ZAPATA PANTALLA

LARGO 5 5
ALTO 0.5 2.4
ANCHO 0.6 0.25
VOLUMEN 1.5 3

ZAPATA PANTALLA
LARGO 8.5 8.5
ALTO 0.5 2.4
ANCHO 0.6 0.25
VOLUMEN 2.55 5.1

% DESP
HORMIGON 13.365 15
CEMENTO 120.285 120
ACERO 1/2" 68 70
ACERO 3/8" 45 45
12.15 13.365 120.285

PRECIO UNIT PRECIO TOTAL


M3 33.5 502.5
BOLSAS 24 2880
VARILLAS 27 1890
VARILLAS 15 675
5947.50 3382.5
4.2 22

7.8 40

8.964 111.55734

1 mt 0.996
9 8.964
44 acero 3.5 m 3.5 124 62

80 long 8.7 15 30 45
15
124
30 30 107
137
estribos 8
145

diametro acero varillas precio x var p. total


3/8 115 15.00 1725.00
1/2 30 27.00 810.00
alambre 2535.00

1 0.56 5.04 198


1 0.994 8.946 112
2 mt 62

579.6
268.38 1000 3370
847.98 847.98 x

x 2857.6926
MURO saldo
tramo posicion diametro cant long. (mt) # varillas cant mt
0+00 -0+5.10 vert 3/8 40 3.25 20 20 2
0+00 - 0+8.70 vert 3/8 72 3.25 36 36 2
112 3.25 56 56 2

0+00 -0+5.10 long 3/8 32 4.5 16


0+00 - 0+8.70 long 3/8 32 9 32
48

EXCAVACION ACERO
ZAPATA # VECES # VECES X ZAP
ALTURA ANCHO LARGO ANCHO LARGO
Z-1 1.2 1.2 1.2 2.0 1.0 1.0 6.0
Z-2 1.2 1.2 1.2 2.0 1.0 1.0 2.0
Z-3 1.2 1.2 1.2 1.0 1.0 1.0 1.0

COLUMNA LONG CANTIDAD # VECES DIAMETRO # Var saldo


LONG. 9 6 5 1/2 30
ESTRIBOS 1.15 22 5 3/8 15 15

EXCAVACION VOLUMEN
# VECES
ALTURA ANCHO LARGO
SOLADO Z-1 0.1 1.2 1.2 5 0.72
ZAPATA 0.6 1.2 1.2 5 4.32
COLUMNA 2.95 0.35 0.25 5 1.29
MURO 1 BASE 0.3 0.5 4.2 1 0.63
MURO 1 PANTALLA 2.65 0.25 4.2 1 2.78
MURO 2 BASE 0.3 0.5 7.8 1 1.17
MURO 2 PANTALLA 2.65 0.25 7.8 1 5.17
16.08
CANT.

24
24
12
60

diametro cant. Var. precio x var p. total


1/2 30 27 810
3/8 122 15 1830
2640
0
0