You are on page 1of 4

HAIL SURFACE FACILITIES EPS PROJECT

Project Number: 8598

RT REQUEST

Joint Type
Sch/ Thk (Butt/Branch
Sr. No. Dwg no./Rev Spool No. Welder ID Welder Name WELDING PROCESS POSITION WPS No Progression Dia(In) (mm) /Fillet/Socke
t)

1 WQT N.A TW-1410 Intizer Ahmed GTAW 6G TR 235 Uphill 3/4" 3.91 mm BUTT

2 WQT N.A TW-1644 Pradip Mistri Vilas Mistri GTAW 6G TR 235 Uphill 3/4" 3.91 mm BUTT

3 WQT N.A TW-1656 Avjith Das Arun Das GTAW 6G TR 235 Uphill 3/4" 3.91 mm BUTT

Page 1 of 4
Notes

IDENTIFICATION ON FILM AS FOLLOWS: ADOC/TR/TARGET/ PROJECT NO. 8598/ WQT/SMAW/5G/WPS NO / WELDER N

QA/QC Inspector/Enginee
(Contractor)

Name
Signature
Date

Page 2 of 4
CT

Location - Target Mussafa Workshop

Date:- 24-June- REQUEST NO : HSF-009

Joining
Electrode/Filler Wire Material Description
Elements
Fit-up Final Visual
(Acc) Remarks
(Viz,PipeFlg,Pi 1st Component 2nd Component (Acc-Rej)
Specification Date
pe-Elb,Etc) (upstream) (Down Stream)

PIPE to PIPE ER 70 S2 A 106 B A 106 B ACC ACC 3 Coupons

PIPE to PIPE ER 70 S2 A 106 B A 106 B ACC ACC 3 Coupons

PIPE to PIPE ER 70 S2 A 106 B A 106 B ACC ACC 3 Coupons

Page 3 of 4
NO / WELDER NAME/WELDER ID/DIA X THICKNESS/DATE

Inspector/Engineer QA/QC Inspector/Engineer


(Contractor) (Company)

Page 4 of 4