Height of Room: 10.000 m, Light loss factor: 0.90 Values in Lux, Scale 1:627

Surface  [%] Eav [lx] Emin [lx] Emax [lx] u0


Workplane / 72 9.03 273 0.125
Floor 20 13 0.00 114 0.000
Ceiling 80 20 5.44 48 0.274
Walls (4) 50 26 7.66 429 /

Workplane:
Height: 0.760 m
Grid: 11 x 21 Points
Boundary Zone: 7.000 m
Illuminance Quotient (according to LG7): Walls / Working Plane: 0.350, Ceiling / Working Plane: 0.274.

Luminaire Parts List

No. Pieces Designation (Correction Factor)  (Luminaire) [lm]  (Lamps) [lm] P [W]
1 13 Ellipz Lighting Highbay Light HB2 60W (1.000) 7048 7048 67.0
2 18 Ellipz Lighting DL3 4in LED downlight (1.000) 794 796 8.7
3 7 Ellipz Lighting LED SL3 75W 5700K (1.000) 6666 6666 81.8
4 40 Ellipz LIGHTING TL2F 1200mm LED (1.000) 2059 2059 17.8
Total: 234959 Total: 234987 2311.3

Specific connected load: 0.57 W/m² = 0.78 W/m²/100 lx (Ground area: 4074.74 m²)