Feul Consumstion
BSA/NPM, Site BKM
Alat
No
minggu senin
Plan Qty
Jam Kerja bbm/Jam Ttl BBM Jam Kerja bbm/Jam Ttl BBM
1 Excavator PC 300 3 7.50 30.00 675.00 15.00 30.00 1,350.00
2 Excavator PC 200 3 15.00 18.00 810.00 15.00 18.00 810.00
3 Bulldozoer D85E SS-2 2 15.00 30.00 900.00 15.00 30.00 900.00
4 Motor Grader 1 15.00 18.00 270.00 15.00 18.00 270.00
5 Vibro 1 15.00 15.00 225.00 15.00 15.00 225.00
6 ADT Terex 2 15.00 25.00 750.00 15.00 25.00 750.00
7 DT Ps 260 5 15.00 18.00 1,350.00 15.00 18.00 1,350.00
8 Water Truck PS 125 1 15.00 8.00 120.00 15.00 8.00 120.00
9 Fuel Truck PS 125 1 15.00 3.00 45.00 15.00 4.00 60.00
10 Manhoul PS 125 1 15.00 3.00 45.00 15.00 4.00 60.00
11 Lightin Plan 3 - 12.00 4.00 144.00
12 Light Vihicle 2 15.00 1.00 30.00 15.00 1.00 30.00
Total 5,220.00 6,069.00