
4 Design analysis, drawing, administration cost adn other cost
5 All testing requires cost and tools
SUB TOTAL I (GENERAL REQUIREMENTS)

II EQUIPMENT RENT
1 crawler rent 90 ton (crane support)
2 crawler rent 40 ton (crane support)
SUB TOTAL II (EQUIPMENT RENT)

B BRIDGE CONSTRUCTION WORK EARTH WORK


1 Soil exccavation
2 Supply and installation geotextile
SUB TOTAL B (BRIDGE CONSTRUCTION WORK EARTH WORK)

C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL C ( CONCRETE WORK)

D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB TOTAL D (FOUNDATION WORK)
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Instal pedestrian metal railing
5 Supply and install drainage spots
SUB TOTAL E (STRUCTURE WORK)

F BRIDBRIDGE CONSTRUCTION WORK EARTH WORK


1 Soil excavation
2 Supply and instlation geoteknik
SUB TOTAL F (BRIDGE CONSTRUCTION WORK EARTH WORK)

G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL G (CONCRETE WORK)

H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB SUB TOTAL H (FOUNDATION WORK)

I STEEL STRUCTURE WORK


1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Expansion joint = seal rubber (include erection method) for span 24m'
5 Supply and install drainage spots
SUB TOTAL I (STRUCTURE WORK)

J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker
SUB TOTAL J (MISC WORK)

TOTAL
Diperiksa & disetujui oleh:

PT. Berau Coal


CHID Cost Control CHID Section Head CHID Departement Head
CHID Cost Control CHID Section Head CHID Departement Head

Lukas Patandung Devit Friga Reo Andreas


Lokasi : Blok 5&6 Binungan Mine Operation (BMO)
No Kontrak : 046/BC-BCN/DIR/AGR-CHID/XI/2017
Kontraktor : PT. Bornes Citranusa

KEMAJUAN FISIK PEKERJAAN


UNIT BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI
Volume Bobot (%) Volume Bobot (%) Volume

LS 2.78 0.074 0.205 0.037 0.103 0.111


LS 0.54 0.111 0.060 0.037 0.020 0.148
LS 0.45 - - 0.176 0.079 0.176
LS 1.21 0.167 0.201 0.167 0.201 0.333
LS 0.58 0.167 0.097 0.167 0.097 0.333
5.56 - 0.563 - 0.499 -

month 5.41 -
month 3.87 -
9.28 - - - - -

m3 0.06 -
m2 0.02 -
0.08 - - - - -

m3 7.50 -
m3 2.77 -
m3 0.36 -
m3 3.56 -
m3 1.08 -
15.26 - - -

m' 16.28 78.000 0.814 78.000 0.814 156.000


m3 5.31 -
Ea 0.06 -
m3 1.35 -
m3 0.26 -
ea 0.23 -
m3 1.09 -
24.57 - 0.814 - 0.814 -
kg 1.09 -
kg 0.87 -
m' 0.13 -
m' 0.11 -
ls 0.08 -
2.27 - - - -

m3 0.06 -
m2 0.02 -
0.08 - - - -

m3 7.50 -
m3 2.77 -
m3 0.36 -
m3 3.56 -
m3 1.08 -
15.26 - - - - -

m' 16.28 78.000 0.814 78.000 0.814 156


m3 5.31 -
Ea 0.06 -
m3 1.35 -
m3 0.26 -
ea 0.23 -
m3 1.09 -
24.57 - 0.814 - 0.814 -

kg 1.09 -
kg 0.87 -
m' 0.13 -
m' 0.11 -
ls 0.08 -
2.27 - - - -

Ea 0.78 -
0.78 - - - -

100.00 2.19 2.13


Dibuat oleh:

PT. Bornes Citranusa


tement Head Site Manager Site Engineer PJO
tement Head

ndreas Bambang Tutuko Ronaldo Arnold


Report No.

peration (BMO)
M.4
ID/XI/2017

AAN BOBOT
S/D MINGGU INI PERSENTASE
Bobot (%) %

0.308 11.053
0.080 14.815
0.079 17.619
0.402 33.333
0.193 33.333
1.062

1.628 10.000

1.628
-

1.628 10.000

1.628

4.32

PJO
Arnold
Minggu Ke - 1: 10 Januari s/d 16 Januari 2018
Proyek : Pembangunan Jembatan HD 785
Owner : Berau Coal

NO DESCRIPTION

A I GENERAL REQUIREMENTS (2 UNIT)


1 Mobilization and demobilization of equipment and plant to site
2 Safety health and welfare
3 Temporary working, strorage and workshop, contractor office facilities
4 Design analysis, drawing, administration cost adn other cost
5 All testing requires cost and tools
SUB TOTAL I (GENERAL REQUIREMENTS)

