Professional Documents
Culture Documents
NAME OF RESEARCHER:
E-MAIL:
Institute:
Circle as appropriate: Staff / PG Research Student / UG / Other
SUPERVISORS:
PROJECT SPECIFICATION PS.2 Issue 7 Page 1 of 4 Date Template Issued: 15 March 2016
[For example: Include Sample Type and Number of Samples, Drawing with
Measurement Positions, Measurement Parameters, Filters etc]
Training Requested:
Taking measurements: Yes / No
Measurements analysis: Yes / No
Self-Measure: Yes / No
Self-Analysis: Yes / No
Tick Comments
(Contact) Talysurf -120L
Talysurf - PGI 800
NP-Flex (Non-Contact)
Alicona Infinite Focus
CMM – Legex
CMM – Kemco
Balance (specify model)
Nikon Optical Microscope
Nikon Profile Projector
TalyRond
PROJECT SPECIFICATION PS.2 Issue 7 Page 2 of 4 Date Template Issued: 15 March 2016
TECHNICAL RESOURCES
SOURCE:
APPROVAL:
Date _____________________
Date _____________________
Date _____________________
PROJECT SPECIFICATION PS.2 Issue 7 Page 3 of 4 Date Template Issued: 15 March 2016
PROJECT SPECIFICATION PS.2 Issue 7 Page 4 of 4 Date Template Issued: 15 March 2016