Professional Documents
Culture Documents
Cover of reinforcement bar (between concrete surface and center of reinforcement bar)
Side wall Outside cm 6.0
Inside cm 6.0
Top slab Upper cm 6.0
Lower cm 6.0
Bottom slab Lower cm 6.0
Upper cm 6.0
2 Design Parameters
1/1 SingleBoxCulvert/01Summary
STRUCTURAL CALCULATION OF BOX CULVERT Type: B1.00m x H1.50m Class III Road
Soil Cover Depth: 6.0 m
1 Dimensions and Parameters
Basic Parameters asumsi
Ka: Coefficient of static earth pressure 0.5
w: Unit weight of water (t/m3) 1.00 t/m3
d: Unit weight of soil (dry) (t/m3) 1.80 t/m3
Gwd
s: Unit weight of soil (saturated) (t/m3) 2.00 t/m3
D
c: Unit weight of reinforced concrete (t/m3) 2.40 t/m3
ck: Concrete Design Strength 300 kgf/m2
ca Allowable Stress of Concrete 100 kgf/m2
t2
sa: Allowable Stress of Reinforcement Bar 2400 kgf/m2 400
a: Allowable Stress of Shearing (Concrete) 10 kgf/m2
sy: Yielding Point of Reinforcement Bar 5000 kgf/m2
n: Young's Modulus Ratio 8
H
Hf Fa: Safety factor against uplift 1.2
HT
Basic Dimensions
Hf
H: Internal Height of Box Culvert 3 1.50 m
t3 B: Internal Width of Box Culvert 4 1.00 m
t1 t1 Hf: Fillet Height 0.15 m
B t1: Thickness of Side Wall 5 0.25 m (> 0.25m)
t2: Thickness of Top Slab 6 0.25 m (> 0.25m)
BT t3: Thickness of Invert (Bottom Slab) 7 0.25 m (> 0.25m)
BT: Gross Width of Box Culvert 1.50 m
HT: Gross Height of Box Culvert 2.00 m
D: Covering Depth 8 6.00 m
Gwd: Underground Water Depth for Case 1, 2 6.00 m (= D)
hiw: Internal Water Depth for Case 1, 2 0.00 m
for Case 3, 4 1.50 m
Dimension of frame
t1 B t1
H0: Height of frame t2/2 + H + t3/2 1.750 m
D1 B0: Width of frame B + t1 1.250 m
t2 D1: Covering depth at middle of top slab D + t2/2 6.125 m
H H0
t3
B0
1/ 6 (1)SingleBoxCulvert, 02Load
Load distribution of truck tire
Case.L1: Pvt1 = 0.0590 tf/m2, B= 1.250 m Combination for Case.L2 (2) (2) (3) (3)
Pvt2 = 0.0590 tf/m2, B= 1.250 m a) + b) a) + c) a) + b) a) + c)
Case.L2: Pvt1 = 0.1181 tf/m2, B= 1.250 m Distributed load total 0.1181 0.0738 0.1181 0.0590
Pvt2 = 0.0000 tf/m2, B= 0.000 m Select the combination case of 0.1181 tf/m2,
for Case.L2, which is the largest load to the top slab.
In case of covering depth (D) is over 3.0m, uniform load of 1.0 tf/m2 is applied on the top slab of culvert instead of live load calculated above.
