STARTER BARS

STAGGER SPLICING
COLUMN BARS
a
SECTION B-B
STIRRUPS
COLUMN MAIN BARS
GROUND BEAM
NATURAL GROUND LEVEL
B B
3" 3"
FOOTING REINFORCEMENT
STARTER BARS
Ldt 1'0" (min.)
6" 6"
LEVELLING COURSE ABOVE SOIL
(P.C.C. 1:3:6)
SECTION A-A
BAR DETAILS ALONG THIS LINE
2"
A A
B2
B1
TYPICAL FOOTING PLAN
1. ALL DIMENSIONS ARE IN FOOT-INCH
2. USE MIX-CON. (1:2:3)
SCHEDULE OF COLUMNS 3. READ THIS DRAWING ALONG WITH ALL STRUCTURAL & ARCHITECTURAL DRAWING.
SIZE
4. PROVIDE COVER TO REINFORCEMENT-
SR.NO TYPE OF COLUMN REINFORCEMENT
COLUMN (B X D) FOOTING - 50MM, COLUMN - 40MM, BEAM - 25MM,
4-12# SLAB - 2OMM.
9" MAIN BAR- 4-12#
9" X 9"
9"

1. C1 SQUARE STIRRUPS-- 6#@ 6"C/C


( 04.NO.) Ø6 @6" C/C SCHEDULE OF FOOTING
6-12# SR. TYPE OF SIZE OF EXCAVATION SIZE OF FOOTING DEPTH OF FOOTING
9" MAIN BAR- 6-12# JALI REINFORCEMENT
9" X 12" NO. FOOTING (B1xL1) (B2xL2) d D
RECTANGULAR STIRRUPS-- 6#@ 6"C/C 1. F1 5'0"x5'0" 4'0"x4'0" 6" 1'6" 10# @6"C/C ( BOTHWAYS)
2. C2

12"
( 15.NO.) Ø6 @6" C/C 2. F2 6'0"x6'0" 5'0"x5'0" 6" 2'0" 10# @6"C/C ( BOTHWAYS)