Professional Documents
Culture Documents
Head of SSA
DGM (CFA)
AGM(Sales) CFA
AGM(Sales) CM
AGM(Nw plg) CM
AGM(Nw Opns) CM
AGM EB SDE EB
JTO MM
JTO SWI
JTO BB
JTO Groups
JTO INTL
JTO Extl
JTO CSC
JTO GENL
JTO LEGAL
MID-
DIMENSIO WEIGHT PL_GOO VERY_G
GroupName KPI DESCRIPTION TERM PL_EXCEL
N AGE D OOD
TARGET
Group Name: Consumer Fixed Access Group Weightage : 25
Consumer Fixed Access Financial CFA Revenue - Basic (LL, PCO, VAS, etc.) (Rs. Cr.) 20 17.83 10.7 14.265 17.83
Consumer Fixed Access Financial CFA Revenue - Broadband (including VAS, IPTV) (Rs. Cr.) 20 10.005 6.005 8.005 10.005
Consumer Fixed Access Customer Net adds (by number of subscribers) - Basic (in 000's) 5 -3 -4.2 -3.6 -3
Productivity of sales Associates of SSA in number
Consumer Fixed Access Customer connections/active SA per month 5 0 0 0 0
Consumer Fixed Access Customer Net adds - (by number of subscribers) Broadband (in 000's) 10 6700 4020 5360 6700
Consumer Fixed Access Operational CCR rate for Landline local 2.5 76 65 72 76
Consumer Fixed Access Operational % of faults cleared by next working day LL 5 95 86 91 95
Overall performance (on scale of 1 to 5 - to be assessed by
Consumer Fixed Access Operational Circle Head) 5 5 3 4 5
% of new services (LL, BB) provisioned within the norm (7
Consumer Fixed Access Operational days for LL, 15 days for BB) 10 100 90 96 100
Consumer Fixed Access Operational CCR rate for Landline STD 2.5 63 55 60 63
Consumer Fixed Access Operational Fault rate BB 2.5 5 6 5.4 5
Consumer Fixed Access Operational Timely implementation of CDR project (%actual vs. planned) 5 1 0 0 1
Consumer Fixed Access Operational Fault rate LL 2.5 3 7 5.5 3
Consumer Fixed Access Operational % of faults cleared by next working day BB 5 95.7 85 91 95.7
Total Weightage: 100
Total Weighted Score Norma
Group Name: Consumer Mobility Group Weightage : 30
Consumer Mobility Financial CM revenue (Rs. Cr.) 40 39.61 23.765 31.69 39.61
% of non BSNL retailers converted into BSNL Retailers vis-a-
Consumer Mobility Customer vis number of retailers surveyed in SSA 5 47 28 38 47
Consumer Mobility Customer CM Net adds - GSM (by number of subscribers) (in 000's) 15 74.75 44.85 59.8 74.75
Consumer Mobility Customer CM Net adds - Wi-Max (by number of subscribers) (in 000's) 5 0.5 0.3 0.4 0.5
True reflection of secondary sale of Sims in Sanchar soft, for
Consumer Mobility Customer sim selling and recharge selling retailers. 5 409.5 245.5 327.5 409.5
Consumer Mobility Customer CM Net adds - CDMA (by number of subscribers) (in 000's) 5 2.5 1.5 2 2.5
Overall performance (on scale of 1 to 5 - to be assessed by
Consumer Mobility Operational Circle Head) 5 5 3 4 5
Consumer Mobility Operational BTS availability (%) 20 98 96 97 98
Total Weightage: 100
Total Weighted Score Norm
Group Name: Enterprise Group Weightage : 15
Enterprise Financial Enterprise BU revenue (Rs. Cr.) 40 1.875 1.125 1.5 1.875
Enterprise Customer Number of new Enterprise Gold accounts penetrated 20 0 0 0 0
Overall performance (on scale of 1 to 5 - to be assessed by
Enterprise Operational Circle Head) 10 5 3 4 5
Enterprise Operational MLLN/MPLS network Uptime(%) 15 98 96 97 98
Enterprise Operational Average Provisioning Time (No. Of Days) 15 30 90 60 30
Total Weightage: 100
Total Weighted Score Norm
Group Name: New businesses Group Weightage (Including New Bu
New businesses Financial New Businesses revenue (Rs. Cr.) 20 0.565 0.34 0.45 0.565
Group Name: HR (Incl. Legal and Vigilance)
28.94 100 5
2055 0 0
78.06 100 2.5
100 100 5
100 100 10
71.19 100 2.5
3.13 100 2.5
1 100 5
2.46 100 2.5
93 88.51 4.43
Total Weighted Score: 77.38
Normalized to Group Weigtage: 19.34
17.26 0 0
13.51 0 0
30.15 0 0
0 0 0