II EQUIPMENT RENT
1 crawler rent 90 ton (crane support)
2 crawler rent 40 ton (crane support)
SUB TOTAL II (EQUIPMENT RENT)

B BRIDGE CONSTRUCTION WORK EARTH WORK


1 Soil exccavation
2 Supply and installation geotextile
SUB TOTAL B (BRIDGE CONSTRUCTION WORK EARTH WORK)

C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL C ( CONCRETE WORK)

D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB TOTAL D (FOUNDATION WORK)
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Instal pedestrian metal railing
5 Supply and install drainage spots
SUB TOTAL E (STRUCTURE WORK)

F BRIDBRIDGE CONSTRUCTION WORK EARTH WORK


1 Soil excavation
2 Supply and instlation geoteknik
SUB TOTAL F (BRIDGE CONSTRUCTION WORK EARTH WORK)

G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL G (CONCRETE WORK)

H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB SUB TOTAL H (FOUNDATION WORK)

I STEEL STRUCTURE WORK


1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Expansion joint = seal rubber (include erection method) for span 24m'
5 Supply and install drainage spots
SUB TOTAL I (STRUCTURE WORK)

J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker
SUB TOTAL J (MISC WORK)

TOTAL
Diperiksa & disetujui oleh:

PT. Berau Coal


CHID Cost Control CHID Section Head CHID Departement Head
CHID Cost Control CHID Section Head CHID Departement Head

Lukas Patandung Devit Friga Reo Andreas


Lokasi : Blok 5&6 Binungan Mine Operation (BMO)
No Kontrak : 046/BC-BCN/DIR/AGR-CHID/XI/2017
Kontraktor : PT. Bornes Citranusa

KEMAJUAN FISIK PEKERJAAN


UNIT BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI
Volume Bobot (%) Volume Bobot (%) Volume

LS 2.78 0.037 0.103 0.037 0.103 0.074


LS 0.54 0.074 0.040 0.037 0.020 0.111
LS 0.45
LS 1.21 - 0.167 0.201 0.167
LS 0.58 - 0.167 0.097 0.167
5.56

month 5.41
month 3.87
9.28

m3 0.06
m2 0.02
0.08

m3 7.50
m3 2.77
m3 0.36
m3 3.56
m3 1.08
15.26

m' 16.28 78.000 0.814 78.000


m3 5.31
Ea 0.06
m3 1.35
m3 0.26
ea 0.23
m3 1.09
24.57
kg 1.09
kg 0.87
m' 0.13
m' 0.11
ls 0.08
2.27

m3 0.06
m2 0.02
0.08

m3 7.50
m3 2.77
m3 0.36
m3 3.56
m3 1.08
15.26

m' 16.28 78.000 0.814 78


m3 5.31
Ea 0.06
m3 1.35
m3 0.26
ea 0.23
m3 1.09
24.57

kg 1.09
kg 0.87
m' 0.13
m' 0.11
ls 0.08
2.27

Ea 0.78
0.78

100.00 0.14 2.05


Dibuat oleh:

PT. Bornes Citranusa


tement Head Site Manager Site Engineer PJO
tement Head

ndreas Bambang Tutuko Ronaldo Arnold


Report No.

peration (BMO)
M.3
ID/XI/2017

AAN BOBOT
S/D MINGGU INI PERSENTASE
Bobot (%) %

0.205 7.368
0.060 11.111
-
0.201 16.667
0.097 16.667

0.814 5.000
0.814 5.000

2.19

PJO
Arnold
Minggu Ke - 1: 27 Des s/d 2 Januari 2017
Proyek : Pembangunan Jembatan HD 785
Owner : Berau Coal

NO DESCRIPTION

A I GENERAL REQUIREMENTS (2 UNIT)


1 Mobilization and demobilization of equipment and plant to site
2 Safety health and welfare
3 Temporary working, strorage and workshop, contractor office facilities
4 Design analysis, drawing, administration cost adn other cost
5 All testing requires cost and tools
SUB TOTAL I (GENERAL REQUIREMENTS)

II EQUIPMENT RENT
1 crawler rent 90 ton (crane support)
2 crawler rent 40 ton (crane support)
SUB TOTAL II (EQUIPMENT RENT)

B BRIDGE CONSTRUCTION WORK EARTH WORK


1 Soil exccavation
2 Supply and installation geotextile
SUB TOTAL B (BRIDGE CONSTRUCTION WORK EARTH WORK)

C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL C ( CONCRETE WORK)

D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB TOTAL D (FOUNDATION WORK)
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Instal pedestrian metal railing
5 Supply and install drainage spots
SUB TOTAL E (STRUCTURE WORK)

