You are on page 1of 4

Harish Raval

RAJKOT.
Mobile: 9099167602
9825565102

E­Mail: hcr6098@gmail.com

Seeking assignments in Civil Construction / Project Management with an organization of repute.

SYNOPSIS
­ Insightful experience of 2 decades of qualitative experience in Construction / Operations. / Execution /& (RMC)concrete management
services.
­
­ Nuclear Atomic Power Project (KAPS) phase­3­4 with BHEL­Bangalore through M/s.POET CONSULTANTS­Bangalore as Civil
Consultants (QA­QC) at Kakrapar­Gujarat Dist.TAPI.
­
­ Previously working with L & T Special Steel & Heavy forging Industrial Complex @Surat Hazira as Assistant Manager Civil ( Contract
Project Period )
­ Previously also worked with L & T Manufacturing complex at Surat hazira works as a consultant engineer
Quality/Execution (Civil).
­ Also worked with Reliance Refinery expansion project @ Jamnagar for Infrastructure Development.
­ Have been instrumental management service of operation & production of Ready Mixed Concrete (RMC) with Quality testing, &
supplying till up 3 years on above 35 LAC CUM. RMC on diff. Location of refinery by managing & operating of 15 RMC Batching
Plants and 15 Boom placers & other construction equipments in Reliance,
­
­ Hands on experience in the construction of electrical 66KVA & 220KVA Sub­Station of GUJARAT ELECTRICITY BOARD
­ Knowledge of Tendering, Rate Analysis of items/Billing­ Estimation & measurement books Records and execution of project, by
Govt. bodies PWD, GEB etc.
­
­ Handled key projects with –STP / WATER RETAINING STRUCTURES / WTP / SEWAGE & W/S NETWORK .
­ Raw Water Storage Reservoir / Pump Complex / Water Harvesting Reservoir Tank & Systems / Over head Water Tank /PEB Projects/
Solar Panel projects for L&T Steel plant Surat Hazira­ project­ & Water Collection Sump Storage etc with Safety norms
Guide lines.
­

PRESENT JOB RESPONSIBILITY

Resource management for overall operation for executing various projects under infrastructure /STP/Sub­station/Water supply &
Sewage /Storm water drain/Roads­Building etc.
­ Responsible for Co­ordination with Architects/Consultants/contractors/Clients­and other agencies involved in execution of projects.

1
­ Proper Guidance to planning member for preparation of monthly progress chart for top management.
­ Responsible for drawing received reading and allotment to contactors.
­ Coordination of execution and drawing with consultant and client.
­ Responsible for checking quality of work, test certificate pour card, testing report etc.
­ Maintaining daily chart of project progress.
Industrial work­piling work ,Pre­engineering build structures (PEB) for shop, Industrial Tremix flooring,
­ Infrastructure facilities­Sewage and water supply network , Rain Water drain network , Road &Culverts,
­ Sewage Treatment Plant with Waste water Management services,
­ Sub­station/Unitized substation and Four pole structure with D/G set foundation work,
­ ACP Cladding and structural Glazing work .
­
PREVIOUS JOB RESPONSIBILITY
­
­ Resource Management for the Concrete management service as per design mix, Field Test of Concrete, with 15 Batching Plant of
Reliance JERP & more than 180 nos. Transit Mixers /Boom placers/static pumps movement in JERP.
­ Knowledge of properties of fresh/ready mix concrete/ and hardened concrete & cube test etc.
­ Knowledge of Civil norms & standards I S codes & test result parameters of all construction materials.
­ Knowledge about properties of the ingredients of Concrete & Mix design as per IS codes….
­ Awareness & Necessary Action for Concrete Quality Control by Statistical Analysis while in execution.
­ Handling the Concrete Distribution Network According To Specific Job Requirement.
­ Responsible for Timely Production, Supplying, & Maintain Quality at Regular Interval for Fresh Concrete Test.
­ Monitoring Periodically Calibration of Batching Plants for quality concrete..
­ Co­ordination with Client/ Construction group/ Material Supplier group & other agencies involved in project execution for
Procurement for Smooth Functioning of project.
­ Monitoring for carrying out testing for concrete, and related other tests to find properties of materials,
­ Daily monitoring and checking of fresh concrete quality, temperature, as daily Batch weight.
­ Managing dispatch of BOOM PLACER and STATIC PUMPS as specific requirements from JERP sites.
­ Monitoring construction equipments/vehicles like Transit Mixers, Loader, and Poclain etc.
­ Responsible for the optimum use of machinery/equipments/manpower to reach target.
­ Should be able to study of the Civil Drawings.
­ Knowledge of different laboratory tests required to be carried out for civil material testing for the project.