2/ 6 (1)SingleBoxCulvert, 02Load
3 Load calculation
Case 1: Box Culvert Inside is Empty, Underground Water up to Top slab, Track load Case. L1
1) vertical load against top slab
Acting Load (tf/m2)
Wtop= (t2*BT+Hf^2)*c/B0 Wtop= 0.7632
Pvd=Gwd*gd+(D-Gwd)*gs Pvd= 10.8000
Pvt1 Pvt1= 1.0000
Pvt2 Pvt2= 0.0000
Pv1= 12.5632
5) ground reaction
Acting Load (tf/m2)
Wbot=(t3*BT+Hf^2)*c/B0 Wbot= 0.7632
Wtop Wtop= 0.7632
Ws=Wsw*2/B0 Ws= 1.4400
Pvd Pvd= 10.8000
Pvt1 Pvt1= 1.0000
Pvt2 Pvt2= 0.0000
Wiw=(hiw*B-2Hf^2)*w/B0 Wiw= 0.0000 hiw: internal water depth 0.00 m
Up=-U/B0 U= -2.4000
Q= 12.3664
3/ 6 (1)SingleBoxCulvert, 02Load
Case 2: Box Culvert Inside is Empty, Underground Water up to Top slab, Track load Case. L2
1) vertical load against top slab
Acting Load (tf/m2)
Wtop= (t2*BT+Hf^2)*c/B0 Wtop= 0.7632
Pvd=Gwd*gd+(D-Gwd)*gs Pvd= 10.8000
Pvt1 Pvt1= 1.0000
Pvt2 Pvt2= 0.0000
Pv1= 12.5632
5) ground reaction
Acting Load (tf/m2)
Wbot=(t3*BT+Hf^2)*c/B0 Wbot= 0.7632
Wtop Wtop= 0.7632
Ws=Wsw*2/B0 Ws= 1.4400
Pvd Pvd= 10.8000
Pvt1 Pvt1= 1.0000
Pvt2 Pvt2= 0.0000
Wiw=(hiw*B-2Hf^2)*w/B0 Wiw= 0.0000 hiw: internal water depth 0.00 m
Up=-U/B0 U= -2.4000
Q= 12.3664
4/ 6 (1)SingleBoxCulvert, 02Load
Case 3: Box Culvert Inside is Full, Underground Water up to invert, Track load Case. L1
1) vertical load against top slab
Acting Load (tf/m2)
Wtop= (t2*BT+Hf^2)*c/B0 Wtop= 0.7632
Pvd=D*d Pvd= 10.8000
Pvt1 Pvt1= 1.0000
Pvt2 Pvt2= 0.0000
Pv1= 12.5632
5) ground reaction
Acting Load (tf/m2)
Wbot=(t3*BT+Hf^2)*c/B0 Wbot= 0.7632
Wtop Wtop= 0.7632
Ws=Wsw*2/B0 Ws= 1.4400
Pvd Pvd= 10.8000
Pvt1 Pvt1= 1.0000
Pvt2 Pvt2= 0.0000
Wiw=(hiw*B-2Hf^2)*w/B0 Wiw= 1.1640 hiw: internal water depth 1.500 m
Up=0 U= 0.0000
Q= 15.9304
5/ 6 (1)SingleBoxCulvert, 02Load
Case 4: Box Culvert Inside is Full, Underground Water up to invert, Track load Case. L2
1) vertical load against top slab
Acting Load (tf/m2)
Wtop= (t2*BT+Hf^2)*c/B0 Wtop= 0.7632
Pvd=D*d Pvd= 10.8000
Pvt1 Pvt1= 1.0000
Pvt2 Pvt2= 0.0000
Pv1= 12.5632
5) ground reaction
Acting Load (tf/m2)
Wbot=(t3*BT+Hf^2)*c/B0 Wbot= 0.7632
Wtop Wtop= 0.7632
Ws=Wsw*2/B0 Ws= 1.4400
Pvd Pvd= 10.8000
Pvt1 Pvt1= 1.0000
Pvt2 Pvt2= 0.0000
Wiw=(hiw*B-2Hf^2)*w/B0 Wiw= 1.1640 hiw: internal water depth 1.500 m
Up=0 U= 0.0000
Q= 15.9304
6/ 6 (1)SingleBoxCulvert, 02Load
4 Analysis of Plane Frame
Case 1: Box Culvert Inside is Empty, Underground Water up to Top slab, Track load Case. L1
k1 = 1.0
k2 = H0t23/(B0t13) = 1.4000
k3 = H0t33/(B0t13) = 1.4000
A = -D B = -C R =0
A = 0.11839 C = 0.12041
B = -0.12041 D = -0.11839
1/16 (2)SingleBoxCulvert03MSN
MAB = k1(2A +B) - CAB = -1.9891 tf・m
