TESTING AND COMMISSIONING PRE CHECK LIST

CCTV SYSTEM

PROJECT TITLE ………….…………………………………………………………………….…………………………………………………………………….……………………………..


:
LOCATION : ………….………………………………………………………………………………………………………………………………………………………………………….
PROJECTE NGINEER : ………………………………………………………………… CONTACT NUMBER : ………………………………………………………………….
INSTALLER REP. : ………………………………………………………………… CONTACT NUMBER : ………………………………………………………………….
CLIENT REP. : ………………………………………………………………… CONTACT NUMBER : ………………………………………………………………….

SECTION 1: PRELIMINARY CHECKS- To be completed by Site Engineer

YES NO IF NO, THEN NEW DATE FOR COMPLETION (DD/MM/YY)


ALL EQUIPMENT ON SITE …………………………………………………………………
ALL EQUIPMENT INSTALLED …………………………………………………………………
LABELING AVAILABLE …………………………………………………………………

COMMENTS IF ANY: ………….…………………………………………….…………………………………………………………………………………………………………………………………………………

………….…………………………………………….…………………………………………………………………………………………………………………………………………………
………….…………………………………………….…………………………………………………………………………………………………………………………………………………

………………………………………………………… DATE: …………………………………………………………


COMMISSIONING ENGINEER'S SIGNATURE

SECTION 2: PRE-CHECKS FOR THE SYSTEM OPERATION- To be completed by the Commissioning Engineer

SL.
DESCRIPTION YES NO REMARKS
NO.
1 Ensure all the CAT6 Cable connected to the camera and switch Ethernet port

2 Ensure the power availability at all switch ends

3 Ensure the power availability at all camera ends

4 Ensure all the fiber links connected to the fiber switch and control room switch is available

5 Ensure the power availability in control room rack

6 Ensure connectivity between rack switch and workstation

7 Ensure connectivity between rack switch and server

8 Ensure the power availability at decoder end

CHECKED BY WITNESSED BY
COMPANY
ATECO CONTRACTOR CONSULTANT CLIENT
NAME
SIGNATURE
DATE