325 79.39 3.97
-0.722 0 0
1.26 0 0
99.78 100 20
Total Weighted Score: 23.97
e Normalized to Group Weigtage: 7.19
0.55 0 0
12 100 20
2.58 0 0
97.7 94 14.1
3 100 15
Total Weighted Score: 49.1
e Normalized to Group Weigtage: 7.36
New Business, HR and Finance) : 20
0 0
5 100 10
4 80 16
Total Weighted Score: 64.76
Normalized to Group Weigtage: 12.95
2.47 0 0
Total Weighted Score: 0
ore Normalized to Group Weigtage: 0
46.85
Performance Management System
DGM (CFA) at SSA -
Scorecard
Sr. No. Dimension KPI Weightage Target Target Marks Weighted Score
Performance Levels1 Achieved Achieved
Fair Good Excellent
50% of fault to be
% of faults or failures in access media rectified within
7 Operations 2 hrs 5% cleared in 2 hrs &
remaining within 8 hours
8 Operations % of cases in which fault in media was rectified within remaining 50% of faults
8 hours to be cleared in 8 hrs
10 Customer / Market Net adds (by number of subscribers) - Basic (in 000's) 10%
& Broadband
Prepared by Approved by
DGM CFA GM
_____________SSA ______________ SSA
Individual Performance Management System
AGM Sales CFA -______________SSA
Scorecard
Sr. Performance Levels1 Target
Dimension KPI Weightage Target
No. Fair Good Excellent Achieved
CFA Revenue -Basic(LL,PCO,VAS), Broadband (including VAS,
9 Financial 10%
IPTV) (Rs. Cr.)
Customer / Net adds (by number of subscribers) - Basic (in 000's) &
10 10%
Market Broadband
Sales (leads generated) through SA/DSA/Franchisee / CSCs
against target set for the SSA for the sales of LL,BB,IPTV(if As fixed by GM(S&M) CFA based
1 already launched in the SSA),PCO & related Fixed IN VAS 10% on the Circle target fixed by BSNL
HQ
(prepaid/postpaid) in CFA Business
Collection and remission of cash in time as fixed by GM (TR) As per the target date fixed by
4 5%
Circle Office GM(TR)/GM (Finance), Circle Office
Carrying out activities like reach/increase of visibility of As per the target decided by
Advertisements,Hoardings & promotional literatures such as
5 brochures, pamphlets, magazines and press release etc of CFA 10% GM(S&M) CFA or the Head of SSA
as the case may be
business
Customer
i) Conduct of survey to monitor the performance of various
business plan at SDCAs/SSA level (by area) for taking corrective
6 action. ii) Feed back 5%
recd from customers through DSA,Franchisees,CSC, etc. with
recommendation to Circle Office on sales and Marketing
matters based on local environment
iii) Feedback received from
the retailers regarding total fault resolution turn around time
and sorting out the same to increase the sales
GPMS, FPMS, Preparation/Submission/Review of GPMS, FPMS, IPMS in As per the target set by BSNL
9 IPMS STT time 5% HQ/Circle/Head of SSA concerned
______________ SSA
Performance Management System
Network Planning (CFA) at SSA -
Scorecard
Sr. No. Dimension KPI Weightage Target Performance Levels1
Total 105%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair and Good and between Good and Excellent would b
3. Head N/W Planning (CFA) is responsible for procurement for all Business units in the SSA
Weighted average (by planned budgeted value) across projects of actual expenditure as a % of
1 planned budget (%)
Marks will be given based on delay from target month or date of completion. Eg. If completed
2 on time, maximum marks will be given. Delay by one month will lead to reduction of marks by
20.
Number of cases where procured equipment and material was delivered to other business
3
units in time / Total number of cases where equipment was supposed to be delivered
Marks will be given based on month of completion. If completed on time, maximum marks will
4 be given. Delay by one month will lead to reduction of marks by 20.
