Professional Documents
Culture Documents
ENRYB
•Welder Qualification Testing (WQT)
•Welding Procedure Qualification Records (WPQR) & Weld Procedure Specifications (WPS)
•Welding Inspection (CSWIP & AS1796) , Welding Supervision & Welder Training
•Weld Record Traceability (incl. PAMS, NDE & Mechanical)
•Weld Coupon and Consumable Handling & Storage
•Full Scale Bend Testing
PAMEmployment
Petroleum & Mining
Provision of hand-picked, highly trained pipeline personnel.
Employment
PAME Spoolbase Examples:
Pipe Stringing
Subsea 7 “Seven Navica” Load Out
PAME Spoolbase
Spoolbase Operations
PAME Spoolbase
Brown & Root Energy Services (BHPP) - Griffin Remedial Pipeline Fabrication (Bundle)
5km Bundled Beach Tow & Tow/Trail Heads (Launchers/Catchers).
6” 12Cr (3LPP) & 18” CS Carrier Pipe.
First 12% Cr bundle in the southern hemisphere (Mardie Station - Karratha)