MBA = k1(2B+A)+CBA = 1.8044 tf・m
MBC = k2(2B+C) - CBC = -1.8044 tf・m
MCB = k2(2C+B)+CCB = 1.8044 tf・m
MCD = k1(2C+D) - CCD = -1.8044 tf・m
MDC =k1 (2D+ C)+CDC = 1.9891 tf・m
MDA = k3(2D+A) - CDA = -1.9891 tf・m
MAD = k3(2A+D)+CAD = 1.9891 tf・m
c) Bending Moment
MA = MAB = -1.989 tf・m
MB = -MBA = -1.804 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SAB - w1x - (w2 - w1)x2/(2L)
= 7.5284 -9.6500 x + 1.0000 x2 , x = 8.794
0.856
Bending moment at x = 0.8561 m is;
Mmax = SABx - w1x2/2 - (w2-w1)x3/(6L) + MAB = 1.129 tf・m
2/16 (2)SingleBoxCulvert03MSN
2-2) Top Slab
a) Shearing Force at joint
c) Bending Moment
MB = MBC = -1.804 tf・m
MC = -MCB = -1.804 tf・m
The maximum bending moment occurs at the center of member due to symmetry loading distribution.
Bending moment at x = 0.625 m is;
Mmax = SBCx - w1x2/2 - w2(x-a)2/2 + MBC = 0.649 tf・m
3/16 (2)SingleBoxCulvert03MSN
b) Shearing Force at 2d point from joint
Shearing force at the point with a distance of 2d from joint is calculated by following equation.
Sx = SCD - w1x - (w2 - w1)x2/(2L)
c) Bending Moment
MC = MCD = -1.804 tf・m
MD = -MDC = -1.989 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SCD - w1x - (w2 - w1)x2/(2L)
= 6.2966 -6.1500 x -1.0000 x2 , x = -7.044
0.894
Bending moment at x = 0.8939 m is;
Mmax = SCDx - w1x2/2 - (w2-w1)x3/(6L) + MCD = 1.12889 tf・m
c) Bending Moment
MD = MDA = -1.989 tf・m
MA = -MAD = -1.989 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SDA - w1x - (w2 - w1)x2/(2L)
= 8.7520 -14.0032 x , x = 0.625
4/16 (2)SingleBoxCulvert03MSN
Case 2: Box Culvert Inside is Empty, Underground Water up to Top slab, Track load Case. L2
k1 = 1.0
k2 = H0t23/(B0t13) = 1.40000
k3 = H0t33/(B0t13) = 1.40000
A = -D B = -C R =0
A = 0.11839 C = 0.12041
B = -0.12041 D = -0.11839
5/16 (2)SingleBoxCulvert03MSN
MAB = k1(2A +B) - CAB = -1.9891 tf・m
MBA = k1(2B+A)+CBA = 1.8044 tf・m
MBC = k2(2B+C) - CBC = -1.8044 tf・m
MCB = k2(2C+B)+CCB = 1.8044 tf・m
MCD = k1(2C+D) - CCD = -1.8044 tf・m
MDC =k1 (2D+ C)+CDC = 1.9891 tf・m
MDA = k3(2D+A) - CDA = -1.9891 tf・m
MAD = k3(2A+D)+CAD = 1.9891 tf・m
c) Bending Moment
MA = MAB = -1.989 tf・m
MB = -MBA = -1.804 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SAB - w1x - (w2 - w1)x2/(2L)
= 7.5284 -9.6500 x + 1.0000 x2 , x = 8.794
0.856
Bending moment at x = 0.8561 m is;
Mmax = SABx - w1x2/2 - (w2-w1)x3/(6L) + MAB = 1.129 tf・m
6/16 (2)SingleBoxCulvert03MSN
2-2) Top Slab
a) Shearing Force at joint
c) Bending Moment
MB = MBC = -1.804 tf・m
MC = -MCB = -1.804 tf・m
The maximum bending moment occurs at the center of member due to symmetry loading distribution.