Appropriate weightage to be given to major roll-out and upgradation projects. Marks will be
5 given based on month of completion. If completed on time, maximum marks will be given.
Delay by one month will lead to reduction of marks by 20.
Subjective assessment given by Head - CFA at SSA based on (but not limited to): (1) Adherence
9 to budget (2) Execution of Planning eforts
Approved by
_____________ SSA
Performance Management System
work Planning (CFA) at SSA - DGM or below
Scorecard - backup
Source of data / information Target to be set by To be reviewed by
Internal reports
Internal reports
Internal reports
Internal reports
Internal reports
Internal reports
Internal reports
SSA CFA head in consultation with SSA CFA head in consultation with
respective DGM or below at SSA. respective DGM or below at SSA.
SSA CFA head in consultation with SSA CFA head in consultation with
respective DGM or below at SSA. respective DGM or below at SSA.
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair
between Good and Excellent would be linearly scaled
2. To be decided
.
ystem
Submission
of Periodical
1 5%
Requiremen
t
Development Processing
2 of of 15%
Estimates
3 Managemen 10%
t of stores
4 Tender Proces 10%
5 Processing of 15%
Conducting
Contractor's
6 Mtce 15%
meetings
periodically
operational
7 5%
Expenditure
Finance
Disposal of
8 5%
U/S items
Submission
GPMS, FPMS, of GPMS,
9 5%
IPMS STT FPMS, IPMS
in time
Overall
performanc
Overall e (on scale
11 of 1 to 5 - to 10%
performance be assessed
by Head
SSA)
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair
and between Good and Excellent would be linearly scaled
m
Marks Weighted
Achieved Score
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair
between Good and Excellent would be linearly scaled
2. To be decided
stem
Preparation
of Periodical
1 10%
VPT
statement
2 Releasing of 15%
CRs
Updation of
Development VPT
connections
3 15%
for USO
claim/Restor
ation of
DSLAM
Networks
Processing
4 FRAC /HPC 15%
report
5 Processing of 10%
Conducting
6 Mtce 10%
FRAC
Verification
VPT Zero
7 Finance 5%
Meter
Reading
Submission
GPMS, FPMS, IPMS of GPMS,
8 5%
STT FPMS, IPMS
in time
Overall
performanc
Overall e (on scale
9 of 1 to 5 - to 10%
performance be assessed
by Head
SSA)
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair
and between Good and Excellent would be linearly scaled
2. To be decided
ent System
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair
between Good and Excellent would be linearly scaled
2. To be decided
stem
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair
Good and Excellent would be linearly scaled
2. To be decided
stem
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair
between Good and Excellent would be linearly scaled
2. To be decided
ystem
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair
between Good and Excellent would be linearly scaled
2. To be decided
ystem
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair
between Good and Excellent would be linearly scaled
2. To be decided
stem
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair
between Good and Excellent would be linearly scaled
2. To be decided
stem
% of Number of Installations
9 Operations inspected (as a % of Total number of 5%
installations Assigned)
remaining 50% of
% of cases in which fault in media was rectified within
5 Operations 10% faults to be
8 hours
cleared in 8 hrs
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair and Good and between Good and Excellent would be linear
1 Total opex spend / Opex allocated in budget (on items excluding those in schedule P) From BU annual financial reports
Marks will be given based on delay from target month or date of completion. Eg. If completed
2 on time, maximum marks will be given. Delay by one month will lead to reduction of marks by Internal reports
20.
Number of cases in which media fault was resolved within 8 hrs / Total number of media faults Internal reports
4 (to be taken on a monthly basis and average over year to be taken)
Appropriate weightage to be given to major roll-out and upgradation projects. Marks will be
5 given based on month of completion. If completed on time, maximum marks will be given. Internal reports
Delay by one month will lead to reduction of marks by 20.
