Method Statement
Shifting of Mechanical/Electrical Equipment Rev-00 09th Jan, 2018
2018
883-4-Z04-W04Z-C-CN12-AFET-RCC-MST-G0-0044
CONTENTS
1. Purpose
2. Objective
3. Definition
4. Responsibility
5. Work Methodology
6. Equipment to be shifted
Prepared By: Abdur Rahman Farooq-QA/QC Manager JODP Phase-IV Page 2/8
Method Statement
Shifting of Mechanical/Electrical Equipment Rev-00 09th Jan, 2018
2018
883-4-Z04-W04Z-C-CN12-AFET-RCC-MST-G0-0044
1.0 PURPOSE
The purpose of generating this method statement is to define the procedure step
by step to implement the correct practices for shifting of Mechanical & Electrical
Equipment through the guidelines contained herein so as to ensure that the job
execution complies with specification and serves the intended function to
satisfactory level where applicable in the building of JABAL OMAR DEVELOPMENT
PROJECT Phase-IV (Zone S10/S11) Makkah-KSA.
2.0 OBJECTIVE
To ensure that all related activities are executed safely in accordance with the
contract requirements and QHSE Regulations. Activity is conducted in a
systematic manner with full QHSE compliance and conformance is verified and
documented.
3.0 DEFINITIONS
e. Crane – Equipment that can hoist, lower, and horizontally move a suspended
load.
f. Forklift – a vehicle with a pronged device in front for lifting and carrying heavy
loads.
Prepared By: Abdur Rahman Farooq-QA/QC Manager JODP Phase-IV Page 3/8
Method Statement
Shifting of Mechanical/Electrical Equipment Rev-00 09th Jan, 2018
2018
883-4-Z04-W04Z-C-CN12-AFET-RCC-MST-G0-0044
h. Hoisting – The act of raising, lowering, or moving a load in the air with
equipment covered by this program.
i. Load – Object being hoisted plus rigging and other connecting devices.
Prepared By: Abdur Rahman Farooq-QA/QC Manager JODP Phase-IV Page 4/8
Method Statement
Shifting of Mechanical/Electrical Equipment Rev-00 09th Jan, 2018
2018
883-4-Z04-W04Z-C-CN12-AFET-RCC-MST-G0-0044
4.0 RESPONSIBILITIES
b. Ensure that approved risk assessment, lifting plan and other necessary
documents are available and comply.
HSE Dept. will assist the execution team for implementing lifting & shifting plan,
safety measures related to the nature of works being carried out in accordance
with Legal requirements, stakeholder requirements, etc.
a. Shall perform the quality check before and after the job finished.
c. Shall assist the execution team for safe lifting of load according to the
manufacturer recommendations.
Everyone involved in lifting & shifting operations has specific responsibilities. These
are defined in the following paragraphs:
The Responsible Person of this shifting activity is the Construction Manager /project
engineer of the concerned area who will have overall responsibility to execute the job
safely.
Prepared By: Abdur Rahman Farooq-QA/QC Manager JODP Phase-IV Page 5/8
Method Statement
Shifting of Mechanical/Electrical Equipment Rev-00 09th Jan, 2018
2018
883-4-Z04-W04Z-C-CN12-AFET-RCC-MST-G0-0044
a. The Competent Person /Lifting Supervisor is someone who has the required level of
competency to plan and supervise lifting & shifting operations. He must have the
practical skills, theoretical knowledge, experience and ability to carry out risk
assessments, lifting & shifting plan and its execution.
b. Ensure that adequate inspection / examination and maintenance of the equipment
have been carried out prior to its use.
d. The competent person has authority to stop the lifting operation if he considers it is
danger to proceed.
a) Ensure that load is free from loose materials before lifting & shifting.
b) Good housekeeping shall be ensured prior to start the job and maintained in
working zone i.e. S10-B01, B02 & B03
c) Areas shall be cordon off with adequate barrier and area watch personnel shall
be assigned to avoid unauthorized entry in exclusion /working zone.
a. Lift & shift the equipment by forklift from S10-B02 (current location) to the
platform location.
d. Offload the equipment by chain block from B02 to skidding platform at B03 level.
Prepared By: Abdur Rahman Farooq-QA/QC Manager JODP Phase-IV Page 6/8
Method Statement
Shifting of Mechanical/Electrical Equipment Rev-00 09th Jan, 2018
2018
883-4-Z04-W04Z-C-CN12-AFET-RCC-MST-G0-0044
a. Forklift.
b. Chain-block.
a. Circulation Pumps
b. Lifting Pumps
c. Booster Pumps
d. Sump Pumps
e. Water Softeners
f. Sand Filters
Tag number of each equipment & its load (in kilograms) is mentioned in the attached
schedule.
The current location for all equipment is in S10-B02 next to pump room as per attached
drawing and the final location is as per attached Equipment schedule.
-END-
Prepared By: Abdur Rahman Farooq-QA/QC Manager JODP Phase-IV Page 7/8
Method Statement
Shifting of Mechanical/Electrical Equipment Rev-00 09th Jan, 2018
2018
883-4-Z04-W04Z-C-CN12-AFET-RCC-MST-G0-0044
Prepared By: Abdur Rahman Farooq-QA/QC Manager JODP Phase-IV Page 8/8