You are on page 1of 6

Form A

Form No ....
(for official use only)

1. Title of the Project: Solar Based Vegetable Cart


2. Discipline/ Subject Area: Engineering
3. Region: Jaipur
4. Designation & Address of the Person, in whose name, Demand Draft/Bankers
Cheque of grant is to sent. (Head of Institution/Director/Registrar/ Comptroller/
Principal/Dean) (Tick the relevant):

PROF (DR) S. L. SURANA,


DIRECTOR (ACADEMICS),
SWAMI KESHVANAND INSTITUTE OF TECHNOLOGY, MANAGEMENT &
GRAMOTHAN,
RAMNAGRIA, JAGATPURA,
JAIPUR- 302025 (RAJ.) INDIA.

5. Name & Class/Year of the Students (indicate clearly the semester in case of
semester system)
S No NAME OF STUDENTS CLASS/ YEAR SEMESTER
th
01 Akshat Agarwal 4 VII
02 Asharam Kumawat 4th VII
th
03 Ayush Agarwal 4 VII
04 Aditya Nath Sant 4th VII

6. Whether belongs to SC/ST.(attach certified for Group Leader)


NO
7. Address of the Students (Institutional & Correspondence Address with E-mail
ID & Fax, Mobile No.)
S NAME ADDRESS E mail ID Mobile No
N
o
1 Akshat Plot No.79,Gali No.- akshatagarwal322001@gma 70142619
Agarwa 7,Ramnagaria,Jagatpura, il.com 86
l Jaipur
2 Ashara Radha Krishan ashukumawat13@gmail.com 97847714
m Hostel,Near SKIT 15
Kumaw Jagatpura ,Jaipur
at
3 Ayush Plot No.79,Gali No.- ayushjain3831@gmail.com 99299938
Agarwa 7,Ramnagaria,Jagatpura, 31
l Jaipur
4 Aditya 11,Shashi Vihar,Sector- Adityanath100@gmail.com 96726688
Nath 7,Pratap Nagar,Jaipur 61
Sant
8. Bank Account No. of one of the students of the Group.
S No NAME Details of Bank Account
1 Ayush Agarwal State bank of india-61226826005

9. a) Name & Designation of the Supervisor/Guide: Jitendra Sharma,


Lecturer
b) Institutional & Correspondence Address of the Guide with Telephone No:

S No NAME Institutional & Correspondence Telephone


address No
01 Ankit Vijayvargiya Ankit Vijayvargiya,Assistant Prof. 7877709590
Assisant prof. Deptt of Electrical Engg,
Swami Keshvanand Institute of
Technology, Management &
Gramothan,
Ramnagaria,
Jaipur (Raj.) PIN 302025

10. Whether certified from Plan Department (attach document).*: NA


E-mail ID & Fax, Mobile No.

Name & Signature of the Students:

S No NAME OF STUDENTS SIGNATURES OF STUDENTS


01 Ayush Agarwal

02 Asharam Kumawat

03 Aditya Nath Sant

04 Akshat Agarwal

Signature of Guide of the Project


(Ankit Vijayvargiya)

CERTIFICATE
It is hereby certified that
(i) Institution takes the responsibility of implementing the Student Project Within
stipulated period.
(ii) The Institution shall provide the Infrastructural & other facilities required for
the project.
(iii) The amount sanctioned by Department of Science & Technology, Rajasthan,
Jaipur shall be provided to
the concerned Student/Guide timely and funds be utilized for the purpose for
which it has been
sanctioned.

Date:
Place

Signature of the Head of Institution

Name and Designation with seal

The Bank Details of the Institution/College prescribe are mentioned as below :-


1. Name of the Bank :
2. A/C No. :
3. IFSC Code :
4. Mobile number of Guide Teacher : 7877709590
Signature of the Head of Institution

Name and Designation with seal


Form B
1. Title of the Project: Solar Based Vegetable Cart
2. Project Summary: First of all we will construct a cart which is fertilized by the freezing
system on the roof of the cart. This cart is solar penalized. This solar penals provide the
electric supply to the condenser used in the freezing system. With this smart technology
of solar electro-cart maintain the freshness of vegetables and enhance the smart
technology between the peoples.
3. Technical Details of the Project:
 Origin of the Proposal-
This basic idea of our project comes from the innovative and emerging technology in
electrical engineering aspects of study.

 Definition of the problem-


Equipments used in the project has higher failure rates due to their ageing and hence the technology
is being affected to the some extent which is the major drawback of our project.

 Objectives

The main objective of our project is to enhance the new and innovative technology to the
range of common people of rural areas.

 Work Plan :

o 1st Month- Firstly we will make a cart.


o 2ndMonth- This cart is solar penalized and installed with the refrigeration system.
o 3rd Month-After this we will set the whole setup for verify the project.
o 4th Month-We will complete our project.

 Methodology

 Organization of work element


 Time Schedule-The project is being completed in 4 months.

 Proposed Outcome/ findings –


 Enabling smart activation of customer;
 Enabling new products in market;
 Optimizing assets management and utilization through automation
 To enquire the smart technology in the market

 Detail of the Facility provided by the Institute:

Budget Estimate:

S.no Item Quantity Cost(in Rs)

1 Vegetable Cart 1 5000.00/-

2 Solar penal(310W) 1 28000.00/-

3 Battery 1 12000.00/-/

4 Freezing System 1 4000.00/-

Total 49000.00/-

You might also like