Professional Documents
Culture Documents
Track Standards
Manual -
Section 8:
Track Geometry
Synopsis
This section of the Track Standards
Manual sets down the minimum
requirements for design, inspection
and maintenance relating to track
geometry of the permanent way
forming part of Railtrack’s
infrastructure.
Submitted by
Contents
Section Description Page
Part A
Issue Record 2
Responsibilities and distribution 2
Implementation 2
Health and Safety Responsibilities 2
Supply 2
Part B
1 Purpose 3
2 Scope 3
3 Definitions 3
4 Principles 4
5 Requirements 5
6 Normal Limiting Values 6
7 Exceptional Design Values 7
8 Maximum Speed Assessment 8
9 Radius on S&C 8
10 Track Geometry Recording 9
Appendix
A Equations 12
References 14
RAILTRACK 1
Withdrawn Document
Uncontrolled When Printed
Railway Group Standard
GC/RT5017
Issue Two Track Standards Manual - Section 8:
Date December 1998
Page 2 of 14 Track Geometry
Part A
Issue Record
This Standard will be updated when necessary by distribution of a complete
replacement.
Responsibilities and
Distribution
This Standard shall be complied with by all persons who are responsible for the
design, installation, inspection and maintenance of the track geometry on
Railtrack controlled infrastructure *The Railway Group comprises Railtrack and
the duty holders of the Railway Safety Cases accepted by Railtrack
Implementation
The provisions in this Railway Group Standard are to be complied with from
6th February 1999, with the exception of Clauses 5.6 and 5.9 which shall be
February 2001 and Clause 5.13 which shall be February 2004.
Supply
Controlled and uncontrolled copies of this Standard may be obtained from the
Industry Safety Liaison Dept, Safety and Standards Directorate, Railtrack PLC,
Railtrack House DP01, Euston Square, London, NW1 2EE.
2 RAILTRACK
Withdrawn Document
Uncontrolled When Printed
Railway Group Standard
GC/RT5017
Track Standards Manual - Section 8: Issue Two
Track Geometry Date December 1998
Page 3 of 14
Part B
1 Purpose
The purpose of this Standard is to define the requirements for track geometry in
terms of the management of horizontal and vertical alignment, in connection with
curvature and permitted line speeds.
It sets out the minimum inspection frequencies and the minimum actions to be
taken upon discovery of non-conformance with track geometry standards.
2 Scope
The contents of this Standard apply to all running lines and sidings on Railtrack
controlled infrastructure.
3 Definitions
CIRCULAR CURVE
A curve of constant radius.
TRANSITION CURVE
A curve of varying curvature. It is normally provided between two Circular curves,
each of different radius, or between a Circular curve and a Straight.
COMPOUND CURVE
A curve which is formed from similar flexure curves of different radii, which may
be connected by Transition Curves.
REVERSE CURVE
A curve formed by two Circular Curves, which curve in opposite directions and
which may be connected by Transition Curves.
HORIZONTAL CURVE
A curve in the track used to join two alignments in plan.
REVERSE POINT
The point of infinite radius at which two curves of opposite flexure meet.
VERTICAL CURVE
A curve in the longitudinal profile of track used to join two gradients together.
CANT
The amount by which one running rail is raised above the other running rail;
measured at the centre of the rail head (It may be expressed as a difference in
height or in terms of an angle).
Cant is positive when the outer rail on a curve is raised above the inner rail
and is negative when the inner rail is raised above the outer rail.
Negative Cant may be unavoidable at S&C on a Canted main line where the
turnout is curving in the opposite direction (contra flexure) from the main line
or at the plain line immediately adjoining the turnout.
EQUILIBRIUM SPEED
The speed of a vehicle following a curved path is such that the resultant of the
weight of the vehicle and the effect of centrifugal force is perpendicular to the
plane of the rails.
EQUILIBRIUM CANT
The amount that it is necessary to raise one running rail above the level of the
other running rail to obtain Equilibrium at a nominated speed.
CANT DEFICIENCY
The difference between actual Cant and the theoretical Cant that would have to
be applied to maintain Equilibrium at a nominated speed (Cant deficiency is
expressed in the same terms as cant).