EMPLOYMENT HIGHLIGHTS

January­16’­Working with ‘’S G S India Pvt Ltd for the Gujarat Housing Board­Chief Minister Affordable Housing Project @ Rajkot &
Junagadh (Rs 230.00 CRORES) as PMC Consultants. Projects “Rajkot ­Infrastructure Development work for the execution
/Quality/Billing/coordination etc.

January­15’ Working with CAIRN Energy Terminal Project@ BHOGAT­Gujarat Under Indian Oil Tanking (IOTL) Co. under Contract period
for BHOGAT­Oil/Gas Terminal Division in Jamnagar District.

Sept­13’ to Dec­13’ Nuclear Atomic Power project Phase­3­4 Kakrapar (Gujarat) under BHEL­Bangalore
Through M/s. POET CONSULTANTS –Bangalore as Consultants Civil for the QA­QC for the project site.

May­11’ –March’13­ working with L&T Special steel and heavy forging complex @ Surat Hazira as assistant
Manager Civil.(On Contract Project period)

­Resource management for over all activities for Project management Infrastructure Development activity
For Industrial Structures / RCC Drains­ Roads/ Asphalt roads / STP /Substation /Reservoir & Harvesting
Tank Reservoirs / SOLAR PANEL projects for the Grid System for Plant power production as client Engineer co­ordinates with reputed
PMC /Consultants­Contractors.

Oct’09­Jun’10­ worked with L & T Industrial manufacturing complex at Hazira, Surat as Consultant of M/s B.Mehtalia Consultants,
Mumbai.
2
Projects:

Working as civil Consultant for the manufacturing engineering industry facilities @ (L & T, Hazira, Surat) for Turbine and Training Center
Project.
Resource management for overall activity for project execution. Supervision, progress chart, Quality check etc.
Setting of plot layout. Estimation/BOQ for approvals of client. Planning, monitoring for the factory building.Billing, quality control and day
to day monitoring.Co­ordination with client and contractors.

Jul’06­April’09 with Reliance Engineering Associates Ltd.(Agency Staff), Jamnagar as Assistant Co Coordinator Civil
Projects:

­ working In the Reliance Petroleum Limited at Jamnagar Export Refinery SEZ Project with Central Civil Groups, to Monitoring Concrete
Management system by Ready mixed concrete through operation of Concrete Plants and other Modern concrete casting machinery with
Co ordination through Central Materials & Research Testing Laboratory Management etc.

Sep’04­May’06 with M/s B L Kapadia, as Senior Project in Charge


Projects:

­ Over head water tank 1 lacks liter capacity & 2 lacks liter capacity under ground water Sump of Gujarat water supply & Sewerage
Board in Jamnagar District.
­ Consumer Diesel Pump of Reliance ,
May’02­Jul’04 with M/s B L Kapadia, as Junior Site In charge
Projects:

­ Category A, B, C Staff quarter (Three Storied).


­ Info COM Station (Power Station) Building of Reliance Info Com.
­
Jan’99­Apr’02 with Harsh Construction, as Site In charge
Projects:
­ Residential Building & internal WBM & CC Road.
­ Construction of Govt.Staff Quarters and land developing project.
­
Jun’97­Nov’99 with Arjun Construction Co, as Senior Civil Engineer
Projects:
­ Water Treatment Filter Plant & Building.
­ CC Road & Pipe Culvert.
­
Aug’94­May’97 with M/s R M Modhavadia, as Senior Civil Engineer
Projects:
­ Construction of residential & non residential buildings.
­
May’91­Jun’94 with Gujarat Electricity Board as a Work Charge Engineer Junagadh (Gujarat)
Projects:

­ Electricity Board 66 KVA, 132 KVA & 220 KVA Substations.


­ Control Room Substation Building in 220KVA & 66KVA.
­ Foundations for Transformer & other.
­ 1 lack TTR OHT & Sump.
­ Internal & External Cable Trench in 220KVA & 66KVA sub station.
­
Jun’88­Apr’91 with M/s A T Odedra, as Civil Supervisor
Projects:

­ Category type 3 Quarter.


­ Internal Road & Pump House.
­ Compound Wall of Gujarat Electricity Board under Junagadh Division (Gujarat).
Education: Diploma in Civil Engineering from Govt. Polytechnic in the year 1988 with secured first
class distinction.(69%)
PERSONEL DETAILS

Date of Birth: 28th April 1966


Address:
Permanent Address: Chhaya Rail Crossing, Porbandar. (GUJARAT).

3
4

You might also like