MEASUREMENT BOOK

AGENCY - Any PROJECT DIRECTOR - Any

EarthWork Reinforcement
DATE
S.NO. Total Used
upto
Type TOTAL Type Dia (mm) weight on Weight
site (kg)

1 EXCAVATION STEEL 8

2 STEEL 10

3 FILLING STEEL 12

4 STEEL 16

5 DEMOLITION STEEL 20

6 STEEL 25

7 STEEL 32

0.00
SUREMENT BOOK

CONTRACTOR - Any

Formwork
ent Concrete BRICK WORK
(Shuttering)

Unused Total Total


Type Type TYPE TOTAL
Steel (m2) (m3)

SHUTTERING PCC BRICK m3

in sqr foot = 0 M20 Bricks 0

M25

0.00
EarthWork

S.NO. Date Detail Type Nos. Length Width

Excavation for
1 12/7/2017 west stair Wing Wall PCC Excavation 1 40.50 4.50
Excavation 2 9.16 4.50
Filling 1 35.39 11.26
west side
2 2nd Row of Column below level Excavation 10 1.50 1.50
Demolition
2 12/12/2016 Noth Side Near temple Stair Demolition 1 9.00 2.00
Demolition
Floor Demolition 1 23.50 3.00

North west and


west south
corner Demolition 2 9.50 4.50
Excavation old
3 12/14/2016 South Wing wall PCC Excavation 1 13.00 3.00
Total Total Total
Depth/He Excavatio Filling Demolitio Total Calculation
ight n (m3) (m3) n (m3)

2.00 364.50
2.50 206.10
Excavation (m3) 636.98
3.80 1514.27

0.35 7.88

1.50 27.00
Filling (m3)

2.50 176.25 1514.27

2.50 213.75 Demolition (m3)

1.50 58.50 417.00


Reinforcement
Length of Reinforcement Dia W
Dia of Cut Total
Bar Nos of Length Length
S. No Description Type
in Bars in in mtr
(mm) mtr
Date 8 10 12
8/15/2017 example wall 20 1 2.00 2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.94
of Reinforcement Dia Wise (in Mtr) Total Calculation
Total
Total used
Type used Weight Total On
16 20 25 32 Nos Dia Length (Kg) Site Unused
2
8 mm 0.00 0.00

10 mm 0.00 0.00

12 mm 0.00 0.00

16 mm 0.00 0.00

20 mm 2.00 4.94

25 mm 0.00 0.00

32 mm 0.00 0.00

Total Weight 4.94


SHUTTERING

Side in
S.NO. Date Detail Type Type Nos Length
Each
1 Example Column 5L 1 1 4 0.60
Net Total
(m2) = Ft2 =
4.80 51.64032
Height/ Total (m2)
Depth
2.00 4.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CONCRETE

S.NO. Date Detail Type Grade Nos. Length Width

1 Column D5 PCC 1 0.60 0.60


D5 M25 1 0.60 0.60
example
Total Calculation

Total
M25/M2 Total PCC
Height M25/M20 (m3) = 0.32
(m3)
0 (m3)

PCC (m3) =
0.90 0.32 0.32
0.90 0.32 Total 0.65
BRICK WORK
S.No. Description Type Nos Length Width Height Total (m3)
Total (m3)
1 Example Wall 2 30.15 0.95 0.27 15.47 Bricks =
0.00
0.00
0.00
0.00
15.47
7300.4
here I use 472 bricks in 1m3, you can change.