Bending moment at x = 0.625 m is;
Mmax = SBCx - w1x2/2 - w2(x-a)2/2 + MBC = 0.649 tf・m
7/16 (2)SingleBoxCulvert03MSN
b) Shearing Force at 2d point from joint
Shearing force at the point with a distance of 2d from joint is calculated by following equation.
Sx = SCD - w1x - (w2 - w1)x2/(2L)
(i) In case of x1 = 0.380 m
Sx1 = 3.815 tf
(ii) In case of x2 = 1.370 m
Sx2 = -4.006 tf
c) Bending Moment
MC = MCD = -1.804 tf・m
MD = -MDC = -1.989 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SCD - w1x - (w2 - w1)x2/(2L)
= 6.2966 -6.1500 x -1.0000 x2 , x = -7.0439
0.8939
Bending moment at x = 0.8939 m is;
Mmax = SCDx - w1x2/2 - (w2-w1)x3/(6L) + MCD = 1.1289 tf・m
c) Bending Moment
MD = MDA = -1.989 tf・m
MA = -MAD = -1.989 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SDA - w1x - (w2 - w1)x2/(2L)
= 8.7520 -14.0032 x , x = 0.6250
8/16 (2)SingleBoxCulvert03MSN
Case 3: Box Culvert Inside is Full, Underground Water up to invert, Track load Case. L1
k1 = 1.0
k2 = H0t23/(B0t13) = 1.40000
k3 = H0t33/(B0t13) = 1.40000
A = -D B = -C R =0
A = -0.09819 C = -0.05645
B = 0.05645 D = 0.09819
9/16 (2)SingleBoxCulvert03MSN
MAB = k1(2A +B) - CAB = -1.68586 tf・m
MBA = k1(2B+A)+CBA = 1.55680 tf・m
MBC = k2(2B+C) - CBC = -1.55680 tf・m
MCB = k2(2C+B)+CCB = 1.55680 tf・m
MCD = k1(2C+D) - CCD = -1.55680 tf・m
MDC =k1 (2D+ C)+CDC = 1.68586 tf・m
MDA = k3(2D+A) - CDA = -1.68586 tf・m
MAD = k3(2A+D)+CAD = 1.68586 tf・m
c) Bending Moment
MA = MAB = -1.686 tf・m
MB = -MBA = -1.557 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SAB - w1x - (w2 - w1)x2/(2L)
= 5.3784 -6.0875 x + 0.0214 x2 , x = 283.197
0.886
Bending moment at x = 0.8863 m is;
Mmax = SABx - w1x2/2 - (w2-w1)x3/(6L) + MAB = 0.695 tf・m
10/16 (2)SingleBoxCulvert03MSN
2-2) Top Slab
a) Shearing Force at joint
c) Bending Moment
MB = MBC = -1.557 tf・m
MC = -MCB = -1.557 tf・m
The maximum bending moment occurs at the center of member due to symmetry loading distribution.
Bending moment at x = 0.625 m is;
Mmax = SBCx - w1x2/2 - w2(x-a)2/2 + MBC = 0.897 tf・m
11/16 (2)SingleBoxCulvert03MSN
b) Shearing Force at 2d point from joint
Shearing force at the point with a distance of 2d from joint is calculated by following equation.
