Type of JSA : / New Revised Purpose of JSA : Non Routine Work / Routine Work Turnaround Projects Other…
PREPARED BY : CTCI & KPSB
Name Position Company Signature Date Name Position Company Signature Date
LUQMAN OSMAN HSE SV ABB
Reviewed by: Reviewed by CTCI:
1 SHAH NAWAZ SAFETY ADVISOR ABB 1
2 2
3 3
1. Approved for Submission: 2. Approved by KPSB:
1 1
Workers : I acknowledge receiving these instruction, understand the instruction, and fully comply with the JSA
Comp Name
Signature I/C No. Date Company Name Signature I/C No. Date
any
Page 1 of 6
KIMANIS POWER PROJECT
BASIC JOB STEP POTENTIAL HAZARDS Who or What might Risk CONTROLS Action
be harmed Rating Party
(Person/Equip/ Env)
1.0 Apply & obtain PTW 1.1 Slip trip and fall person 1.1.1 Safety Induction/toolbox to be conducted for all Supervisor
before commence work. L personnel involved.
1.1.2 Ensure responsible person aware & comply to
the requirements
1.1.3 PTW to be made known & understood by all
workers and displayed at work designated
area
1.1.4 To comply with work related PPE before
commence work
BASIC JOB STEP POTENTIAL HAZARDS Who or What might Risk CONTROLS Action
be harmed Rating Party
(Person/Equip/ Env)
operation.
3.0 Rolling cable 3.1 Inadequate training for the task Person 3.1.1 Training on cable pulling activities
L Supervisor
3.1.2 Brief during toolbox
3.2 Ergonomic Person (back pain/ L 3.2.1 Proper handling method Supervisor
injury) 3.2.2 Practice buddy system
3.3 Over heat Person (dehydrated M 3.3.1 Consume enough water before commencing Supervisor
and stressed)
works
3.3.2 Drinking water made available near the working
area
3.3.3 Close supervision by Work Supervisor to ensure
the personnel is fit to continue his work
3.3.4 Work related PPE to be worn
Page 3 of 6
KIMANIS POWER PROJECT
BASIC JOB STEP POTENTIAL HAZARDS Who or What might Risk CONTROLS Action
be harmed Rating Party
(Person/Equip/ Env)
4.0 Laying cable inside cable 4.1 Ergonomic 4.1.1 To implement buddy system when carrying out
Person (back pain) L Supervisor
tray Cable pulling task.
4.1.2 Proper manual handling
4.1.3 Toolbox briefing
4.1.4 Work related PPE to be worn at all times
5.2 Sharp object Person M 5.2.1 Use proper PPE ( hand glove and long sleeve Supervisor
jacket).
5.2.2 Emphasize during toolbox briefing.
Page 4 of 6
KIMANIS POWER PROJECT
BASIC JOB STEP POTENTIAL HAZARDS Who or What might Risk CONTROLS Action
be harmed Rating Party
(Person/Equip/ Env)
Supervisor
5.4.1 Follow CTCI Waste Management Requirements.
5.4 Obstruction material at access way Person L
5.4.2 Properly identify the type of waste and segregate
accordingly before discarding.
5.4.3 Properly barricade the working area access
route.
GENERAL NOTES
• Basic PPE (Safety Helmet @ Hard Hat, Safety Shoes, Safety Glass and Long Sleeve Jacket) shall be worn at all the time.
• Set up barricades around work area and display warning signs.
• All equipment / machinery to be inspected by CTCI before any work commences.
Page 5 of 6
KIMANIS POWER PROJECT
• All PTW and supporting permits must be valid before any works begins.
• On hearing of emergency siren, stop all works, machinery & source of ignition and walk on foot to the nearest muster point.
• Vehicle to exit immediately to designated parking area after delivery of material.
• No eating and resting on site. Use designated eating and resting area.
• All pressure gauges used must be calibrated and tagged with valid calibration sticker.
• All scaffolding must have a green "safe to use" tag before put into service.
• Maintain good housekeeping daily at all the work places.
• Tool box talk specific on work instruction and briefing on hazards and control measures to be conducted before start of work.
Page 6 of 6