You are on page 1of 6

AL DHAFRA TRADING ENTERPRISE EST.

OCCUPATIONAL HEALTH, SAFETY MANAGEMENT


SYSTEM

Description of
Supply, Installation, Testing & Commissioning of IP CCTV System.
Task / Activity:

Project Name: Musaffah Gardens Building Works.

Site Address/ Location: MUSAFFAH, ABU DHABI.

Document Reference: N/A

Reference Number Attached


Associated Risk Assessment
N/A Yes No NO

Prepared By: Syed Ameeruddin

Position: Project Engineer Date: 20-01-2016

Client Approval:

Position: Date:

Key Plant and Tools Electric Cordless Screwdriver, Crimping tool, Cutter, knife, leveller, portable electric hand
Required: drill.

Doc. No. ATC-MS-CAM-R0- Method Statement Template Page 1 of 6


1115-1 UNCONTROLLED COPY WHEN PRINTED Date of Issue: 23/11/2014
Issue: 0
AL DHAFRA TRADING ENTERPRISE EST.
OCCUPATIONAL HEALTH, SAFETY MANAGEMENT
SYSTEM

Key Materials
Cameras, Cables
Required:

(i.e.: access platforms/winches/ladders etc)


Other Essential
Ladders
Equipment:

Specific Identified
Residual Hazards:
(or refer to the task N/A
specific risk
assessment(s))
(i.e.: Confined Spaces/Abrasive Wheels/Working at Height/Plant Operators etc)

Specific Staff N/A


Training
Requirements:

(If none, state none.)

Temporary Supports
and Props needed to Life line if needed or practicable
facilitate the works:

(i.e.: Ladders/MEWPS/Scaffold/Trestles/Step Ladder etc)


Method of Access
and Egress to the Ladder, Scissor Lift
work area:

Fall Protection (ie: Guard Rails/Toe Boards/Brick Guards/Safety Harnesses/Exclusion Zones etc)
Measures: Safety Harness, fall restrain
(Where work at height cannot
be eliminated - consider both
Personnel & Materials)
Hazardous (ie: Lubricants/Solvents/Flammable Materials/Refrigerants/Welding Gases etc)
Substances:
(Attach COSHH Assessments
and MSDS)

Very Toxic Harmful/ Corrosive Dangerous Oxidising Highly Explosive


Irritant for the flammable
environment

Applicable: No No No No No No No
(Detail any limits on the loadings applicable to temporary plant/equipment or fixed elements of the structure
where the work is taking place.)
SWL's: NA

Doc. No. ATC-MS-CAM-R0- Method Statement Template Page 2 of 6


1115-1 UNCONTROLLED COPY WHEN PRINTED Date of Issue: 23/11/2014
Issue: 0
AL DHAFRA TRADING ENTERPRISE EST.
OCCUPATIONAL HEALTH, SAFETY MANAGEMENT
SYSTEM

Required Personnel
Protective Equip.:

Safety Hard Hats Safety Hearing Eye


Boots Gloves Protection Protection

Emergency
Procedures:

Name of On-Site First Aider: Aijaz

First Aid Box Location: Vehicle

First Aid Facilities: Location of Nearest Hospital: [Life Line Hospital]

Syed Ameeruddin (Proj. Eng.) -0506156932


Other Information & Aijaz (HSE) -050-6158375
Comments: Mohd. Adnan (PM) -0506157714

1) All work will be undertaken by qualified competent persons with experience of the
type of work described above, and in all cases in full accordance with safety
procedures specified.
QUALITY
CONTROL 2) It is the responsibility of the supervisor to ensure prior to giving any personnel the
PROCEDURES: job of (Camera Installation) that they are fully aware of the hazards involved and
are competent to carry out the work safely.

3) The supervisor must ensure that this procedure is fully complied with.

Doc. No. ATC-MS-CAM-R0- Method Statement Template Page 3 of 6


1115-1 UNCONTROLLED COPY WHEN PRINTED Date of Issue: 23/11/2014
Issue: 0
AL DHAFRA TRADING ENTERPRISE EST.
OCCUPATIONAL HEALTH, SAFETY MANAGEMENT
SYSTEM

Testing:
Camera function, coverage & quality can be checked from the desktop client software,
select the camera & verify the picture quality.

TESTING &
COMMISSIONING: Commissioning:

1) Ensure all installation works are complete as per approved method statement
for installation of CCTV system.
2) Connect IP camera network port to the portable POE network switch from the
patch panel in respective communication room.
3) Set the IP address of the commissioning laptop to the required range.
4) Open the camera in web browser for configuring the video settings.
5) Adjust lens as per field of view.
6) Adjust focus as per the field of view.

Doc. No. ATC-MS-CAM-R0- Method Statement Template Page 4 of 6


1115-1 UNCONTROLLED COPY WHEN PRINTED Date of Issue: 23/11/2014
Issue: 0
AL DHAFRA TRADING ENTERPRISE EST.
OCCUPATIONAL HEALTH, SAFETY MANAGEMENT
SYSTEM

1. Arrange the materials such as cameras, cables & accessories to carry out the
installation works.
2. Arrange the PPE required to carry out the installation work safely.

3. Crimp the cable provided for the camera.

4. Mark the area where the camera needs to be installed as per the approved drawing.

5. Make the provision for the installation as required on the marked place as per the
drawing.

6. Fix the suitable mount if required for the installation for example: For poles use Pole
mount Adapter.

7. Install the camera on the fixed adapter and connect the cable into the camera.

8. Connect the power supply and power up the camera.


Sequence of
Operations: 9. Perform the testing & commissioning as mentioned in the above testing &
(Specifying methods of commissioning section.
working, tools, materials and
equipment utilised)
10. Clientele Engineer shall check the installations as per the approved inspection test plan.

11. Request for inspection shall be prepared by ATECO Engineer and shall be issued to
Client for further inspection with Client / Consultant.

12. Clientele Engineer shall co-ordinate with Client / Consultant and arrange for their
inspection.

Doc. No. ATC-MS-CAM-R0- Method Statement Template Page 5 of 6


1115-1 UNCONTROLLED COPY WHEN PRINTED Date of Issue: 23/11/2014
Issue: 0
AL DHAFRA TRADING ENTERPRISE EST.
OCCUPATIONAL HEALTH, SAFETY MANAGEMENT
SYSTEM

METHOD STATEMENT ACCEPTANCE FORM

TITLE CAMERA INSTALLATION METHOD STATEMENT

I HAVE READ AND UNDERSTOOD THE METHOD STATEMENT


FOR THE WORK ACTIVITIES ABOVE

NAME
DATE TRADE PRINT SIGNATURE

RESPONSIBLE ENGINEER / SUPERVISOR

Doc. No. ATC-MS-CAM-R0- Method Statement Template Page 6 of 6


1115-1 UNCONTROLLED COPY WHEN PRINTED Date of Issue: 23/11/2014
Issue: 0

You might also like