F BRIDBRIDGE CONSTRUCTION WORK EARTH WORK


1 Soil excavation
2 Supply and instlation geoteknik
SUB TOTAL F (BRIDGE CONSTRUCTION WORK EARTH WORK)

G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL G (CONCRETE WORK)

H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB SUB TOTAL H (FOUNDATION WORK)

I STEEL STRUCTURE WORK


1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Expansion joint = seal rubber (include erection method) for span 24m'
5 Supply and install drainage spots
SUB TOTAL I (STRUCTURE WORK)

J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker
SUB TOTAL J (MISC WORK)

TOTAL
Diperiksa & disetujui oleh:

PT. Berau Coal


CHID Cost Control CHID Section Head CHID Departeme
Lukas Patandung Devit Friga Reo Andrea
Lokasi
No Kontrak
Kontraktor

KEMAJUA
UNIT UNIT PRICE AMOUNT BOBOT MINGGU LALU
QUANTITY
IDR IDR Volume

LS 1 900,000,000 900,000,000 2.78


LS 1 175,000,000 175,000,000 0.54 0.037
LS 1 145,000,000 145,000,000 0.45
LS 1 390,000,000 390,000,000 1.21
LS 1 187,500,000 187,500,000 0.58
5.56

month 5 350,000,000 1,750,000,000 5.41


month 5 250,000,000 1,250,000,000 3.87
9.28

m3 300.00 60,000 18,000,000.00 0.06


m2 1,900.00 4,150 7,885,000.00 0.02
0.08

m3 407.60 5,950,000 2,425,231,900.00 7.50


m3 144.95 6,175,000 895,086,010.00 2.77
m3 19.20 6,050,000 116,160,000.00 0.36
m3 190.04 6,050,000 1,149,711,750.00 3.56
m3 57.68 6,050,000 348,964,000.00 1.08
15.26

m' 1,560.00 3,373,667 5,262,920,520.00 16.28


m3 1,560.00 1,100,000 1,716,000,000.00 5.31
Ea 52.00 350,000 18,200,000.00 0.06
m3 73.48 5,950,000 437,182,200.00 1.35
m3 13.98 6,050,000 84,579,000.00 0.26
ea 3.00 25,000,000 75,000,000.00 0.23
m3 180.00 1,950,000 351,000,000.00 1.09
24.57
kg 134,214.38 2,625 352,312,750.13 1.09
kg 107,111.83 2,625 281,168,552.70 0.87
m' 54.00 750,000 40,500,000.00 0.13
m' 102.00 350,000 35,700,000.00 0.11
ls 34.00 750,000 25,500,000.00 0.08
2.27

m3 300.00 60,000 18,000,000.00 0.06


m2 1,900.00 4,150 7,885,000.00 0.02
0.08

m3 407.60 5,950,000 2,425,231,900.00 7.50


m3 144.95 6,175,000 895,086,010.00 2.77
m3 19.20 6,050,000 116,160,000.00 0.36
m3 190.04 6,050,000 1,149,711,750.00 3.56
m3 57.68 6,050,000 348,964,000.00 1.08
15.26

m' 1,560.00 3,373,667 5,262,920,520.00 16.28


m3 1,560.00 1,100,000 1,716,000,000.00 5.31
Ea 52.00 350,000 18,200,000.00 0.06
m3 73.48 5,950,000 437,182,200.00 1.35
m3 13.98 6,050,000 84,579,000.00 0.26
ea 3.00 25,000,000 75,000,000.00 0.23
m3 180.00 1,950,000 351,000,000.00 1.09
24.57

kg 134,214.38 2,625 352,312,750.13 1.09


kg 107,111.83 2,625 281,168,552.70 0.87
m' 54.00 750,000 40,500,000.00 0.13
m' 102.00 350,000 35,700,000.00 0.11
ls 34.00 750,000 25,500,000.00 0.08
2.27

Ea 44.00 5,750,000 253,000,000.00 0.78


0.78

32,332,703,365.66 100.00
Dibuat oleh:

PT. Bornes Ci
CHID Departement Head Site Manager Site Engin
Reo Andreas Bambang Tutuko Ronald
Report No.

: Blok 5&6 Binungan Mine Operation (BMO)


M.2
: 046/BC-BCN/DIR/AGR-CHID/XI/2017
: PT. Bornes Citranusa

KEMAJUAN FISIK PEKERJAAN BOBOT


MINGGU LALU MINGGU INI S/D MINGGU INI PERSENTASE
Bobot (%) Volume Bobot (%) Volume Bobot (%) %

0.037 0.103 0.037 0.103 3.684


0.020 0.037 0.020 0.074 0.040 7.407
0.02 0.12 0.14

PT. Bornes Citranusa


Site Engineer PJO
Ronaldo Arnold
Minggu Ke - 1: 27 Des s/d 2 Januari 2017
Proyek : Pembangunan Jembatan HD 785
Owner : Berau Coal