Sx = SCD - w1x - (w2 - w1)x2/(2L)
(i) In case of x1 = 0.380 m
Sx1 = 2.921 tf
(ii) In case of x2 = 1.370 m
Sx2 = -3.068 tf
c) Bending Moment
MC = MCD = -1.557 tf・m
MD = -MDC = -1.686 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SCD - w1x - (w2 - w1)x2/(2L)
= 5.2091 -6.0125 x -0.0214 x2 , x = -281.45
0.864
Bending moment at x = 0.8637 m is;
Mmax = SCDx - w1x2/2 - (w2-w1)x3/(6L) + MCD = 0.695 tf・m
c) Bending Moment
MD = MDA = -1.686 tf・m
MA = -MAD = -1.686 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SDA - w1x - (w2 - w1)x2/(2L)
= 8.7520 -14.0032 x , x = 0.625
12/16 (2)SingleBoxCulvert03MSN
Case 4: Box Culvert Inside is Full, Underground Water up to invert, Track load Case. L2
k1 = 1.0
k2 = H0t23/(B0t13) = 1.40000
k3 = H0t33/(B0t13) = 1.40000
A = -D B = -C R =0
A = -0.09819 C = -0.05645
B = 0.05645 D = 0.09819
13/16 (2)SingleBoxCulvert03MSN
MAB = k1(2A +B) - CAB = -1.68586 tf・m
MBA = k1(2B+A)+CBA = 1.55680 tf・m
MBC = k2(2B+C) - CBC = -1.55680 tf・m
MCB = k2(2C+B)+CCB = 1.55680 tf・m
MCD = k1(2C+D) - CCD = -1.55680 tf・m
MDC =k1 (2D+ C)+CDC = 1.68586 tf・m
MDA = k3(2D+A) - CDA = -1.68586 tf・m
MAD = k3(2A+D)+CAD = 1.68586 tf・m
c) Bending Moment
MA = MAB = -1.686 tf・m
MB = -MBA = -1.557 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SAB - w1x - (w2 - w1)x2/(2L)
= 5.3784 -6.0875 x + 0.0214 x2 , x = 283.197
0.886
Bending moment at x = 0.8863 m is;
2 3
Mmax = SABx - w1x /2 - (w2-w1)x /(6L) + MAB = 0.695 tf・m
14/16 (2)SingleBoxCulvert03MSN
2-2) Top Slab
a) Shearing Force at joint
c) Bending Moment
MB = MBC = -1.557 tf・m
MC = -MCB = -1.557 tf・m
The maximum bending moment occurs at the center of member due to symmetry loading distribution.
Bending moment at x = 0.625 m is;
Mmax = SBCx - w1x2/2 - w2(x-a)2/2 + MBC = 0.897 tf・m
15/16 (2)SingleBoxCulvert03MSN
b) Shearing Force at 2d point from joint
Shearing force at the point with a distance of 2d from joint is calculated by following equation.
Sx = SCD - w1x - (w2 - w1)x2/(2L)
(i) In case of x1 = 0.380 m
Sx1 = 2.9212 tf
(ii) In case of x2 = 1.370 m
Sx2 = -3.0683 tf
c) Bending Moment
MC = MCD = -1.557 tf・m
MD = -MDC = -1.686 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SCD - w1x - (w2 - w1)x2/(2L)
= 5.2091 -6.0125 x -0.0214 x2 , x = -281.4
0.864
Bending moment at x = 0.8637 m is;
Mmax = SCDx - w1x2/2 - (w2-w1)x3/(6L) + MCD = 0.695 tf・m
c) Bending Moment
MD = MDA = -1.686 tf・m
MA = -MAD = -1.686 tf・m
The maximum bending moment occurs at the point of that shearing force equal to zero.
