You are on page 1of 34

Back to Basics Duct Design.

Drafting and Successful


Downstream efficiency.

Presenter : Christopher Nyul– Queensland Senior Draftsperson


13th May 2013
Back to Basics Duct design

Presentation Agenda

• Manufacturing and Installation principals.


• BIM, co-ordination of services.
Back to Basics Duct design

Manufacturing and Installation principals.

• Parameters can be applied within the intelligent software.


• Project Design Guide (AS 4254).
• Testing.
• Pressure Class, Air Flow and System Type.
• Duct Profiles.
• Accessibility, Egress and maintenance.
• Schematics and Layouts.
• Flue Expansion.
• Hangers and Supports.
• Prefabrication.
.
Back to Basics Duct design

Deflection / Leakage Testing of duct.


Back to Basics Duct design

Deflection / Leakage Testing Rig.


Back to Basics Duct design

Deflection / Leakage Testing.

• Ascertain the amount of leakage and minimise, to reduce


operating costs.
• Improve manufacturing practices to reduce leakage.
• Limit the amount of deflection.
• Ensure that bracing and beading are sufficient.
Back to Basics Duct design

Resizing Ductwork.

• Pressure Class,
• Air Flow
• System Type.
Back to Basics Duct design

Duct Profiles

• Rectangular

• Round

• Oval
Duct Manufacturing Machinery Back to Basics Duct design
Back to Basics Duct design
Fitting Elimination
What We See. Back to Basics Duct design

Item Information. Pattern Development.

Nest Layout.
Product. Back to Basics Duct design
Back to Basics Duct design

TDF-35 TDF-35 Cap-End


Access Panel
Back to Basics Duct design

INS Step-in TDF-35


Loose Mezz Frame
Access, Egress and Maintenance Back to Basics Duct deign
Access, Egress and Maintenance Back to Basics Duct design
Access, Egress and Maintenance
Back to Basics Duct deign

What is wrong with this picture?


Back to Basics Duct deign

Fleshing out the Schematic.


Fleshing out the Schematic.
Back to Basics Duct design
Efficient hanging. Back to Basics Duct design
Prefabrication. Back to Basics Duct design
Prefabrication From the Drawing. Back to Basics Duct design
Back to Basics Duct design
Prefabrication To Site.
Flue Stack Prefabrication. Back to Basics Duct design
Flue Stack Prefabrication. Back to Basics Duct design
Back to Basics Duct design
Thermal Expansion, with Bellows.

∆L = LX α x ∆T
Change in length, Length of Duct,
Thermal Coefficient and Temp difference
Between outer and inner.
Back to Basics Duct design
Expansion without Bellows.
Back to Basics Duct Design

BIM, Co-ordination of services

The Coordination Process.


• Service Contractors provide their 3D drawings to A.E Smith.
• A.E Smith Import these services along with the Mechanical Into
Navisworks and carry out floor by floor Clash detection.
• The Clashes are then Reviewed and assigned.
• The Navisworks Model CW Clash detection Reports is then
provided back to the relevant parties for review and drawing
revisions are carried out.
• The Process will then begin again.
BIM 3D (Coordination) Workflow.
Back to Basics Duct Design

Drawing Revision

Drawing Revision
End Result.
Back to Basics Duct design
Clash Detection Report.
Back to Basics Duct Design
Revit is BIM ???.
Back to Basics Duct Design
THANK YOU
& Question Time

15th May 2013