RAILTRACK 3
Withdrawn Document
Uncontrolled When Printed
Railway Group Standard
GC/RT5017
Issue Two Track Standards Manual - Section 8:
Date December 1998
Page 4 of 14 Track Geometry
PERMISSIBLE SPEED
The speed which may be permitted on a curve with associated transitions when
radius, Cant, Cant Deficiency, Cant gradient and rates of change of Cant and
Cant Deficiency have all been taken into consideration together with the
characteristics of the trains. When the Permissible Speed of the curve or part of
the curve is less than the route speed limit for the particular type of train it will be
necessary to impose a lower Permanent Speed Restriction at that location.
TRACK GRADIENT
The distance travelled horizontally for a rise of one unit (expressed as 1 in X,
where X is the distance travelled horizontally. (May be expressed in terms of an
angle or a percentage.)
CANT GRADIENT
The amount by which Cant is increased or decreased in a given length of track,
e.g. 1 in 1200 means that a Cant of 1mm is gained or lost in every 1200mm of
track.
TRACK TWIST
The variation in cross level over a given distance along the track. It has the same
value as Cant Gradient, except the term Track Twist is normally associated with
higher values which are considered to be faults.
4 Principles
4.1
The horizontal and vertical geometry shall be designed according to the normal
train operating speed.
4.2
The track geometry shall be measured and recorded at a periodicity based on the
expected deterioration of the track and the minimum requirements to prevent the
track deteriorating into a condition which may cause:
derailments
unacceptable clearances
a risk of injuries from uneven ride, etc.
4.3
Upon discovery of substandard track, corrective action shall be carried out within
timescales which are based on expected further deterioration and which will
prevent an unsafe condition occurring.
4.4
Where this Standard refers to ‘Railtrack’ this will have the meaning of the
Railtrack Line organisation at Zone level responsible for compliance with Railway
Group and Corporate Standards.
4 RAILTRACK
Withdrawn Document
Uncontrolled When Printed
Railway Group Standard
GC/RT5017
Track Standards Manual - Section 8: Issue Two
Track Geometry Date December 1998
Page 5 of 14
5 Requirements
5.1
On running lines, Horizontal Curves shall consist of one or more Circular Curves.
They must be connected to the adjacent curved or straight track by a Transition
Curve to meet the Rate of Change of Cant and / or Cant Deficiency requirements.
5.2
Cant shall be designed and maintained such that:
the lateral forces and variation in loading on both rails is minimised for the
expected traffic on the route, and
there is no risk of vehicles overturning when travelling at maximum speed or
when stationary.
5.3
Cant and alignment design affecting structural or passing clearances shall take
account of the requirements of GC/RT5204.
5.4
Cant shall increase or decrease in proportion to curvature over the whole length
of the Transition Curve between two Circular Curves or between a Circular Curve
and straight track and shall be specified in multiples of 5mm. It shall take into
account:
5.5
The Cant on each track of a double or multiple line shall be considered
separately.
5.6
The maximum Cant on sharp radius curves shall not be greater than shown in the
following table.
5.7
When switches and crossings are located on curved track, the Cant to be applied
on the through line shall not cause the maximum permitted value of negative
Cant to be exceeded on a turnout of contra flexure.
5.8
All new sidings, whether straight or curved shall, where reasonably practicable,
be laid without Cant and the Track Gradient of standing sidings shall not be
steeper than 1 in 500.
5.9
Horizontal Curves shall be designed to take account of the curving characteristics
of the vehicles likely to use the track but shall not be less than 120m radius on
passenger running lines.
The normal minimum radius on non-passenger running lines and sidings is 90m.
(70m with Railtrack permission)
Records shall be kept of all locations with curves below 90m radius.
RAILTRACK 5
Withdrawn Document
Uncontrolled When Printed
Railway Group Standard
GC/RT5017
Issue Two Track Standards Manual - Section 8:
Date December 1998
Page 6 of 14 Track Geometry
5.10
The minimum radius of each Curve meeting at a Reverse Point on a passenger
running line is 140m and for non-passenger lines and sidings is 120m. Abutting
Curves of opposite hands, where one curve is less than 160m radius, shall be
connected by straight track of length equal to or greater than the wheel base of
the longest vehicle likely to use the line, or transitions installed, to prevent
horizontal buffer locking. There are no extra requirements for Compound Curves.
