PROYECTO:
ZAPATAS
Z-1 (1.80X1.80)
EJE A/1 1 1.30 1.30 m3 1.00
1 0.20 0.20 m3 0.20
2 0.20 1.30 m3 0.40
EJE A/3 2 0.65 1.30 m3 1.30
1 0.20 1.50 m3 0.20
2 0.20 0.65 m3 0.40
EJE B/1 2 0.65 1.30 m3 1.30
1 0.20 1.50 m3 0.20
2 0.20 0.65 m3 0.40
EJE B/3 1 1.30 1.30 m3 1.30
2 0.20 1.50 m3 0.40
2 0.20 1.30 m3 0.40
EJE C/1 2 0.65 1.30 m3 1.30
1 0.20 1.50 m3 0.20
2 0.20 0.65 m3 0.40
EJE C/3 1 1.30 1.30 m3 1.30
FRADO ACERO 0.25 ACERO 0.56 ACERO 0.99 ACERO 1.55 ACERO 2.24 ACERO 3.97 PESO
c m Kg m Kg m Kg m Kg m Kg m Kg TOTAL
Area 1/4 c 1/4 l 1/4 t 3/8 c 3/8 l 3/8 t 1/2 c 1/2 l 1/2 t 5/8 c 5/8 l 5/8 t 3/4 c 3/4 l 3/4 t 1c 1l 1t Kg