Waste Management Flowchart

Sources of Garbage (households/ business establishments)

Waste are segregated at source into 2 Biodegradable waste in bulk and


major components with hard fibers shall be shredded
a. Biodegradable-those that can Mechanical at source to reduce volume of
be converted into compost Shredders waste being transported to the
fertilizers thru biodegradation landfill and to hasten
b. Non-Biodegradable-those that decomposition process.
cannot be decomposed

 Bins are demounted from the truck


chassis and put in ground level for
easy access and systematic collection.

 Bins at 5 to 12 cu.m. capacity are


distributed strategically to villages No need to schedule garbage disposal. Bins
and areas close to sources of waste. are schedule round the clock, so people
can dispose of their garbage anytime. Dual
 Bins will be structured into single and
Bins compartment bins will enable to sustain
double compartments with either
segregation of waste from source to final
open top or closed bin design
disposal. Initially, a crew will be assigned to
depending on the specific
strictly enforce segregation of wastes
requirement of the area.
thrown in bins.
Close bins are recommended to handle
market waste with foul odor

Small to medium sized hooklift trucks collect Hook lift trucks can operate as many cargo bins
loaded bins and replace them with empty bins. using only 1 truck and even without crew
Even if the trucks are in transit, bins will be Hook lift assistance in collecting garbage. It enables
stationed 24 hours a day/ 7 day a week to trucks systematic collection and facilitate easy waste
prevent spillage & stockpiling of garbage on segregation as bins are stationed at ground
streets and major thoroughfares. level for easy access.

PROJECT SITE
(MRF)
Loaded bins are delivered to the project Professional Consultant/
site. Management Oversight
The project site shall be divided into 3 To handle forward planning, parallel
PROJECT SITE
areas management and oversight functions
(MRF)
 Non-Biodegradable to assure the efficiency and
 Biodegradable effectiveness of the program
 Residual Waste

Biodegradable wastes are unloaded in


the LNC Large Scale Composting Center Aerobic At the initial stage of the
within the area designated by LNC. These windrow project, organic fertilizer
Large Scale
are subjected to large scale composting s will be produced in break
Composting
using bulk (unbagged and
Center
a) Aerobic windrows Anaerobic unscaled. Bagging, scaling
b) Anaerobic trench trench and packing of organic
c) Vermi process for organic fertilizers fertilizer will form an
and live worm meat as end product Vermi integral part of the
proces program.
s

bottles/
glass
Recyclable wastes are
unloaded in the non-
biodegradable area of MRF Non- plastics
that is instituted to recover biodegradable
bottles/ glass, plastics, scrap area
metal and paper/carton to paper/
generate more income out carton
residue /
of garbage. scrap
other waste
metal

Residue and other waste are then


forwarded to the landfill ponds layered Residual waste
with HDPE plastic liner or clay liners or area
to 3rd party residual hauler