NO DESCRIPTION

A I GENERAL REQUIREMENTS (2 UNIT)


1 Mobilization and demobilization of equipment and plant to site
2 Safety health and welfare
3 Temporary working, strorage and workshop, contractor office facilities
4 Design analysis, drawing, administration cost adn other cost
5 All testing requires cost and tools
SUB TOTAL I (GENERAL REQUIREMENTS)

II EQUIPMENT RENT
1 crawler rent 90 ton (crane support)
2 crawler rent 40 ton (crane support)
SUB TOTAL II (EQUIPMENT RENT)

B BRIDGE CONSTRUCTION WORK EARTH WORK


1 Soil exccavation
2 Supply and installation geotextile
SUB TOTAL B (BRIDGE CONSTRUCTION WORK EARTH WORK)

C CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL C ( CONCRETE WORK)

D FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB TOTAL D (FOUNDATION WORK)
E STEEL STRUCTURE WORK
1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Instal pedestrian metal railing
5 Supply and install drainage spots
SUB TOTAL E (STRUCTURE WORK)

F BRIDBRIDGE CONSTRUCTION WORK EARTH WORK


1 Soil excavation
2 Supply and instlation geoteknik
SUB TOTAL F (BRIDGE CONSTRUCTION WORK EARTH WORK)

G CONCRETE WORK
1 Abutmen included wing wall (form work, concrete and reinforcemenet) K-300
2 Pier (form work, concrete and reinforcemenet) K-3000
3 Settlement (approach) slab from work, concrete and reinforcemenet) K-300
4 Slab (form work, concrete and reinforcemenet t = 400) K-350
5 Safety beam of parapet (form work, concrete and reinforcement) K-350
SUB TOTAL G (CONCRETE WORK)

H FOUNDATION WORK
1 Supply steel pile fy 400 Mpa for OD 609 mm
2 Driving and jointing steel pile
3 Cutting of surplus lenghts OD 609 mm dia steel pile piles
4 Pile head treatment (K-300)
5 Reinforced lining protection/soil embakment protection
6 PDA Test for Bridge
7 Gabion
SUB SUB TOTAL H (FOUNDATION WORK)

I STEEL STRUCTURE WORK


1 Instal erection steel structure I Girder 2100x350x28x30 c/w
2 InstalI erection steel structure I girder 1800x350x26x28 c/w
3 Expansion joint = seal rubber (include erection method) for span 24m'
4 Expansion joint = seal rubber (include erection method) for span 24m'
5 Supply and install drainage spots
SUB TOTAL I (STRUCTURE WORK)

J MISC, WORKS
1 Flexible post guard rail height included spotlight sticker
SUB TOTAL J (MISC WORK)

TOTAL
Diperiksa & disetujui oleh:

PT. Berau Coal


CHID Cost Control CHID Section Head CHID Departement Head
CHID Cost Control CHID Section Head CHID Departement Head

Lukas Patandung Devit Friga Reo Andreas


Lokasi : Blok 5&6 Binungan Mine Operation (BMO)
No Kontrak : 046/BC-BCN/DIR/AGR-CHID/XI/2017
Kontraktor : PT. Bornes Citranusa

KEMAJUAN FISIK PEKERJAAN


UNIT BOBOT MINGGU LALU MINGGU INI S/D MINGGU INI
Volume Bobot (%) Volume Bobot (%) Volume

LS 2.78
LS 0.54 0.037 0.020 0.037
LS 0.45
LS 1.21
LS 0.58
5.56

month 5.41
month 3.87
9.28

m3 0.06
m2 0.02
0.08

m3 7.50
m3 2.77
m3 0.36
m3 3.56
m3 1.08
15.26

m' 16.28
m3 5.31
Ea 0.06
m3 1.35
m3 0.26
ea 0.23
m3 1.09
24.57
kg 1.09
kg 0.87
m' 0.13
m' 0.11
ls 0.08
2.27

m3 0.06
m2 0.02
0.08

m3 7.50
m3 2.77
m3 0.36
m3 3.56
m3 1.08
15.26

m' 16.28
m3 5.31
Ea 0.06
m3 1.35
m3 0.26
ea 0.23
m3 1.09
24.57

kg 1.09
kg 0.87
m' 0.13
m' 0.11
ls 0.08
2.27

Ea 0.78
0.78

100.00 - 0.020
Dibuat oleh:

PT. Bornes Citranusa


ement Head Site Manager Site Engineer PJO
ement Head

ndreas Bambang Tutuko Ronaldo Arnold


Report No.

Operation (BMO)
M.1
HID/XI/2017

JAAN BOBOT
S/D MINGGU INI PERSENTASE
Bobot (%) %

0.020 3.704
0.020

PJO
Arnold