Sx = 0 = SDA - w1x - (w2 - w1)x2/(2L)
= 8.7520 -14.0032 x , x = 0.625
16/16 (2)SingleBoxCulvert03MSN
Summary of Internal forces
Check M N S (tf)
Member Case
Point (tf・m) (tf) at joint at 2d
Side wall A -1.989 8.752 7.528 4.006
(left) Case.1 Middle 1.129 8.312 0.000 -
B -1.804 7.852 -6.297 -3.815
A -1.989 8.752 7.528 4.006
Case.2 Middle 1.129 8.312 0.000 -
B -1.804 7.852 -6.297 -3.815
A -1.686 8.752 5.378 3.068
Case.3 Middle 0.695 8.296 0.000 -
B -1.557 7.852 -5.209 -2.921
A -1.686 8.752 5.378 3.068
Case.4 Middle 0.695 8.296 0.000 -
B -1.557 7.852 -5.209 -2.921
Top slab B -1.804 6.297 7.852 3.078
Case.1 Middle 0.649 6.297 0.000 -
C -1.804 6.297 -7.852 -3.078
B -1.804 6.297 7.852 3.078
Case.2 Middle 0.649 6.297 0.000 -
C -1.804 6.297 -7.852 -3.078
B -1.557 5.209 7.852 3.078
Case.3 Middle 0.897 5.209 0.000 -
C -1.557 5.209 -7.852 -3.078
B -1.557 5.209 7.852 3.078
Case.4 Middle 0.897 5.209 0.000 -
C -1.557 5.209 -7.852 -3.078
Side wall C -1.804 7.852 6.297 3.815
(right) Case.1 Middle 1.129 8.312 0.000 -
D -1.989 8.752 -7.528 -4.006
C -1.804 7.852 6.297 3.815
Case.2 Middle 1.129 8.312 0.000 -
D -1.989 8.752 -7.528 -4.006
C -1.557 7.852 5.209 2.921
Case.3 Middle 0.695 8.296 0.000 -
D -1.686 8.752 -5.378 -3.068
C -1.557 7.852 5.209 2.921
Case.4 Middle 0.695 8.296 0.000 -
D -1.686 8.752 -5.378 -3.068
Invert D -1.989 7.528 8.752 3.431
Case.1 Middle 0.746 7.528 0.000 -
A -1.989 7.528 -8.752 -3.431
D -1.989 7.528 8.752 3.431
Case.2 Middle 0.746 7.528 0.000 -
A -1.989 7.528 -8.752 -3.431
D -1.686 5.378 8.752 3.431
Case.3 Middle 1.049 5.378 0.000 -
A -1.686 5.378 -8.752 -3.431
D -1.686 5.378 8.752 3.431
Case.4 Middle 1.049 5.378 0.000 -
A -1.686 5.378 -8.752 -3.431
Case.2
M= 1.9891 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 8.7520 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 7.5284 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 4.0058 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 22.73 cm
Solving the formula shown below, c = 75.526 kgf/cm2 ( -5E-05 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +428.74 c^2 -12754 c -1913160.30
s = nc/(nc+sa) = 0.2011
Asreq = (c*s/2 - N/(bd))bd/sa = 2.3660 cm2
Case.3
M= 1.6859 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 8.7520 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 5.3784 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 3.0683 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 19.26 cm
Solving the formula shown below, c = 70.268 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +431.26 c^2 -11242 c -1686372.09
s = nc/(nc+sa) = 0.1898
Asreq = (c*s/2 - N/(bd))bd/sa = 1.6319 cm2
Case.4
M= 1.6859 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 8.7520 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 5.3784 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 3.0683 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 19.26 cm
Solving the formula shown below, c = 70.268 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +431.26 c^2 -11242 c -1686372.09
s = nc/(nc+sa) = 0.1898
Asreq = (c*s/2 - N/(bd))bd/sa = 1.6319 cm2
The maximum requirement of reinforcement bar is 2.3660 cm2 in Case. 1 from above calculation.
Case. 1 2 3 4
Requirement 2.3660 2.3660 1.6319 1.6319 (cm2)
Case.2
M= 1.8044 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 7.8520 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 6.2966 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 3.8152 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 22.98 cm
Solving the formula shown below, c = 71.329 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +430.76 c^2 -11542 c -1731278.45
s = nc/(nc+sa) = 0.1921
Asreq = (c*s/2 - N/(bd))bd/sa = 2.1519 cm2
Case.4
M= 1.5568 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 7.8520 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 5.2091 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 2.9212 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 19.83 cm
Solving the formula shown below, c = 66.885 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +432.82 c^2 -10307 c -1546092.54
s = nc/(nc+sa) = 0.1823
Asreq = (c*s/2 - N/(bd))bd/sa = 1.5549 cm2
The maximum requirement of reinforcement bar is 2.1519 cm2 in Case. 1 from above calculation.
