Full Pile length 23.50 m
Dia 0.65 m
Volume / Pile 7.79 m3
volume H L W No.
Total pile 7.79 16.00 124.71 m2
Pile cap 2.90 2.90 1.10 4.00 37.00 m3
Padestal 1.00 1.00 1.60 4.00 6.40 m3
CC padastal 2.90 2.90 0.08 4.00 2.52 m3
Total RCC 170.63 M3
27m 82M
Total RCC 107.28 170.63 277.91
Total RCC for All 555.8
√²
Input H L W No.
2.70 2.70 0.85 4.00
Full Pile length 19.00 m
Dia 0.55 m
Number of pile 16
Volume / Pile 4.51 m3
Total volume 72.19 m3
Pile cap volume 24.79 m3
Padestal volume 7.000 m3
CC padastal 1.951 m3
Total RCC 105.93 m3
Back filling
Equation
Fixed Formula
27M 12323.94
Upto Pile remaining
RCC (M3) 66.11 31.06
Stone 1983.3 931.8
Sand 1322.2 621.2
Cement 462.77 217.42
Steel 5209 3235
10mm 1405 336 335
12mm 86 71
16mm 3804 813 685
20mm 2000 1500
25mm 323 2591
4385
Total No. of Needed L of L of Dim. & Weight of Wastage Total Required Dim. & Weight Tower
no. of no. of L of
Work Description Dim No. of PC per Actual Wast total 10mm 12mm 16mm 20mm 25mm L of 10mm 12mm 16mm 20mm 25mm Type
Pc item Pc (M) PCs Bar Bar per bar Wast 0.617 0.888 1.58 2.47 3.85 Bars 0.617 0.888 1.58 2.47 3.85
Pile Work
Pile ( Top) 16 12 16 1 192 12 1 192 0.00 0 0 0 0 0 0 2304 0 0 3640 0 0 82M
Pile ( Btm) 16 12 16 1 10.31 192 1 192 1.69 324 0 0 513 0 0 2304 0 0 3640 0 0 82M
Spiral ( full) 10 137 16 1 1.577 2187 7 313 0.96 301 186 0 0 0 0 3756 2317 0 0 0 0 82M
Pile Cap
Top Steel 16 27 2 4 4.36 219 2 110 3.28 361 0 0 570 0 0 1320 0 0 2086 0 0 82M
Btm Steel 20 18 2 4 4.42 144 2 72 3.15 227 0 0 0 561 0 864 0 0 0 2134 0 82M
Side Bar 12 2 4 4 2.84 32 4 8 0.64 5 0 5 0 0 0 96 0 85 0 0 0 82M
Chimney
Main=2.71 25 16 4 1 2.78 64 4 16 0.88 14 0 0 0 0 54 192 0 0 0 0 739 82M
Square Tie 10 17.4 4 1 3.55 70 3 24 1.35 32 20 0 0 0 0 288 178 0 0 0 0 82M
Octagon Tie 10 18.1 4 4 3.05 289 3 97 2.84 276 170 0 0 0 0 1164 718 0 0 0 0 82M
Pile Work
Pile ( Top) 16 8 16 1 12 128 1 128 0.00 0 0 0 0 0 0 1536 0 0 2427 0 0 27M
Pile ( Btm) 16 8 16 1 6.81 128 1 128 5.19 664 0 0 1050 0 0 1536 0 0 2427 0 0 27M
Spiral ( full) 10 113 16 1 1.27 1813 9 202 0.62 124 77 0 0 0 0 2424 1496 0 0 0 0 27M
Pile Cap
Top Steel 16 18 2 4 3.61 144 3 49 1.18 58 0 0 92 0 0 588 0 0 929 0 0 27M
Btm Steel 16 18 2 4 3.57 144 3 49 1.28 63 0 0 99 0 0 588 0 0 929 0 0 27M
Side Bar 12 2 4 4 2.84 32 4 8 0.64 5 0 5 0 0 0 96 0 85 0 0 0 27M
Chimney
Main=2.695 20 84 1 1 1.00 84 12 7 0.00 0 0 0 0 0 0 84 0 0 0 207 0 27M
Square Tie 10 16.8 1 4 3.55 67 3 23 1.35 31 19 0 0 0 0 276 170 0 0 0 0 27M
Octagon Tie 10 16.8 2 4 2.28 135 5 27 0.63 17 10 0 0 0 0 324 200 0 0 0 0 27M
482 9 2323 561 54 5079 170 16078 2342 739
Total Wastage (kg) 3429 Total purchase (kg) 24408
2379 23359
L= Length
No.= Number
Bar= 12m Reinforcement
pc/bndl
10mm 10
16mm 3
20mm
Dia PC Weight
16 45 842.4 kk
16 110 2052
12 8 85
10 120 886 3865.4 kg
57.2 at BDT
221101