7 Switching capacity for which AT was conducted/Switching capacity ofered for AT Internal reports
Subjective assessment given by Head - CFA at Circle based on (but not limited to): (1) Rating on a scale of 1 to 5 by Head - CFA
6 Adherence to budget (2) Performance on implementation of strategic projects (2) Employee at Circle
growth and development initiatives
ld be linearly scaled
m
or below
Circle CFA head in consultation with Circle CFA head in consultation with
respective Transmission Head at Circle respective Transmission Head at Circle
Individual Performance Management System
SDE TX INSTLN,ERODE
Scorecard
Weightag Performance Levels1
Sr. No. Dimension KPI Target
e Fair Good
OFC Cable
1 15%
splicing,testing&ofering for A/T
Installation
2 of OFC 15%
Equipments
&ofering
for A/T
Attending
OFC Cable 10%
3
Developme break fault
nt during
emergency
Installation
of CPE
4 &Optical 10%
modem to
BTS&oferin
g for A/T
Extending E1 5%
Processing of 5%
Arranging
5 stores for 5%
installation
Conducting
6 Mtce Staf mtgs 5%
periodically
Curtailing
7 operational 5%
Finance Expenditure
Disposal of
8 5%
U/S items
Submission
GPMS, of GPMS,
9 FPMS, IPMS 5%
FPMS, IPMS
STT in time
Overall
performanc
Overall e (on scale
10 performanc of 1 to 5 - to 10%
e be assessed
by Head
SSA)
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair
Good and between Good and Excellent would be linearly scaled
2. To be decided
tem
Marks Weighted
Achieved Score
. Achievement between Fair and
Performance Management System
AGM Transmission Planning_________________________SSA
Scorecard
Sr. No. Dimension KPI Weightage Target Performance Levels1 Target Achieved
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair and Good and between Good and Excellent would be linear
1 Total opex spend / Opex allocated in budget (on items excluding those in schedule P) From BU annual financial reports
Marks will be given based on delay from target month or date of completion. Eg. If completed
2 on time, maximum marks will be given. Delay by one month will lead to reduction of marks by Internal reports
20.
Appropriate weightage to be given to major roll-out and upgradation projects. Marks will be
5 given based on month of completion. If completed on time, maximum marks will be given. Internal reports
Delay by one month will lead to reduction of marks by 20.
7 Switching capacity for which AT was conducted/Switching capacity ofered for AT Internal reports
Subjective assessment given by Head - CFA at Circle based on (but not limited to): (1) Rating on a scale of 1 to 5 by Head - CFA
6 Adherence to budget (2) Performance on implementation of strategic projects (2) Employee at Circle
growth and development initiatives
Circle CFA head in consultation with Circle CFA head in consultation with
respective Transmission Head at Circle respective Transmission Head at Circle
Performance Management System
AGM Transmission Mtce _________________________SSA
Scorecard
Sr. No. Dimension KPI Weightage Target Performance Levels1 Target Achieved
remaining 50% of
% of cases in which fault in media was rectified within
7 Operations 10% faults to be
8 hours
cleared in 8 hrs
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair and Good and between Good and Excellent would be linear
1 Total opex spend / Opex allocated in budget (on items excluding those in schedule P) From BU annual financial reports
Number of cases in which media fault was resolved within 8 hrs / Total number of media faults Internal reports
4 (to be taken on a monthly basis and average over year to be taken)
Circle CFA head in consultation with Circle CFA head in consultation with
respective Transmission Head at Circle respective Transmission Head at Circle
Individual Performance Management System
SDE TXN mtce Erode
Scorecard
Weightag Performance Levels1
Sr. No. Dimension KPI Target
e Fair Good
1 Provision of New Circuits 15%
2 Development Equipment outage afecting the service 15%
3 Reconnection CCTs 5%
4 Keeping fault rate within limits 10%
5 Mtce No of Inspections made in the Division 5%
6 Rearranging of E1s for OFC Ring 10%
7 Curtailing operational Expenditure 5%
Finance
8 Disposal of U/S items 5%
9 Customer Customer meet on MPLSVPN/MLLN CCT 10%
GPMS, FPMS, Submission of GPMS, FPMS, IPMS in time
10 5%
IPMS STT
Overall Overall performance (on scale of 1 to 5 - to
11 10%
performance be assessed by Head SSA)
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair
Excellent would be linearly scaled
2. To be decided
ent System
Prepared by Approved by
DGM (CM) GM
__________________SSA ______________ SSA
Individual Performance Management System
AGM Sales CM -______________SSA
Scorecard
Sr. Performance Levels1 Target Marks Weighted
Dimension KPI Weightage Target
No. Fair Good Excellent Achieved Achieved Score
Sales through DSA / Franchisee / CSCsagainst As fixed by GM(S&M)
target set for the SSA for the sales of CM based on the Circle
1 25%
GSM(2G,3G),CDMA,EVDO & related VAS in CM target fixed by BSNL
Business HQ
% of Number of CM Installations
8 Operations inspected (as a % of Total number 5%
of installations Assigned)
Overall
10 performanc Overall performance (on scale of 1 to 5 - to be 5%
assessed by Head - CM at SSA)
e
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair and Good and between Good and
Excellent would be linearly scaled
Prepared by Checked by Approved by
Prepared by Approved by
AGM(MIS/BP/IT) ____________________ GM
_____________SSA ______________ SSA
Weighte
d Score
een Good and
Individual Performance Management System
SDE (MIS) ,ERODE
Scorecard
Performance Levels1
Sr. No. Dimension KPI Weightage Target
Fair Good
MOC /MIS Forwarding of MIS and MOC statements
1 20% 100%
STATEMENTS to Circle Office
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair
and Excellent would be linearly scaled
2. To be decided
ent System
Completion
of various
Projects
assigned by
1 Circle office 10% 100%
in time in
respect of
Computer
systems.