Case. 1 2 3 4
Requirement 2.1519 2.1519 1.5549 1.5549 (cm2)
Case.4
M= 1.5568 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 5.2091 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 7.8520 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 3.0780 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 29.89 cm
Solving the formula shown below, c = 63.684 kgf/cm2 ( -4E-06 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +434.25 c^2 -9450.7 c -1417606.34
s = nc/(nc+sa) = 0.1751
Asreq = (c*s/2 - N/(bd))bd/sa = 2.2438 cm2
The maximum requirement of reinforcement bar is 2.5559 cm2 in Case. 1 from above calculation.
Case. 1 2 3 4
Requirement 2.5559 2.5559 2.2438 2.2438 (cm2)
Case.2
M= 1.9891 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 7.5284 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 8.7520 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 3.4308 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 26.42 cm
Solving the formula shown below, c = 74.170 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +429.4 c^2 -12358 c -1853677.45
s = nc/(nc+sa) = 0.1982
Asreq = (c*s/2 - N/(bd))bd/sa = 2.6829 cm2
Case.3
M= 1.6859 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 5.3784 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 8.7520 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 3.4308 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 31.34 cm
Solving the formula shown below, c = 66.302 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +433.08 c^2 -10149 c -1522366.39
s = nc/(nc+sa) = 0.1810
Asreq = (c*s/2 - N/(bd))bd/sa = 2.5094 cm2
Case.4
M= 1.6859 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 5.3784 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
S0= 8.7520 tf n= 8 d' = 6 cm (protective covering depth)
S2d= 3.4308 tf c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 31.34 cm
Solving the formula shown below, c = 66.302 kgf/cm2 ( 4.8E-07 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +433.08 c^2 -10149 c -1522366.39
s = nc/(nc+sa) = 0.1810
Asreq = (c*s/2 - N/(bd))bd/sa = 2.5094 cm2
The maximum requirement of reinforcement bar is 2.6829 cm2 in Case. 1 from above calculation.
Case. 1 2 3 4
Requirement 2.6829 2.6829 2.5094 2.5094 (cm2)
Case.2
M= 1.1289 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 8.3117 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
n= 8 d' = 6 cm (protective covering depth)
c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 13.58 cm
Solving the formula shown below, c = 59.295 kgf/cm2 ( 0.0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +436.13 c^2 -8322.6 c -1248395.80
s = nc/(nc+sa) = 0.1650
Asreq = (c*s/2 - N/(bd))bd/sa = 0.4103 cm2 Tensile is on inside of member
The maximum requirement of reinforcement bar is 0.4103 cm2 in Case. 1 from above calculation.
Case. 1 2 3 4
Requirement 0.4103 0.4103 0.0000 0.0000 (cm2)
Side inside inside inside inside
Case.2
M= 0.7459 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 7.5284 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
n= 8 d' = 6 cm (protective covering depth)
c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 9.91 cm
Solving the formula shown below, c = 50.166 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +439.73 c^2 -6159.2 c -923880.96
s = nc/(nc+sa) = 0.1433
Asreq = (c*s/2 - N/(bd))bd/sa = 0.0000 cm2 Tensile is on inside of member
Case.3
M= 1.0491 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 5.3784 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
n= 8 d' = 6 cm (protective covering depth)
c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 19.51 cm
Solving the formula shown below, c = 53.734 kgf/cm2 ( 5.1E-05 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +438.38 c^2 -6974.3 c -1046146.31
s = nc/(nc+sa) = 0.1519
Asreq = (c*s/2 - N/(bd))bd/sa = 0.9900 cm2 Tensile is on inside of member
Case.4
M= 1.0491 tf・m ca = 100 kgf/m2 h= 25 cm (height of member)
N= 5.3784 tf sa = 2400 kgf/m2 d= 19 cm (effective height of member)
n= 8 d' = 6 cm (protective covering depth)
c= 6.50 cm (distance from neutral axis)
b= 100 cm
e = M/N = 19.51 cm
Solving the formula shown below, c = 53.734 kgf/cm2 ( 0 kgf/cm2) o.k.
