The document provides a template for evaluating bids on a technical level for an HVAC project. It outlines 14 evaluation parameters covering areas like design compliance, technical specifications, preliminary design, maintenance, project management, organization, engineering and construction plans, interface management, logistics, and quality control. Bidders are scored on a 100 point scale across each parameter based on how thoroughly and appropriately they address the criteria. The bidder with the highest overall technical score is recommended.
The document provides a template for evaluating bids on a technical level for an HVAC project. It outlines 14 evaluation parameters covering areas like design compliance, technical specifications, preliminary design, maintenance, project management, organization, engineering and construction plans, interface management, logistics, and quality control. Bidders are scored on a 100 point scale across each parameter based on how thoroughly and appropriately they address the criteria. The bidder with the highest overall technical score is recommended.
The document provides a template for evaluating bids on a technical level for an HVAC project. It outlines 14 evaluation parameters covering areas like design compliance, technical specifications, preliminary design, maintenance, project management, organization, engineering and construction plans, interface management, logistics, and quality control. Bidders are scored on a 100 point scale across each parameter based on how thoroughly and appropriately they address the criteria. The bidder with the highest overall technical score is recommended.
S.No. Parameter Maximum Score Weight Vendor A score
Confirmation of Scope, Overall Design basis A and code compliance 2 Understanding and confirmation of scope and 1 validation 1 Design basis report and design conditions and 2 Codes/ Standard Compliance 1 Adequacy and validation of Tender Plant B Schedules 2
Design heat load confirmations, plant and
1 equipment sizing and schedules confirmations 1 Agreed to work for final design irrespective of 2 data shown in tender 1 C Technical Specification Compliance on: 7 1 Chillers, Pumps, Cooling Towers 1
381517835.xls - Technical Page 3 of 18
2 AHUs, FCUs, PAHUs 1
3 Air Distribution, Ductwork/ Piping and Insulation 1
4 Electrical Work 1 5 CMS 1
6 Ventillation, smoke extract and pressurization 1
7 Other Items 1 D Confirmation of QA, FAT, Testing 1 Well documented testing plan - FAT, site tests, Pre commissioning checks, adjusting, balancing 1 and commissioning 1 E Tenderer's Preliminary Design 20 Analysis of Tender Design and Overall design 1 validation 2 Confirmation/ Analysis that the design enables 2 availability >98% for the plant 2 Technology is state of the art, low energy consumption, energy saving features, low 3 operational costs, environment friendly 2 Confirm adequacy of machine room sizes, 4 submit catalogues 1 Technical data schedule and approved makes 5 for all parts 2 Computerized selection of chillers certified by manufacturer, confirmation of effiiciencies 6 specified, annual power consumed 1 Softwares/ tools to be used for heat load 7 calculations, duct design / sizing, piping 2 Software, tools and design agency for CFD analysis for smoke extract system, noise 8 analysis, seismic design 1 Outside air management and control to achieve 9 energy conservation 1
381517835.xls - Technical Page 4 of 18
Design, civil construction agency, construction 10 methodology for civil work of tunnel, foundation 1 Interconnections/ circuit bypass valves/ alternative routing etc included to prevent 11 outage of plant 1 Tenderer's proposed design would meet the technical, space constraint, reliability and performance requirements described as per 12 specification 3 Details of the subcontractors (if any) with their CVs, presentations, experience, role 13 responsibilities and manpower schedules 1 F Maintenance 8 Confirmation on provision of Maintenance 1 features in plants for ease of O&M 2 Established local service support network in 2 India 2 Experience in handling term maintenance 3 contract for large projects 1