5.11
The relative levels of adjacent tracks shall be designed to maintain adequate
ballast shoulders as required for stability.
5.12
The track shall be maintained such that twists worse than 1 in 200 are managed.
The timescales for the required actions where such faults occur are specified in
10.2.2.
5.13
Records of all Track Gradients and horizontal curves on running lines shall be
maintained. Details to be recorded shall include:
cants;
transition details;
radius;
maximum allowable speeds for various rolling stock types likely to use the
route.
6 Normal Limiting
Values
The Normal Limiting design values, which are compatible with the inspection and
maintenance requirements specified in Railway Group Standards, are as follows:
6.1
Cant: 150mm;
Cant within station platforms: 110mm;
Cant on fixed obtuse crossings: 110mm.
6.2
Negative Cant shall not be installed except on or adjacent to S&C where the
values are:
6.3
Cant Gradient: 1 in 400.
The following effects shall be taken into account when proposing to install cant
gradients approaching this value:
effect of top planing of crossing noses at the point of load transfer through
switches and crossings;
deflection on skew underbridges.
6 RAILTRACK
Withdrawn Document
Uncontrolled When Printed
Railway Group Standard
GC/RT5017
Track Standards Manual - Section 8: Issue Two
Track Geometry Date December 1998
Page 7 of 14
6.4
Swing nose crossings shall not be installed on a Cant gradient.
6.5
Rate of Change of Cant: 55mm/sec.
6.6
Cant Deficiency:
6.7
The Rate of Change of Cant Deficiency on plain line, on all inclined S&C and on
the through tracks of vertical S&C: 55mm/sec.
6.8
Vertical radii (concave and convex): 1 km
6.9
Track Gradient 1:40
7 Exceptional
Design Values
It shall be permissible to use exceptional design values provided that any
increase in risk is assessed and managed. Railtrack shall maintain records of the
assessments used.
7.1
Track Gradient : 1:25
7.2
Cant on plane line : 180mm;
Cant within station : 130mm.
7.3
Cant Deficiency on plain line jointed track may be up to 110mm for suitably
approved rolling stock only e.g. Class 15x “Sprinters”.
Cant Deficiency on plain line CWR for “Passenger” rolling stock (as defined in
GO/RT3000) provided that no S&C, catch points, adjustment switches, level
crossings or other features likely to contribute to lateral misalignment are situated
on the transition or curve: 150mm
RAILTRACK 7
Withdrawn Document
Uncontrolled When Printed
Railway Group Standard
GC/RT5017
Issue Two Track Standards Manual - Section 8:
Date December 1998
Page 8 of 14 Track Geometry
7.4
Rate of Change of Cant on plain line: 85mm/sec.
7.5
The Rate of Change of Cant Deficiency on plain line, on all inclined S&C and on
the through tracks of vertical S&C: 70mm/sec.
(The Rate of Change of Cant Deficiency elsewhere on vertical S&C remains the
same as in 6.7.)
7.6
Radius of vertical curves in passenger lines, (where there is at least 30m
constant gradient between reverse Vertical Curves and the maximum
acceleration rate specified in clause 6.8 is observed: 500m.
Radius of Vertical Curves in non - passenger running lines and sidings: 200m.
The ability of the rolling stock to transverse the Vertical Curves shall include
consideration of:
7.7
For trial or evaluation purposes it shall be permissible to exceed the requirements
specified in sections 5, 6, 7 and 8 where any necessary enhancements (based on
risk assessments) to the inspection, maintenance and other requirements
specified in Railway Group Standards have been approved by Railtrack and are
being adhered to.
8 Maximum Speed
Assessment
The Permissible Speed of trains on a curve of given radius and Cant shall take
into account the radius of the curve, applied Cant, Cant Deficiency, Cant Gradient
and rates of change of Cant and Cant Deficiency. The maximum speed equation
is specified in Appendix A. Maximum speeds shall be rounded to the nearest
multiple of 5 mph relative to the calculated maximum speed.
9 Radius on S&C
9.1 Switches
The theoretical Cant Deficiency at the toes of switches shall not exceed 125mm.
In order to assess the maximum permitted speed it is necessary to calculate the
radius at the switch toes. The radius shall be obtained by calculating the offset at
the toes based on a 12.2m chord centred about the switch toe. An equation is
given in Appendix A.