c^3+{3sa/(2n) - 3N(e+c)/(bd^2)}c^2 - 6N(e+c)sac/(nbd^2) - 3N(e+c)sa^2/(n^2bd^2) = 0
0 = c^3 +438.38 c^2 -6974.3 c -1046146.31
s = nc/(nc+sa) = 0.1519
Asreq = (c*s/2 - N/(bd))bd/sa = 0.9900 cm2 Tensile is on inside of member
The maximum requirement of reinforcement bar is 0.9900 cm2 in Case. 3 from above calculation.
Case. 1 2 3 4
Requirement 0.0000 0.0000 0.9900 0.9900 (cm2)
Side inside inside inside inside
Required reinforcement for design is the maximum required reinforcement calculated above in 1) - 4).
Item Side wall Side wall Top slab Invert Side wall Top slab Invert
Point bottom top end end middle middle middle
Side outside outside outside outside inside inside inside
Calculation 1) 2) 3) 4) 5) 6) 7)
Requirement 2.366 2.152 2.556 2.683 0.410 0.675 0.990 (cm2)
Required R-bar Asreq cm2 2.37 0.41 2.15 2.56 0.67 2.68 0.99
Compressive stress c kgf/cm2 48.4 28.3 44.0 45.0 20.8 49.3 24.1
Allowable stress ca kgf/cm2 100.0 100.0 100.0 100.0 100.0 100.0 100.0
ok ok ok ok ok ok ok
Tensile stress s kgf/cm2 791.9 380.7 724.1 828.8 276.7 873.6 332.5
Allowable stress sa kgf/cm2 2400.0 2400.0 2400.0 2400.0 2400.0 2400.0 2400.0
ok ok ok ok ok ok ok
Shearing stress at joint kgf/cm2 3.96 0.00 3.31 4.13 0.00 4.61 0.00
Allowable stress a kgf/cm2 20.00 20.00 20.00 20.00 20.00 20.00 20.00
ok ok ok ok ok ok ok
Shearing stress at 2d 2d kgf/cm2 2.11 - 2.01 1.62 - 1.81 -
Allowable stress 2da kgf/cm2 10.00 - 10.00 10.00 - 10.00 -
ok - ok ok - ok -
Resisting Moment Mr kgfcm 390,591 316,064 389,167 386,939 385,562 388,679 403,250
Mr for compression Mrc kgfcm 390,591 316,064 389,167 386,939 385,562 388,679 403,250
x for Mrc cm 5.181 4.206 5.088 4.930 4.823 5.055 5.062
s for Mrc kgf/cm2 2133.6 2813.8 2187.5 2283.0 2351.5 2207.1 2202.6
Mr for tensile Mrs kgfcm 555,087 351,366 539,510 512,860 494,432 533,938 554,411
x for Mrs cm 5.960 4.926 5.864 5.694 5.571 5.829 5.859
c for Mrs kgf/cm2 137.1 105.0 133.9 128.4 124.5 132.8 133.7
Distribution bar (>As/6 and >Asmin) 12@250 12@250 12@250 12@250 12@250 12@250 12@250
Reinforcement As cm2 4.52 4.52 4.52 4.52 4.52 4.52 4.52
ok ok ok ok ok ok ok
Reinforcement bar for fillet 12@250 12@250
Reinforcement As cm2 4.52 4.52