You are on page 1of 4

METROLOGY PROJECT SPECIFICATION

& WORK REQUEST


PROJECT TITLE:

NAME OF RESEARCHER:
E-MAIL:
Institute:
Circle as appropriate: Staff / PG Research Student / UG / Other
SUPERVISORS:

FUNDING SOURCE /ACCOUNT NUMBER :

RATIONALE & AIM OF MEASUREMENT:

PROPOSED EQUIPMENT AND RATIONALE:

PROJECT SPECIFICATION PS.2 Issue 7 Page 1 of 4 Date Template Issued: 15 March 2016

Issued by: Dr Louise Jennings


METROLOGY PROJECT SPECIFICATION
& WORK REQUEST
PROPOSED METHODOLOGY AND RATIONALE:

[For example: Include Sample Type and Number of Samples, Drawing with
Measurement Positions, Measurement Parameters, Filters etc]

PERFORMING THE MEASUREMENTS AND ANALYSIS: (please circle)

Training Requested:
Taking measurements: Yes / No
Measurements analysis: Yes / No

Self-Measure: Yes / No

Self-Analysis: Yes / No

DETAILS OF WORK REQUESTED:


1. Proposed Equipment with rationale, i.e. Contact (Talysurf) or Non-
Contact (NP-Flex) Surface Measurement, please tick relevant box.

Tick Comments
(Contact) Talysurf -120L
Talysurf - PGI 800
NP-Flex (Non-Contact)
Alicona Infinite Focus
CMM – Legex
CMM – Kemco
Balance (specify model)
Nikon Optical Microscope
Nikon Profile Projector
TalyRond

PROJECT SPECIFICATION PS.2 Issue 7 Page 2 of 4 Date Template Issued: 15 March 2016

Issued by: Dr Louise Jennings


METROLOGY PROJECT SPECIFICATION
& WORK REQUEST

2. Results required (for surface analysis only), i.e. Profile (Area/Volume) Or


Surface Texture (Ra, Rsk), please tick relevant box.

Tick Comments (Area, Volume, Ra etc)


Profile
Surface Texture Analysis

PROJECT TIMEFRAME/REQUESTED COMPLETION DATE –

TO BE COMPLETED BY LABORATORY DIRECTOR:

TECHNICAL RESOURCES

SOURCE:

ESTIMATED RESOURCE NEEDS:

APPROVAL:

Researcher Name _________________ Signature__________________

Date _____________________

Supervisor _________ Signature__________________

Date _____________________

Laboratory Director ______________ Signature__________________

Date _____________________

PROJECT SPECIFICATION PS.2 Issue 7 Page 3 of 4 Date Template Issued: 15 March 2016

Issued by: Dr Louise Jennings


METROLOGY PROJECT SPECIFICATION
& WORK REQUEST
Measurements Technician _____________ Date Received___________

Measurements Technician_______________ Date Completed__________

PROJECT SPECIFICATION PS.2 Issue 7 Page 4 of 4 Date Template Issued: 15 March 2016

Issued by: Dr Louise Jennings

You might also like