4 Adequacy of spare parts quoted for election E-5 1
Confirmation on warranty periods specified in 5 the contract 2 G Project Management 10 Works Program and Major and Individual Key 1 Dates compliance 10 H Organization and Resource Plan 12 Organization and Resource Plan - Design and 1 Procurement Phase 2 Organization and Resource Plan - Installation 2 and Manufacturing Phase 2 Organization and Resource Plan - Testing and 3 Commissioning Phase 2
381517835.xls - Technical Page 5 of 18
Compliance to specified key people and site based (full time) Project Manager, Design Manager, Construction Manager and Design/ 4 Construction/ T&C engineers 2 5 Providing 2 shift construction arrangement 1 PM/DM/ Engineers with good overseas and 6 airport experience 1 Committed to 25% trained workforce (min 3 yrs 7 exp) from overseas 2 Engineering, Procurement and Construction I Plan 10 1 Documented design management plan 3 2 Duct fabrication facility at site 2 3 Well analyzed manpower and installation plan 3 4 Construction methodology 1 5 Simulation methodology and tools 1
J Interface and site coordination management 5
Submission of qualified interface and 1 coordination plan 2 2 Design interface arrangement 1 3 Planned site coordination arrangement 1 4 Method statements 1 K Logistics Plan 10 1 Submission of qualified logistics plan 1 2 Adequate provision for P&M 3 3 Material transportation Arrangement 1 4 Material Storage Arrangement 2 5 Labor Arrangement - Labor Camp 1 6 Logistics Plan specified to this project 1 Confirmation that Construction power DG sets 7 are included 1 L Quality and Document Control Plan 5 1 Submission of qualified quality 2 2 Submission of document control plan 1
381517835.xls - Technical Page 6 of 18
Submission of change management, SQA and 3 audit plan 1 Quality and Document Control Plan specific to 4 this project 1 Project References of similar scale and M nature 3 Deep involvement on similar scale / nature 1 project 1 Bidder who acted as an EPC contractor for 2 similar scale/ nature project 2 N Health, Safety and Environment Plan 2
O T&C Plan, O&M Manual and Training Plan 3
Total 100 0 0
Summary Recommendation
381517835.xls - Technical Page 7 of 18
ation
Vendor B Score Vendor C Score Vendor D Score
381517835.xls - Technical Page 8 of 18
381517835.xls - Technical Page 9 of 18 381517835.xls - Technical Page 10 of 18 381517835.xls - Technical Page 11 of 18 0 0 0
381517835.xls - Technical Page 12 of 18
Commercial Bid Evaluation
Vendors considered Location Status
Vendor 1 Country Offered Evaluated Vendor 2 Country Offered Evlauated Vendor 3 Country Not offered Commercial Bid Evaluation Vendor 1 Vendor 2 add more columns as needed Item Description Vendor Name Offer No. Offer date Validity of Offer RFQ No. MR No. Address Contact details Tel Fax email Vendor 1 Unit No. Description Quantity Vendor 2 Unit rate Rate 1 Item 1 2 Item 2 Ex-Works Price Discount Net Price Packing & Forwarding Testing charges Documentation charges
381517835.xls - Commercial Page 13 of 18
Inspection charges Excise duty Sales Tax Inland freight (in country of dispatch) FOB Charges Ocean Freight Import Tax / Customs Duty Handling and Clearing charges (at destination port) Inland freight (in destination country) L/C Charges Any other charges Landed cost Supervision of Erection, installation and Commissioning (including boarding, lodging, travel, misc. expenses) Financing cost (worked out based on payment terms and applicable WACC) Variations admissible Total Cost Delivery (with basis) Guarantee / Defect liability Payment Terms Milestone 1 Milestone 2 Milestone . Milestone . Milestone n
Penalty on delays Penalty on performance shortfall Limitation of liability
381517835.xls - Commercial Page 14 of 18
Guarantee / Warranty Bank Guarantees Other criteria Optional quotes 2 year O&M spares Commerical Deviations Vendor position after TBE / CBE Order value Exchange rates considered for conversion to INR USD EUR JPY GBP CHF MYR
BUYER'S NAME & SIGNATURE
381517835.xls - Commercial Page 15 of 18
381517835.xls - Commercial Page 16 of 18 381517835.xls - Commercial Page 17 of 18 381517835.xls - Commercial Page 18 of 18