REF. NO.

TENDER COMMITTEE PAPER PAPER NO.

CATEGORY REQUEST FOR APPROVAL TENDER NUMBER Formatted Table

PROVISION OF EPCC FOR ROADS AND Formatted: Font: 14 pt, (Asian) Chinese (PRC)

BRIDGES PACKAGES 2 ENGINEERING, HFY-CON/F&C0642- Formatted: Font: 14 pt, (Asian) Chinese (PRC)
TENDERS Formatted: Centered, Right: 0", Tab stops: 0.5", Left
PROCUREMENT, CONSTRUCTION & 0656HFY-CON/F&C0690-
DESCRIPTION Formatted: Font: 14 pt, (Asian) Chinese (PRC)
COMMISIONING FOR CPF1 NEW PRODUCTION 0714
STAFF CAMP

PREPARED AND PRESENTED BY REVIEWED BY Formatted Table


No. NAME SIGNATURE
1 Najm Abdul Hussein
2 Urba Ram Brahma
3 Ali Mutasim
4 Imtiaz Ahmed
5 Jose Urdaneta
DEPUTY MANAGER S.H. MANAGER MANAGER
6 Yang Yifeng/He Xiaozhen
CPL DEPT. F&C DEPT. F&C DEPT. PLANNING DEPT.

REVIEWED BY ENDORSED BY TC SECRETARY Formatted Table

MANAGER MANAGER MANAGER GENERAL MANAGER


HSE DEPT. FINANCE DEPT. LEGAL DEPT. E&P-DIVISION
Formatted: Font: 10 pt

TABLE OF CONTENTS

SECTION 1.0 OBJECTIVE.

SECTION 2.0 BACKGROUND.

SECTION 3.0 REASON FOR CANCELLING THE PROJECT TENDER PROCESS.

SECTION 4.0 RECOMMENDATION.

SECTION 5.0 NEXT STEP.

Provision of Engineering, Procurement, Construction & Commissioning for CPF1 New Production Staff Camp: Page 2 of 4
Request for Approval.
Formatted: Font: (Default) Arial, 10 pt

SECTION 1.0 OBJECTIVE


Formatted: Font: Not Bold, No underline, Font color: Black,
To seek Tender Committee’s approval of the following for the Provision of EPCC for Roads and Bridges Package-2Provision of (Asian) Chinese (PRC), (Other) English (United Kingdom)
Engineering, Procurement, Construction & Commissioning for CPF1 New Production Staff Camp:
Formatted: Font: (Default) Arial, 10 pt

1. To Cancel the Project Tendering Process Formatted: Font: 10 pt


Formatted: Superscript
SECTION 2.0 BACKGROUND Formatted: Font: 10 pt

2.1 PROJECT/TENDER BRIEF Formatted: Font: 10 pt


Formatted: Font: (Default) Arial, 10 pt
 TC approved the Contracting Strategy on 24th Nov 2014 2nd March 2015. However, issuance of ITB was on hold till today Formatted: Font: (Default) Arial, 10 pt
according to TC directive. Formatted: Font: (Default) Arial, 10 pt
 As per latest status, the Basic Design along with SOW is to be updated by CPE. Formatted: Font: 10 pt
 The estimated cost by PCH is 9,701,000.0015.91 Million USD for the project.
Formatted: Font: (Default) Arial, 10 pt
 The brief scope of work under this tender includes as follows:
Formatted: Font: Bold
- Site clearance and backfilling the site to 5.7 m elevationBuild two (2) oilfield main roads i.e. Road-2(length 7.035km) Formatted: Font: (Default) Arial, 10 pt, Bold
and Road-3(length 5.745km). Formatted: Font: (Default) Arial, 10 pt
- Demolish and build the irrigation pipe and culvert, which cross the existing and new roadConstruction of five
Formatted: Font: 10 pt
dormitory buildings with total area of 2968.0 m2 to accommodate 122 persons; office building for 75 persons with
Formatted: Font: (Default) Arial, 10 pt
total area of 826.0 m2; complex building including canteen and logistic service with total area of 884.0 m2; guard
room; two parking shelters; blindages and other structures. Formatted: Font: 10 pt

- Provide road markings and safety traffic sign for the main roadsHSE & security duty office shall be built to monitor Formatted: Font: Bold
the CPF1 area including office, training and first aid station with a total area of 744.0 m2. Formatted: Font: 10 pt
- Remove/rebuild the structure affected by the traffic, such as power lines, existing signboard, and so onProvision and Formatted: Font: 10 pt
construction of HVAC system, electrical system, telecommunication system, and WSD system including fresh Formatted: Font: 10 pt
water treatment system and integrated sewage treatment system, and ancillary facilities.
Formatted: Font: 10 pt
- Build box culvert for irrigation water to cross main roads
Formatted: Font: (Default) Arial, 10 pt
- Build slab culvert for the production pipeline to cross main roads in the future.
Formatted: Font: 10 pt

SECTION 3.0 REASON FOR CANCELLING THE PROJECT TENDER PROCESS Formatted: Font: 10 pt
Formatted: Font: (Default) Arial
 There is no budget allocation in WPB-20176 for this project due to low oil price. Formatted: Font: 10 pt

Formatted: Font: 10 pt
 Due to suspension of CPF3, there is no need of for staff camp at CPF1 at this current situation.
Formatted: Font: (Default) Arial, 10 pt
Formatted: Font: 10 pt
Provision of Engineering, Procurement, Construction & Commissioning for CPF1 New Production Staff Camp: Page 3 of 4
Request for Approval.
Formatted: Font: (Default) Arial, 10 pt

SECTION 4.0 RECOMMENDATION Formatted: Font: 10 pt

We hereby seek Tender Committee’s approval of the following for the Provision of EPCC for Roads and Bridges Package-2: Formatted: Font: (Default) Arial, 10 pt
Engineering, Procurement, Construction & Commissioning for CPF1 New Production Staff Camp: Formatted: Font: (Default) Arial, 10 pt

1. To Cancel the Project Tender Process. Formatted: Font: (Default) Arial, 10 pt


Formatted: Font: 10 pt

SECTION 5.0 NEXT STEP

 To follow and implement TC directives on the matter.

Provision of Engineering, Procurement, Construction & Commissioning for CPF1 New Production Staff Camp: Page 4 of 4
Request for Approval.