10 Track Geometry
Recording
10.1 Frequencies
Track geometry recording frequencies are based on the Track Category Matrix as
defined in the Track Standards Manual - Section 1: Basic Track Category Matrix
GC/RT5023.
8 RAILTRACK
Withdrawn Document
Uncontrolled When Printed
Railway Group Standard
GC/RT5017
Track Standards Manual - Section 8: Issue Two
Track Geometry Date December 1998
Page 9 of 14
150
140
Cat 1
100
SPEED
mph
50
Cat Cat 2
5 Cat 3
Cat Cat 4
6
0
0 10 20 30 40 50 60
10.1.1
The track geometry shall be recorded, using a Railtrack approved track geometry
recording vehicle, at intervals as specified in the following table or at a greater
frequency if the condition of the track is such that the recommended frequency is
insufficient to prevent an unsafe condition occurring.
10.1.2
Lines with a maximum speed of 20mph or less need not be recorded, unless
carrying dangerous goods, in which case the route shall be inspected by manual
methods approved by Railtrack or by a Railtrack approved track geometry
recording vehicle.
10.1.3
It is accepted that not all running loops, platform lines, station throats and
crossovers can be recorded at the required frequencies. It is therefore essential
that when a recording is made the results are examined closely and any sections
not recorded are noted. Increased inspections using manual measurements shall
be considered on such lengths of track.
RAILTRACK 9
Withdrawn Document
Uncontrolled When Printed
Railway Group Standard
GC/RT5017
Issue Two Track Standards Manual - Section 8:
Date December 1998
Page 10 of 14 Track Geometry
10.2 Recordings
10.2.1 Track Quality Measurement
The following shall be measured:
3m and 5m twists;
the vertical profile of the rails, filtering out wave lengths greater than 35
metres;
the alignment of the rails, filtering out wave lengths greater than 35 metres.
Where standard deviations are greater than those specified in the table,
appropriate action shall be taken to either improve the track geometry or the
linespeed must be reduced to a level where the standard deviation is below the
maximum permitted.
IRREGULARITIES ACTION
The stated actions are where the irregularities are occurring in track with no other
significant faults. Where there are other faults known, an assessment shall be
carried out, and where required, more stringent action taken.
10 RAILTRACK
Withdrawn Document
Uncontrolled When Printed
Railway Group Standard
GC/RT5017
Track Standards Manual - Section 8: Issue Two
Track Geometry Date December 1998
Page 11 of 14
The corrective action taken and date completed must be recorded. Records shall
be retained for 2 years for audit purposes.
10.3
Railtrack shall ensure that all reports of track condition are received by the
relevant infrastructure contractor in sufficient time for any remedial work to be
carried out in accordance with any required minimum actions.
RAILTRACK 11
Withdrawn Document
Uncontrolled When Printed
Railway Group Standard
GC/RT5017
Issue Two Track Standards Manual - Section 8:
Date December 1998
Page 12 of 14 Track Geometry
Appendix A
Equations
1. Permissible Speed
R( E D)
V
11.82
. V2
1182
ED
R
E = applied Cant (mm)
D = Cant Deficiency (mm)
2. Standard Deviation
1 m ( a1 a ) 2
where:
a = mean value a1 = sample value
m = total no. of values
C2
R
8V
where:
R = radius
C = chord (12.2 metres) central about the switch toe
V = versine
12 RAILTRACK
Withdrawn Document
Uncontrolled When Printed
Railway Group Standard
GC/RT5017
Track Standards Manual - Section 8: Issue Two
Track Geometry Date December 1998
Page 13 of 14
R R
Re m
Rm R
Where
Re = effective radius Rm = radius of main line
RT = radius of turnout curve
Rm R
Re
Rm R
Where
Re = effective radius Rm = radius of main line
RT = radius of turnout curve
V2
R=
7628
Where
R = radius in km and V = speed (kph)
RAILTRACK 13
Withdrawn Document
Uncontrolled When Printed
Railway Group Standard
GC/RT5017
Issue Two Track Standards Manual - Section 8:
Date December 1998
Page 14 of 14 Track Geometry
References
GC/RT5204 Structure Gauging and Clearances
14 RAILTRACK