Tender
process and
finalisation
2 10% 100%
for Purchase
of Computer
Developme systems.
nt
Preparation
of Estimates
and
3 10% 100%
Releasing of
Completion
Reports
Diversion/R
earrangeme
nt of
4 Computer 15% 100%
systems for
better
utilisation
Computer
WAN
5 Outage 10% 100%
afecting
service.
Operation
and
Maintenanc
e
Operation Extending
and Technical
Maintenanc support to
e field units in
Erode SSA in
6 respect of 15% 100%
Computer
H/w and
S/w for day-
to-day
activities.
Scrapping of
obsolete
7 10% 100%
and U/s
Financial items
Processing
8 10% 100%
of Bills
Overall
performanc
e (on scale
Performanc of 1 to 5 - to
10 10% 100%
e be assessed
by
controlling
officer.
Total 100%
tem
Marks Weighted
Achieved Score
Individual Performance Management System
AGM (A & HR) ____________________________ SSA
Scorecard
Weightag Performance Levels1 Target Marks Weighted
Sr. No. Dimension KPI Target
e Fair Good Excellent Achieved Achieved Score
Timely
5 completion of % of APARs completed by the required date 5%
ACRs
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair and Good and between Good and
Excellent would be linearly scaled
Prepared by Approved by
AGM(HR/Admin) ____________________ GM
_____________SSA ______________ SSA
Performance Management System
SDE (ADMN/HR)
Scorecard
Sl. No. Dimension KPI Weightage Target
Timely completion
3 % of ACRs completed by the required date 5%
of ACRs
Timely completion of achievement review for GPMS /
4 GPMS/FPMS FPMSand sending the same to the circle office by due 10%
dates
% of IPMS scorecards for which scorecard finalization
5 IPMS and target setting completed and sent to circle by due 5%
dates
0. Achievement between Fair and Good and between Good and Excellent would be li
Performance Management System
SDE (GENERAL) _________________________ SSA
Scorecard
Sl. No. Dimension KPI Weightage Target Performance Levels1
Fair
= 0. Achievement between Fair and Good and between Good and Excelle
Performance Management System
JTO (GENERAL) - _________________ SSA
Scorecard
Sl. No. Dimension KPI Weightage Target Performance Levels1
Fair Good
Mtce of GM(O) Building and electrical fittings
1 Building 20%
etc
ievement between Fair and Good and between Good and Exc
Performance Management System
JTO (LEGAL) - ____________________SSA
Scorecard
Sl. No. Dimension KPI Weightage Target Performance Levels1
Fair
COLLECTION
OF % of cases in which outstanding dues collected in
1 25%
OUTSTANDI full
NG DUES
% of RTI cases in which the required infromation
2 RTI supplied to the information seeker within due 30%
date.
