INSPECTION RESPONSIBILITY
QUALITY ASSIGNMENTS
ITEM PROJECT PHASE QUALITY
TASK / ACTIVITY PROCEDUR REMARKS
NO. & ACTIVITY CODE RECORD
E CNTRCTR
SAUDI
ARAMCO
RECEIVING
2.0
INSPECTION
Telecommunication Tower
Material Receiving 12-SAMSS-007 Fabrication of Structural
2.3
Visual Inspection
SAIC-T-5601 SAIC-T-5601 H W and Miscellaneous Steel
Self-Supporting Communication Tower
Telecommunication Tower
Material Receiving 12-SAMSS-007 Fabrication of Structural
2.4
Visual Inspection
SAIC-T-5602 SAIC-T-5602 H W and Miscellaneous Steel
Guyed Steel Communication Tower
Page 1 of 5
04/04/2018 20:16:31
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 7 COS 03/31/2013
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Communication Towers and Facilities (ISP/CO) SATIP-T-744-01 30-Apr-13 Telecommunications
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
QUALITY ASSIGNMENTS
ITEM PROJECT PHASE QUALITY
TASK / ACTIVITY PROCEDUR REMARKS
NO. & ACTIVITY CODE RECORD
E CNTRCTR
SAUDI
ARAMCO
3.0 INSTALLATION
Tower Installation
3.2
Visual Inspection
SAIC-T-5604 SAIC-T-5604 H W Approved tower installation/ erection procedure
Tower Painting & Coating See SATIP-H-100-01 Paint Application of liquid Coating
3.3 See Remarks
Visual Inspection Remarks System for Industrial facilities
Tower
See
3.4 Obstruction Lighting Installation See Remarks SATIP-P-123-01 Lighting
Remarks
Visual Inspection
Facility
See
3.6 Waveguide Bulkhead Installation See Remarks SATIP-T-492-01 Communication Systems
Remarks
Visual Inspection
Battery Room
See
3.7 Emergency Eyewash Installation See Remarks SATIP-B-069-01 Emergency Eyewash / Shower
Remarks
Visual Inspection
Page 2 of 5
04/04/2018 20:16:31
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 7 COS 03/31/2013
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Communication Towers and Facilities (ISP/CO) SATIP-T-744-01 30-Apr-13 Telecommunications
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
QUALITY ASSIGNMENTS
ITEM PROJECT PHASE QUALITY
TASK / ACTIVITY PROCEDUR REMARKS
NO. & ACTIVITY CODE RECORD
E CNTRCTR
SAUDI
ARAMCO
Facility
See SAIC-T-5605 HVAC Systems
3.8 HVAC Equipment Installation See Remarks
Remarks H W Also see SATIP-K-001-12 HVAC Systems
Visual Inspection
Security Fence
See See SATIP-M-006-01 Security Fencing
3.10 Installation See Remarks
Remarks
Visual Inspection
4.0 PRE-COMMISSIONING
Page 3 of 5
04/04/2018 20:16:31
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 7 COS 03/31/2013
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Communication Towers and Facilities (ISP/CO) SATIP-T-744-01 30-Apr-13 Telecommunications
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
QUALITY ASSIGNMENTS
ITEM PROJECT PHASE QUALITY
TASK / ACTIVITY PROCEDUR REMARKS
NO. & ACTIVITY CODE RECORD
E CNTRCTR
SAUDI
ARAMCO
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may
1
adjust the levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3
representative is not present.
Page 4 of 5
04/04/2018 20:16:31
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 7 COS 03/31/2013
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Communication Towers and Facilities (ISP/CO) SATIP-T-744-01 30-Apr-13 Telecommunications
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
QUALITY ASSIGNMENTS
ITEM PROJECT PHASE QUALITY
TASK / ACTIVITY PROCEDUR REMARKS
NO. & ACTIVITY CODE RECORD
E CNTRCTR
SAUDI
ARAMCO
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative
4
in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND
Page 5 of 5