You are on page 1of 5

SMART CITY MISSION

BELAGAVI SMART CITY LIMITED, BELAGAVI

Name of Work: Construction of Smart Roads at Dharmanath


junction, Dharam marg and Dharamnath Bhavan in Belagavi
City
SCRUTINY CERTIFICATE

Certified that,

1. The estimate for the proposed work is duly scrutinized with reference to
current Schedule of Rate of Karnataka PWD (2016-17)/ Electrical Karnataka
PWD (2014-15) / KUWS&DB (2015-16)/ / CPWD (2016-17).
2. Item not in any SRs are only considered as Non SR items and their rates are
derived from reputed dealers / manufactures. These rates are compared with
rates of similar ongoing contracts of Karnataka to the extent possible.
3. Verified BoQ quantities of all items considered in the DPR. The BoQ quantities
are based on drawings which are based on design.

Team Leader Executive Engineer


Belagavi Smart City Project Belagavi Smart City Limited.,
Belagavi590006 Belagavi 590006
Date: Date:
SMART CITY MISSION

BELAGAVI SMART CITY LIMITED, BELAGAVI


CERTIFICATE BY CONSULTANT

Name of Work: Construction of Smart Roads at Dharmanath


junction, Dharam marg and Dharamnath Bhavan in Belagavi
City.
Certified that,

1. Stakeholder consultations and citizen engagements are conducted while


preparing the DPR and valid suggestions are incorporated in the DPR.
Secondary data is collected from the respective stakeholders.
2. Detailed Traffic survey is carried out for 3 days and compared with National
Highway Traffic survey details and service level of the road is analysed.
3. Conducted Pedestrian survey to define pedestrian characteristics.
4. Reconnaissance survey is carried out for the Road network
5. Detailed topographical survey of the Road and Junctions is carried out along
with the related surveys
6. Condition assessment of existing roads and other utilities infrastructure are
carried out and it is verified through the concerned stake holders department.
The details are mapped in the survey drawings.
7. The proposed design and drawings are finalised after due consultation and
concurrence with respective stakeholders and they are site specific.
8. Rate analysis is prepared as per the Current SRs of Karnataka.
9. BOQ is prepared based on design and drawings. The quantities arrived at are
adequate and necessary for the successful completion of the project.
10. Implementation plan is based on standard procedures and stakeholder
consultations.
11. Lengths of drains, areas of paver blocks, lengths of ducts for utilities and
street lights are calculated as per site requirement. (Errors up to ± 3% are
acceptable)

Team Leader
Belagavi Smart City Project
Belagavi 590006
Date:
SMART CITY MISSION

BELAGAVI SMART CITY LIMITED, BELAGAVI


CERTIFICATE BY BSCL

Name of Work:Construction of Smart Roads at Dharmanath


junction, Dharam marg and Dharamnath Bhavan in Belagavi
City
Certified that,

1. Stakeholder consultations and citizen engagements are conducted while


preparing the DPR and valid suggestions are incorporated in the DPR.
Secondary data is collected from the respective stakeholders.
2. The site is visited along with the consultants and verified the details.
3. The proposed design and drawings are verified with due consultation and
concurrence of all stakeholders.
4. Lengths of drains, areas of paver blocks, lengths of ducts for utilities and
street lights are verified and are as per site requirement.
5. The Drawings, detailed BOQ, Rate analysis prepared by the consultants are
verified and found acceptable.

Executive Engineer
Belagavi Smart City Limited.,
Belagavi 590006
Date:

CERTIFICATE BY KMRP – KUIDFC

1. Rate Analysis of BoQ items are checked and found acceptable.


2. Units of BoQ items are checked and found correct.

Assistant Executive Engineer


KMRP - KUIDFC
Bengaluru
Date:
SMART CITY MISSION

BELAGAVI SMART CITY LIMITED, BELAGAVI


I) Consultants Certificate
The above detailed project report has been prepared in accordance with
investigation/design norms/TOR/IRC/MoRTH/CPHEEO Manual/IS Codes/NBC
and any of the relevant standards. It is certified that the detail project report
has been prepared and reviewed technically & financially and the estimated
cost is INR.43.25 Cr. (Rupees Forty three Crores Twenty lakhs Only)
based on the Schedule of Rate of Karnataka PWD (2016-17)/ Electrical
Karnataka PWD (2014-15) / KUWS&DB (2015-16) / CPWD (2016-17) and
competitive market rates for Non SR Items.

Signature:
Date:
Name:Mr. Manoj Jain
Title: Team Leader, Belagavi Smart City Project

II) Implementation Agency’s Acceptance


The above detailed project report has been examined with respect to
requirements of the Road and the DPR is accepted in total.

This is to certify that


1. The working areas for various components of DPR arefree from
encroachments.
2. There is no requirement of land acquisition from private owners for the
components of the DPR.

Signature: Signature:
Date: Date:
Name: R.S. Nayak Name: Shashidhar Kurer
Title: Executive Engineer Title: Managing Director
Belagavi Smart City Limited Belagavi Smart City limited
SMART CITY MISSION

BELAGAVI SMART CITY LIMITED, BELAGAVI

DETAILED PROJECT REPORT

Name of Work: Construction of Smart Roads at Dharmanath


junction, Dharam marg and Dharamnath Bhavan in Belagavi
City.
FACE SHEET

Name of Smart City: Belagavi Smart City

Head of Account: Smart City Fund (Projects)

Employer: Belagavi Smart City Limited by its MD

Detailed Project Report is prepared in the office of the Belagavi Smart city limited,
Belagavi for the estimated cost that will be incurred in carrying out the work of
“Construction
of Smart Roads at Dharmanath junction, Dharam
marg and DharamnathBhavan in Belagavi City.”
Estimated Cost: Rs. 43.25 Crores

DPR Prepared By: M/s Tractebel Engineering Pvt. Limited.

Team Leader Executive Engineer


Belagavi Smart City Project Belagavi Smart City Limited.,
Belagavi 590006 Belagavi 590006
Date: Date: