As new technologies develop and become more cost effective and efficient, we firmly believe that renewable resources represent the future in energy generation, even if
traditional energies like coal and nuclear will not be entirely obsolete. P-Z-M GmbH is currently developing multiple Utility-scale solar energy facilities in Romania, becoming
the largest developer of photovoltaic energy facilities in Romania.
Located in South-Eastern Europe, Romania takes the 6th best place for solar energy in European Union. With over 200 sunny days per year, the Southern part of Romania has a
great potential at yearly solar irradiation of 1.650kWh/m2. The energy policy of Romania aims to achieve a significant growth of electricity production from renewable
resources so that Romania meets the compliance guidelines set by European Union. Due to legislative improvement, the Parliament has passed the Renewable Energy Law
139/2010 to further encourage investment of “green” projects. The Green Certificates (GC) scheme allows producers of electricity from solar resources to receive 6 Certificates
per MWh for 15 years, provided the project is connected to the grid by 2016.
Basically, a GC is a title document which attests that a quantity of electricity was produced using renewable energy sources.
The GC scheme is monitored by National Energy Regulatory Agency (ANRE) in an orderly fashion, as follows:
1. Each electricity SUPPLIER is required to purchase a certain number of GC according to mandatory quota imposed by law. The annual quota of GC purchases increases from
8.3% of annual turnover in 2010 to 20% in 2020. Between 2020-2030 the Ministry of Economy will further decide the quotas, but it will not below 20%. During the month of
December each year, ANRE publishes for each electricity SUPPLIER the annual quota of GC required to purchase for the next year. The electricity SUPPLIER that doesn’t meet
its mandatory annual quota of GC ownership pays a penalty fee of EUR110/GC.
2. For Renewable energy PRODUCERS, each provides Transelectrica a report with the actual amount of MWh fed into the electricity grid the previous month. Based on this
data, a photovoltaic station receives monthly from Transelectrica 6 GC for each 1MWh. Wind farms receive 2 GC, biomass facilities receive 2 GC, etc. The PRODUCER can sell
the GC freely on the OPCOM market or to any other interested party.
This document contains confidential or legally privileged information that is intended only for the INTENDED RECIPIENT. If you ARE the Intended recipient of this document, then any disclosure, copying, distribution, or reliance upon the
contents of this document is solely used at the discretion of P-Z-M GmbH. Thus any and all use of the contents of this document must be in accordance with P-Z-M GmbH agreed terms of use. If you are NOT the intended recipient,
you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this document is STRICTLY PROHIBITED. If you have received this document in error, please disregard and destroy immediately, so that P-Z-M GmbH
can insure its proper handling. Thank you.
During 2008-2025, the GC price may vary between EUR27/GC and EUR55/GC. The market is very liquid so far, due to a shortage of GC on the market and it’s trading flat at
EUR55/GC. Beyond 2025, the trading price will be set freely by the market price based on supply and demand, but it will not be below the average price traded during 2025.
The electricity is traded separately from the GC, therefore the revenue stream for electricity PRODUCERS from renewable resources is made up of income from selling both the
GC and the electricity on the open market.
Based on OPCOM (Romania’s electricity exchange) trading records during 2011, the price per Green Certificate is EUR55, which means a total income for solar generated
electricity for producers of at least EUR375/MWh.
P-Z-M GmbH has numerous photovoltaic projects under development, all being at various stages in receiving government permits and authorizations. It is estimated that
these projects will be “fully-permitted” by the end of 2012.
Note:
** Total investment includes the grid connection amount of EURϳϱ.000/MW (estimated), and an estimated cost of EURϮϮ0.000/MW.
This document contains confidential or legally privileged information that is intended only for the INTENDED RECIPIENT. If you ARE the Intended recipient of this document, then any disclosure, copying, distribution, or reliance upon the
contents of this document is solely used at the discretion of P-Z-M GmbH. Thus any and all use of the contents of this document must be in accordance with P-Z-M GmbH´s agreed terms of use. If you are NOT the intended recipient,
you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this document is STRICTLY PROHIBITED. If you have received this document in error, please disregard and destroy immediately, so that P-Z-M GmbH
can insure its proper handling. Thank you.
Site Locations
Map legend:
1. Rahman PV – Tulcea County
2. Castelu PV – Constanta County
3. Calafat PV – Dolj County
4. Ghizdaru PV – Giurgiu County
5. Izvoru PV – Giurgiu County
6. Jimbolia PV – Timis County
7. Mizil PV – Prahova County
8. Sahateni PV – Buzau County
9. Gradinile PV – Olt County
10. Dragalina PV – Calarasi County
11. Dumbrava 1 PV – Dambovita County
12. Dumbrava 2 PV – Dambovita County
13. Sprancenata PV – Olt County
14. Mozaceni PV – Arges County
15. Coteana PV – Olt County
16. Umbraresti PV – Galati County
Solar Map
This document contains confidential or legally privileged information that is intended only for the INTENDED RECIPIENT. If you ARE the Intended recipient of this document, then any disclosure, copying, distribution, or reliance upon the
contents of this document is solely used at the discretion of P-Z-M GmbH. Thus any and all use of the contents of this document must be in accordance with P-Z-M GmbH`s agreed terms of use. If you are NOT the intended recipient,
you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this document is STRICTLY PROHIBITED. If you have received this document in error, please disregard and destroy immediately, so that P-Z-M GmbH
can insure its proper handling. Thank you.
Project status
Project name
Land ownership Land Urbanism Environmental Grid Connection Grid Connection
Other Permits Building Permit
Acquisition Permit Approval Study Approval
Calafat 110 MW Private owner 2 WEEKS 1 MONTH 1 MONTH 3 MONTHS 1 MONTH 1 MONTH
This document contains confidential or legally privileged information that is intended only for the INTENDED RECIPIENT. If you ARE the Intended recipient of this document, then any disclosure, copying, distribution, or reliance upon the
contents of this document is solely used at the discretion of P-Z-M GmbH. Thus any and all use of the contents of this document must be in accordance with P-Z-M GmbH`s agreed terms of use. If you are NOT the intended recipient,
you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this document is STRICTLY PROHIBITED. If you have received this document in error, please disregard and destroy immediately, so that P-Z-M GmbH
can insure its proper handling. Thank you.
9.9 mw Rahman PV – TULCEA
“Rahman Solar Park 9.9 MW” is located in Dobrogea region of Romania, on the
perimeter of Rahman village,Tulcea County, on a plot land of 20 hectares, on a 25
year long-term concession contract with Casimcea Town Hall. Energy produced will
be fed into the national electricity grid through the ENEL 20kV OHL located on the
perimeter of the solar park.
This document contains confidential or legally privileged information that is intended only for the INTENDED RECIPIENT. If you ARE the Intended recipient of this document, then any disclosure, copying, distribution, or reliance upon the
contents of this document is solely used at the discretion of P-Z-M GmbH. Thus any and all use of the contents of this document must be in accordance with P-Z-M GmbH`s agreed terms of use. If you are NOT the intended recipient,
you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this document is STRICTLY PROHIBITED. If you have received this document in error, please disregard and destroy immediately, so that P-Z-M GmbH
can insure its proper handling. Thank you.
20 MW Castelu PV – CONSTANTA
34 HA
This document contains confidential or legally privileged information that is intended only for the INTENDED RECIPIENT. If you ARE the Intended recipient of this document, then any disclosure, copying, distribution, or reliance upon the
contents of this document is solely used at the discretion of P-Z-M GmbH. Thus any and all use of the contents of this document must be in accordance with P-Z-M GmbH`s agreed terms of use. If you are NOT the intended recipient,
you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this document is STRICTLY PROHIBITED. If you have received this document in error, please disregard and destroy immediately, so that P-Z-M GmbH
can insure its proper handling. Thank you.
110 MW Calafat PV – dolj County
This document contains confidential or legally privileged information that is intended only for the INTENDED RECIPIENT. If you ARE the Intended recipient of this document, then any disclosure, copying, distribution, or reliance upon the
contents of this document is solely used at the discretion of P-Z-M GmbH. Thus any and all use of the contents of this document must be in accordance with P-Z-M GmbH`s agreed terms of use. If you are NOT the intended recipient,
you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this document is STRICTLY PROHIBITED. If you have received this document in error, please disregard and destroy immediately, so that P-Z-M GmbH
can insure its proper handling. Thank you.
70 to 90 mw Ghizdaru PV – Giurgiu
This document contains confidential or legally privileged information that is intended only for the INTENDED RECIPIENT. If you ARE the Intended recipient of this document, then any disclosure, copying, distribution, or reliance upon the
contents of this document is solely used at the discretion of P-Z-M GmbH. Thus any and all use of the contents of this document must be in accordance with P-Z-M GmbH`s agreed terms of use. If you are NOT the intended recipient,
you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this document is STRICTLY PROHIBITED. If you have received this document in error, please disregard and destroy immediately, so that P-Z-M GmbH
can insure its proper handling. Thank you.
24 to 28 MW Izvoru PV – Giurgiu
“Izvoru Solar Park 25MW” is located in southern part of Romania, on the perimeter
of Izvoru village, Giurgiu County, on a plot land of 50 hectares, on a 25 year long-
term concession contract. Energy produced will be fed into the national electricity
grid through the Izvoru 110kV transformer station 2km away. Total capacity
installed could be between 24 MW to 28 MW depending on the technology used.
This document contains confidential or legally privileged information that is intended only for the INTENDED RECIPIENT. If you ARE the Intended recipient of this document, then any disclosure, copying, distribution, or reliance upon the
contents of this document is solely used at the discretion of P-Z-M GmbH. Thus any and all use of the contents of this document must be in accordance with P-Z-M GmbH`s agreed terms of use. If you are NOT the intended recipient,
you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this document is STRICTLY PROHIBITED. If you have received this document in error, please disregard and destroy immediately, so that P-Z-M GmbH
can insure its proper handling. Thank you.
50 mw Jimbolia PV – timis
“Jimbolia Solar Park 27MW + 23MW” is located in Western part of Romania, on the
perimeter of Jimbolia town, Timisoara County, on two parcels of 50 and 43 hectares,
respectively, on a 25 year long-term concession contract. Energy produced will be
fed into the national electricity grid through the 110kV Jimbolia transformer station
3km away.
This document contains confidential or legally privileged information that is intended only for the INTENDED RECIPIENT. If you ARE the Intended recipient of this document, then any disclosure, copying, distribution, or reliance upon the
contents of this document is solely used at the discretion of P-Z-M GmbH. Thus any and all use of the contents of this document must be in accordance with P-Z-M GmbH`s agreed terms of use. If you are NOT the intended recipient,
you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this document is STRICTLY PROHIBITED. If you have received this document in error, please disregard and destroy immediately, so that P-Z-M GmbH
can insure its proper handling. Thank you.
18 to 23 mw Mizil PV – prahova
“Mizil Solar Park 10MW + 11MW” is located in southern part of Romania, on the
perimeter of Mizil town, Prahova County, on two parcels of 20 and 21 hectares,
respectively, on a 25 year long-term concession contract. Energy produced will be
fed into the national electricity grid through the 110kV Mizil transformer station
4km away. Total capacity installed could be between 18 MW to 23 MW depending
on the technology used.
This document contains confidential or legally privileged information that is intended only for the INTENDED RECIPIENT. If you ARE the Intended recipient of this document, then any disclosure, copying, distribution, or reliance upon the
contents of this document is solely used at the discretion of P-Z-M GmbH. Thus any and all use of the contents of this document must be in accordance with P-Z-M GmbH`s agreed terms of use. If you are NOT the intended recipient,
you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this document is STRICTLY PROHIBITED. If you have received this document in error, please disregard and destroy immediately, so that P-Z-M GmbH
can insure its proper handling. Thank you.
49 to 65 mw Sahateni PV – buzau
This document contains confidential or legally privileged information that is intended only for the INTENDED RECIPIENT. If you ARE the Intended recipient of this document, then any disclosure, copying, distribution, or reliance upon the
contents of this document is solely used at the discretion of P-Z-M GmbH. Thus any and all use of the contents of this document must be in accordance with P-Z-M GmbH`s agreed terms of use. If you are NOT the intended recipient,
you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this document is STRICTLY PROHIBITED. If you have received this document in error, please disregard and destroy immediately, so that P-Z-M GmbH
can insure its proper handling. Thank you.
35 – 45 MW Gradinile PV – olt
This document contains confidential or legally privileged information that is intended only for the INTENDED RECIPIENT. If you ARE the Intended recipient of this document, then any disclosure, copying, distribution, or reliance upon the
contents of this document is solely used at the discretion of P-Z-M GmbH. Thus any and all use of the contents of this document must be in accordance with P-Z-M GmbH`s agreed terms of use. If you are NOT the intended recipient,
you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this document is STRICTLY PROHIBITED. If you have received this document in error, please disregard and destroy immediately, so that P-Z-M GmbH
can insure its proper handling. Thank you.
