Professional Documents
Culture Documents
Thick Bed
Saw Tooth Pulse
IPJ PULSE CHART AND CYCLES PER MIN
CYCLES STK LENGTH TOTAL STK LNTH TOTAL LNTH TRAV UP VELOC UP TIME DN VELOC DN TIME X
cyc/min mm (d1) mm m/min m/s % m/s %
100 10 20 2 0.05 75.0% 0.15 25.0%
v e lo c it y ( m )
le n g t h ( m m )
0.09
d1 15
0.07
10 0.05
0.03
5 0.01
t1 t2 -0.01
0 0.5 1 1.5
cm 0
0 0.005 0.01 0.015 0.02 time (sec)
time (min) dow n stk up stk
Typical ‘Cross Flow Jigs’ Sinusoidal Stroke
‘Inefficient time’
Low velocity
Ragging
Old 2.65 S.G. Ragging New 3.2 S.G. Ragging
Consistent cover / no
hang up in Bed
Blown/Pegged Beds
Water Balance
Positive Water Flow Through Bed
Hutch (dilution) Water Flow To Tail =
Hutch Water Addition – Water Flow From Con Line
Feed Up-Flow
m3/hr 120
m3/hr 18
Hutch Tails
m3/hr 138
m3/hr 50
Concentrate
m3/hr 32
Tails Flush ports (Diamond IPJ’s)
Hutch Tail
tph 9.4
m3/hr 20
m3/hr 28.3
Velocity m/s 2.8
50ø NB %solids w/w 33.2
Bibiani - Ghana
Ensure that
there is
suitable head/
feed to provide
pressure for
the concentrate
and tails
transport
Installing the IPJ – Rougher/Scavenger/Cleaner
ALL IPJ discharge piping should be free draining with a minimum 10° slope
Feed
Feed
Hutch Hutch
Jig Tailings
Jig Tailings
Jig Tailings
Rougher/Scavenger Rougher/Cleaner
Decreased Grade Increased Grade
Increased Recovery Decreased Recovery
Golden Rules
Pre-concentration
Cleaning
Coal
Typical Diamond Size/Yield Recovery Data
size 15 20 25 30
2mm 90-94 94-97 95-98 97-99
3mm 93-97 93-97 95-98 97-99
4mm 95-97 95-98 97-99 98-100
6mm 96-100 96-100 97-100 98-100
8mm 98-100 98-100 97-100 98-100
12mm 99-100 99-100 99-100 99-100
Pulse Rate
Stroke Length
Down Stroke Speed
Hutch Water Addition
Ragging S.G.
Air Release
Screen Size
Pulse Rate – GD6 Controller
External/ Internal Switch – toggles between the internal GD6
Potentiometer and the external PID controller
Pot – Increases the pulse rate using potentiometer
Power on – indicates power to the unit
Delay – the down stroke time
Solenoid on – indicates when the solenoid activates
Analogue
Output Pulse Output
PID
SOLENOID
PV CV
SP
GD6 Controller inside the IPJ Control Panel
Pulse Rate
‘Local’ Controller (Manual IPJ’s)
PV – Process Variable = No. of cycles that the IPJ is
doing at that moment
SP – Set Point = No of cycles set in the controller
- The controls used to alter the set point
Enter – used to lock in new readings to the set point
A/M – automatic/manual toggle (must be in automatic)
Proximity Switch
The proximity switch detects
when the ram should start
another cycle
The ram will then extend for
the time dictated by the
PID/GD6 controller
After this time the ram will
free fall until the proximity
switch detects the block (light
at rear flashes) and starts the
cycle again
Hydraulic Pump
The VSD drive controls the
speed of the motor. The motor
can run from 20-100Hz
The motor runs a small gear
pump that pumps oil into the
ram
The faster the pump runs the
more oil the ram receives over
a given time and the longer
the ram extends
Stroke Length
Variable Speed Drive - Potentiometer
The VSD is located within the control box and is controlled
using the potentiometer on the front of the control box
The potentiometer reading is from 1-10 and is scaled
between 20-100Hz
10 = 100Hz
0 = 20 Hz (minimum frequency)
Manual Systems
A ball valve used to control the water addition to
the hutch
The magnetic flow meter indicates the flow of water
in m3/hr
Automatic Systems
An actuated butterfly valve controls flow
according the flowmeter input
Hutch water can be set to control from
actual flow, or calculated ‘upflow’ through
jig