You are on page 1of 2
Tabel DS.9. Potensi Energi Primer (Tenaga ‘Asumsi i No Proyek Penseattang | Jeaie 1 [Lasela Swasia PLEA 145) Potent 2 | Tambals ‘Swasta PLTA 22 Potensi 3 _| Bulelene PLN PLT 12 Potensi Total Potensi Tenaga Air 1682 Tabel D5.10. Potensi 1 | Lainea Unallacated PLIP 2x10, Reneans “Total Potenei Tenage Pamas Sumi 20 ‘Tubel DS.11. Potensi Energi Primer (Tenaga Hybrid) di Sulawesi Tenggara Amamsi . Kapasitas sat No Proyek Pe ag | om ‘ea Status 1_|Bombana Unallowated | LISHED 10 Rencane ‘Total Potens! Tenaga Hybrid 10, Tabel DS.13. Rincian Reacana Pembanguaan Pembangkit . _, | tokasi/Nama| Kap | Target No| sistem | Jenis e | iw | cob. | Status | Pengembang 1 | Kolaka PLTM_| Lapa 2 22_| 2018 | Konstruksi | PLN Kenda : 2 | sutbagset | eLru | ree 10 | 2018 | Konstruksi | PLN 2 [BaxBau | PLIMG | Bou Bau 30_| 2018 | Konstraksi [PLN 4 |Bombana |pura/Ma| MPP 10 | 2018 | Pengadaan | PLN Kolaka MPP Kolaka 5 | Kelaka | purajc | MPP E 5 | 2018 | Pengadaan | PLN 6 | Kotaka LIM | Lapai 1 2x2_| 2019 |Rencana | PLN 7_| Kotak PLTM_| Ricrita 250.5 | 2019 |Rencana | PLN & | Sulagsel | PLTA | Konawe 21 _|_2023 _[Rencana [PLN 9 [Sutbagsel | PLTA | Watunohu | 15,6 | 2024 |Rencana | PLN 10 | Salbagset | PLTU |Kendaris | ox50 | 2010 | Konstrakel | Swasta iifBarbau | PLTO | BauBau 2x15 | 2021/22 | Rencana | Swasta 12 [BauBau | PLTU |BauBou 2 | oxis | 2025/26[Rencana | Uncllocated 13[Bau-seu | put _| Ronei 0,8_| 2018 | Konstruksi | PLN Total 2616 Tabel D5.3, Pembangkit Tenaga Listrik Eksisting venis | Kapasitas] Daya | Beban No Sistem Jenis | Bahan | Terpasang| Mampul Puncak| Pemilik Bakar | (mw) | mew) | (cw) TBolated | PETU/PLTD || Batubara/ 1 Kendasi | Pero sna | poe 2242 | 1514 | 025 | pus Lambuya | PLTD BEM aa [asa | aaa | pow Kolaka | putp/purm|spu/air | 29,3 | 176 | 17.4 | PLN Raha | PLTD BEM 1g | 10.2 | 101 | pu Bau-Bau | pLTD/PLTm| sBu/air | 30,8 | 91,5 | 27,0 | PLN Wang | pirp BBM s7 | 48 | a6 | pw Wangi Lasusna |PTP/PET | ppuyair | 9.5, 60 | 70 | PLN Bombana| PLTD BBM Er 66 | 63 | PLN Ereke | PLTD BEM as | 19 | as | pow Total 339.4 | 245,1 | 168,8 Tabel DS.8. Proycksi Kebutuhan Tenaga Listrik Pertumbuhan | i | Beban asian | etanom” | Peiaaen | adoist | ROL | pansean (%) (Mw) 2018 6,31 922 1.017 169 506.178 2019 6,32 1.003. 1.105, 183 534.622 2020 6,15 1.080 | 1.169 196 363.736, 2021 712 1.170 1,288 212 594.080 2022 7,14 1.266 1.393 228 625.160 2023 7.13 1.366 | 1.502 245 656.923 2024 721 1.472] 1.615 262 689.420 2025 7.15 1562 | 1.709 276 "706.032 2026 774 1066 | 1.818 202 123.377 2097 7.76 1777_| 1.937 310 741.061 Pertumbuhan 7,00 7.6% 7.4% 7,096 43%

You might also like