60 – 80 MW Dragalina PV calarasi
This document contains confidential or legally privileged information that is intended only for the INTENDED RECIPIENT. If you ARE the Intended recipient of this document, then any disclosure, copying, distribution, or reliance upon the
contents of this document is solely used at the discretion of P-Z-M GmbH. Thus any and all use of the contents of this document must be in accordance with P-Z-M GmbH`s agreed terms of use. If you are NOT the intended recipient,
you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this document is STRICTLY PROHIBITED. If you have received this document in error, please disregard and destroy immediately, so that P-Z-M GmbH
can insure its proper handling. Thank you.
60 – 75 MW dumbrava 1– dambovita
This document contains confidential or legally privileged information that is intended only for the INTENDED RECIPIENT. If you ARE the Intended recipient of this document, then any disclosure, copying, distribution, or reliance upon the
contents of this document is solely used at the discretion of P-Z-M GmbH. Thus any and all use of the contents of this document must be in accordance with P-Z-M GmbH`s agreed terms of use. If you are NOT the intended recipient,
you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this document is STRICTLY PROHIBITED. If you have received this document in error, please disregard and destroy immediately, so that P-Z-M GmbH
can insure its proper handling. Thank you.
100 mw dumbrava 2 – dambovita
This document contains confidential or legally privileged information that is intended only for the INTENDED RECIPIENT. If you ARE the Intended recipient of this document, then any disclosure, copying, distribution, or reliance upon the
contents of this document is solely used at the discretion of P-Z-M GmbH. Thus any and all use of the contents of this document must be in accordance with P-Z-M GmbH`s agreed terms of use. If you are NOT the intended recipient,
you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this document is STRICTLY PROHIBITED. If you have received this document in error, please disregard and destroy immediately, so that P-Z-M GmbH
can insure its proper handling. Thank you.
49 mw Sprancenata PV – olt
This document contains confidential or legally privileged information that is intended only for the INTENDED RECIPIENT. If you ARE the Intended recipient of this document, then any disclosure, copying, distribution, or reliance upon the
contents of this document is solely used at the discretion of P-Z-M GmbH. Thus any and all use of the contents of this document must be in accordance with P-Z-M GmbH`s agreed terms of use. If you are NOT the intended recipient,
you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this document is STRICTLY PROHIBITED. If you have received this document in error, please disregard and destroy immediately, so that P-Z-M GmbH
can insure its proper handling. Thank you.
30 – 40 mw Mozaceni PV – Arges
This document contains confidential or legally privileged information that is intended only for the INTENDED RECIPIENT. If you ARE the Intended recipient of this document, then any disclosure, copying, distribution, or reliance upon the
contents of this document is solely used at the discretion of P-Z-M GmbH. Thus any and all use of the contents of this document must be in accordance with P-Z-M GmbH`s agreed terms of use. If you are NOT the intended recipient,
you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this document is STRICTLY PROHIBITED. If you have received this document in error, please disregard and destroy immediately, so that P-Z-M GmbH
can insure its proper handling. Thank you.
35 – 45 mw coteana PV – olt
This document contains confidential or legally privileged information that is intended only for the INTENDED RECIPIENT. If you ARE the Intended recipient of this document, then any disclosure, copying, distribution, or reliance upon the
contents of this document is solely used at the discretion of P-Z-M GmbH. Thus any and all use of the contents of this document must be in accordance with P-Z-M GmbH`s agreed terms of use. If you are NOT the intended recipient,
you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this document is STRICTLY PROHIBITED. If you have received this document in error, please disregard and destroy immediately, so that P-Z-M GmbH
can insure its proper handling. Thank you.
21 MW umbraresti PV – galati
This document contains confidential or legally privileged information that is intended only for the INTENDED RECIPIENT. If you ARE the Intended recipient of this document, then any disclosure, copying, distribution, or reliance upon the
contents of this document is solely used at the discretion of P-Z-M GmbH. Thus any and all use of the contents of this document must be in accordance with P-Z-M GmbH`s agreed terms of use. If you are NOT the intended recipient,
you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this document is STRICTLY PROHIBITED. If you have received this document in error, please disregard and destroy immediately, so that P-Z-M GmbH
can insure its proper handling. Thank you.