% of IPMS scorecards for which scorecard
3 IPMS finalization and target setting & review completed 10%
and sent to HR section
4 HRMS Implementation of Leave Module 15%
Timely
5 completion % of ACRs completed by the required date 10%
of ACRs
Overall
6 performanc Overall performance (on scale of 1 to 5 - to be 10%
assessed by Controlling Officer
e
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair
t System
______SSA
0. Achievement between Fair and Good and between Good and Excellent
Individual Performance Management System
AGM CSC _________________________ SSA
Scorecard
Performance Levels1 Target Marks
Sr. No. Dimension KPI Weightage Target
Fair Good Excellent Achieved Achieved
9 5%
Collection and remission of cash in time
10 Disposal of sub complaints 5%
Customer / Market
Customer / Market
11 5%
Acceptance of CAF by term cell
No of Inspections made in CSC / MCCC /
12 5%
CTO
GPMS, FPMS, IPMS Submission of GPMS, FPMS, IPMS in
13 5%
STT time
Overall Overall performance (on scale of 1 to 5 -
14 5%
performance to be assessed by Head SSA)
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair and Good and between Good and Excellent
would be linearly scaled
Weighted
Score
en Good and Excellent
Individual Performance Management System
SDE,CSC, T BHAVAN,Erode
Scorecard
Dimensio Weightag Performance Levels1 Target
Sr. No. KPI Target
n e Fair Good Excellent Achieved
Implementa
tion:&
monitoring
the
1 QMS preventive 5% 100%
and
corrective
mtce.proces
s
Getting
feedback
from
Customer
2 customers 15% 100%
Feedback and
attending
the same
Counseling
of all
customers
3 Retaining of voluntary 15%
customer 100%
closure and
retaining in
BSNL.
Popularising
the new
New schemes /
4 schemes 15% 100%
plans
/Plans among the
customers
Keeping the
required
quantity of
Stock
position of all type of
5 10% 100%
cards to
cards fulfil the
customer
requests
Getting the
grievances
from the
Customer customer
6 8% 100%
grieavances and follow
up action to
settle the
same
Issuing work
order for all
7 Work order kinds of CFA 15% 100%
commercial
activities
Getting all
complaints
and
Complaint/S suggestions
8 uggestion and 10% 100%
Register attending
with the
help of field
staf
Handling
requests
from
9 Customer customers 7%
Satisfaction and 100%
ensuring
customer
satisfaction
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair
Good and between Good and Excellent would be linearly scaled
2. To be decided
tem
Marks Weighted
Achieved Score
. Achievement between Fair and
Individual Performance Management System
SDE,Commercial,Erode
Scorecard
Dimensio Weightag Performance Levels1 Target
Sr. No. KPI Target
n e Fair Good Excellent Achieved
Monitoring
all CSCs,
Revenue
1 Monitoring collection 10% 100%
and
statement
to Circle O.
Monitoring
and issuing
of work
2 Work Order orders for 15% 100%
NPC/Broad
band, shift
etc.
Maintaining
Commercial of all
3 15% 100%
files commercial
files
Collection of
all type of
applications
and
4 Stationery stationeries 10% 100%
from SDE
Genl,ED and
issuing to all
CSCs
Getting all
types of
banners and
Advertisem pamphlets
5 from 10% 100%
ents Marketing
Section and
distribution
to all CSCs
Releasing
work order
for ISDN and
6 ISDNs 10% 100%
following up
action for
completion
Getting
approval
and issuing
Service work orders
7 10% 100%
connections for
Service /SE
DOT/REDOT
connections
Provision of
Connections
to TAC
members
and MPs
8 MPs/TACs and 10% 100%
maintaining
corresponda
nces to
Liason
Officer.
Maintananc
e of all
corresponda
9 Staf 10% 100%
nces related
to staf
welfare.
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair
Good and between Good and Excellent would be linearly scaled
2. To be decided
tem
Marks Weighted
Achieved Score
. Achievement between Fair and
Individual Performance Management System
JTO,CSC, GPM,
Scorecard
Dimensio Weightag Performance Levels1 Target
Sr. No. KPI Target
n e Fair Good Excellent Achieved
Implementa
tion:&
monitoring
the
1 QMS preventive 10%
and
corrective
mtce.proces
s
Getting
feedback
from
Customer
2 customers 10%
Feedback and
attending
the same
Counseling
of all
customers
3 Retaining of voluntary 10%
customer closure and
retaining in
BSNL.
Popularising
the new
New schemes /
4 schemes 8%
plans
/Plans among the
customers
Accounting
Stock the cards
5 position of and keeping 8%
cards the stock
correctly
Getting the
grievances
from the
Customer customer
6 10%
grieavances and follow
up action to
settle the
same
Issuing work
Work order allocation to
7 15%
all stafs of
csc
Getting all
complaints
and
Complaint/S suggestions
8 uggestion and 10%
Register attending
with the
help of field
staf
Handling
requests
from
Customer customers
9 7%
Satisfaction and
ensuring
customer
satisfaction
checking the
TRC /IMPCS
COLLECTION
revenue AND
SENDING
10 monitorin STATEMENT 8%
g TO GM
OFFICE AO
CASH/AO
IMPCS
Marks Weighted
Achieved Score
. Achievement between Fair and
Individual Performance Management System
DE INDOOR _______________________ SSA
Scorecard
Weightag Performance Levels1 Target Marks
Sr. No. Dimension KPI Target
e Fair Good Excellent Achieved Achieved
Provision of New Circuits for provision of
1 15%
various services in CFA, CM & EB Business
2 Equipment outage afecting the service 15%
Development Reconnection of BB/LL & other services in CFA
3 5%
network
4 Improvement of CCR STD 5%
5 Improvement of CCR Local 5%
6 Mtce Keeping fault rate within limits 10%
Curtailing operational Expenditures of the
7 10%
Finance Telephone Exchange
8 Disposal of U/S items in the division 5%
Extending all activities to the DE (External) in
9 10%
provision of LL,BB & Fixed IN services etc
Customer
Extending all coordination to EB team for
10 provision of services to EB customers 10%
Overall performance
Overall
12 performanc (on scale of 1 to 5 - to 10%
e be assessed by Head
SSA)
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievemen
and Good and between Good and Excellent would be linearly scaled
2. To be decided
em
Mtce of
10 Customer Amenities in TB 10%
& Quatrers
Submission of
11 FPMS, IPMS STT FPMS, IPMS in 5%
time
Overall
performance
Overall performance (on scale of 1 to
12 10%
5 - to be
assessed by
Head SSA)
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievemen
Good and Excellent would be linearly scaled
2. To be decided
nagement System
CER,INTERNAL
air = 0. Achievement between Fair and Good and between Good and
Individual Performance Management System
SDE GROUPS
Scorecard
Dimensio Weightag Performance Levels1
Sr. No. KPI Target
n e Fair Good
Provision of NPC 15% 100%
Customer
Provision of BB 15% 100%
1 Rendering all coordination with S&M
team for conduct of Mela, exhibition 5%
etc for capturing new customers
98%
100%
100%
100%
100%
100%
100%
100%
Keeping
5 fault rate 10% 3% 98%
within limits
Mean Time
(RM) in Hrs
6 taken for 5% within 24
99%
clearance of Hrs
faults
% AN/OB
(for NPC,
Internal 100%with
7 Shift etc) 5% 100%
Process in 5 days
cleared with
in norms
Keeping
A&P items,
AC Units etc
8 5% 100% 100%
in fault free
working
condition
Operational
10 Expenditure 10% 100% 100%
per Line
Disposal of
11 Finance 5% 100% 100%
U/S items
Liquidation
of
12 5% 100% 98%
outstanding
dues
Submission
of GPMS,
13 Admn 5% 100% 100%
FPMS, IPMS
in time
Overall
14 Performanc 5% 100% 100%
e
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair
Good and between Good and Excellent would be linearly scaled
tem
Marks Weighted
Achieved Score
. Achievement between Fair and
Performance Management System
AGM (EB)
Scorecard
Sl. No. Dimension KPI Weightage Target
0. Achievement between Fair and Good and between Good and Excellent
Individual Performance Management System
SDE EB III
Scorecard
Performance
Sr. No. Dimension KPI Weightage Target Levels
Fair Good
10 Training 3G data card sale promotion and attending faults 10% 100%
Total 100%
1. Marks for Fair rating = 60, Good = 80, Excellent = 100. Marks achieved for rating below Fair = 0. Achievement between Fair
Good and Excellent would be linearly scaled
2. To be decided
ment System
Performance
Levels1 Target Marks Weighted
Excellent Achieved Achieved Score
100%
100%
100%
100%
95%
95%
90%
90%
100%
70%
0. Achievement between Fair and Good and between