CE 521L CONSTRUCTION MANAGEMENT LAB.

CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City
Mga hindi pa nagagawa:

Autocadd - Lahat

BOQ: Lahat/ Update the Price


Metal works: Lahat

excavation - backfill, summary


LABOR COST -LAHAT
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

EXCAVATION

LAND CLEARING :

TOTAL AREA TO BE CLEARED = LENGTH X WIDTH


= 20.00 X 15.00 TOTAL VOL.
= 300.00 m² OF CONCRETE

C1
EXCAVATION :

A. ISOLATED FOOTINGS: * with allowance of 100mm on width/length


C2
TOTAL VOL. TO NUMBER OF
= LENGTH X WIDTH X DEPTH X
BE EXCAVATED PIECES TOTAL VOL.
= 1.30 X 1.30 X 1.50 X 11 OF CONCRETE
C1 /F1
= 27.885 m³
F1

= 1.60 X 1.60 X 1.50 X 7


C2/F2
= 26.880 m³
F2
B. WALL FOOTINGS: * with allowance of 100mm on width/length
TOTAL VOL. TO
= LENGTH X WIDTH X DEPTH
BE EXCAVATED
= 70.70 X 0.50 X 0.80 TOTAL VOL.
WF1 /WF2
= 28.280 m³ OF CONCRETE

WF1 /WF2
C. SEPTIC TANK: * with allowance of 100mm on width/length
TOTAL VOL. TO VOL. COVERED
= LENGTH X WIDTH X DEPTH
BE EXCAVATED BY CHB
= 4.90 X 1.50 X 1.65 INTERIOR
= 12.128 m³ WALL
VOL. COVERED
D. CATCH BASIN: * with allowance of 100mm on width/length BY CHB
TOTAL VOL. TO NUMBER OF EXTERIOR
= LENGTH X WIDTH X DEPTH X
BE EXCAVATED PIECES WALL
= 0.70 X 0.70 X 0.50 X 9
= 2.205 m³
VOL. COVERED
E. SEWER LINE: * with allowance of 100mm on width/length BY PIPE
TOTAL VOL. TO
= LENGTH X WIDTH X DEPTH
BE EXCAVATED
= 44.94 X 0.50 X 0.40
= 8.988 m³ TOTAL

AY '12-'13 | 2nd Semester


TOTAL VOLUME TO BE EXCAVATED = 106.366 m³
5 CE B

AY '12-'13 | 2nd Semester


CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 2
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

EXCAVATION

BACKFILL:

A. ISOLATED FOOTINGS:
TOTAL VOL. NUMBER OF
= LENGTH X WIDTH X DEPTH X
OF CONCRETE PIECES TOTAL ADDITION
= 0.20 X 0.40 X 1.15 X 11
C1
= 1.012 m³ TOTAL VOL. OF
BACKFILL
= 0.35 X 0.20 X 1.15 X 7 100.528
C2
= 0.5635 m³ say
TOTAL VOL. NUMBER OF
= LENGTH X WIDTH X THICKNESS X
OF CONCRETE PIECES TOTAL VOLUME O
= 1.20 X 1.20 X 0.35 X 11
F1
= 5.544 m³
TOTAL VOL
= 1.50 X 1.50 X 0.35 X 7 BASE COU
F2
= 5.5125 m³ 14.450

B. WALL FOOTINGS: * with allowance of 100mm on width/length


TOTAL VOL.
= LENGTH X WIDTH X THICKNESS
OF CONCRETE
= 70.70 X 0.40 X 0.20
WF1 /WF2
= 5.656 m³
VOL. COVERED STRENGTH :
= LENGTH X WIDTH X DEPTH
BY CHB CLASS "A" MIX:
INTERIOR = 13.00 X 0.10 X 0.60
WALL = 0.780 m³ CEMENT :
VOL. COVERED SAND :
= LENGTH X WIDTH X DEPTH
BY CHB GRAVEL :
EXTERIOR = 47.10 X 0.15 X 0.60
WALL = 4.239 m³

C. SEWER LINE: * with allowance of 100mm on width/length


VOL. COVERED
= LENGTH X WIDTH X THICKNESS
BY PIPE
= 44.94 X 0.40 X 0.40
= 7.190 m³

TOTAL VOLUME COVERED = 30.497 m³

AY '12-'13 | 2nd Semester


AY '12-'13 | 2nd Semester
CE 219L - CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 3

TWO STOREY RESIDENCE


Lot. 21 Blk. 1 Brgy. Fairview, Quezon City
CIVIL WORKS

ADDITIONAL BACKFILL:
TOTAL VOL. OF ADDITIONAL
= AREA X THICKNESS
BACKFILL
24.66 m³ = 109.6 m² X 0.225 m
TOTAL ADDITIONAL BACKFILL = 24.660 m³

AL VOL. OF TOTAL VOLUME OF TOTAL VOLUME TOTAL VOLUME OF


= - +
ACKFILL EXCAVATION COVERED ADDITIONAL BACKFILL
m³ = 106.366 - 30.497 + 24.660
100.528 x 1.3 = 130.68653 m³

TOTAL VOLUME OF BACKFILL = 130.687 m³

COMPACTED BASE COURSE


TOTAL VOL. OF
= AREA X THICKNESS X 1.30
BASE COURSE
14.450 m³ = 148.205 X 0.075 X 1.30

SLAB ON GRADE
TOTAL VOL. OF SLAB
= AREA X THICKNESS
ON GRADE
14.821 m³ = 148.205 m² X 0.10 m

STRENGTH : 3000 PSI


CLASS "A" MIX: 1:2:4 7 BAGS (50 kg) : 0.50 : 1.0
VOLUME
CEMENT : 14.821 X 7 BAGS = 103.744 BAGS
SAND : 14.821 X 0.500 = 7.410 m³
GRAVEL : 14.821 X 1.000 = 14.821 m³

SUMMARY
TOTAL VOLUME OF SOIL TO ORDER: 130.687 m³
CEMENT : 103.744 BAGS
SAND : 7.410 m³
GRAVEL : 14.821 m³

AY '12-'13 | 2nd Semester


AY '12-'13 | 2nd Semester
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

CONCRETE

FOOTINGS/ WALL FOOTINGS


NAME QUANTITY DEPTH WIDTH LENGTH VOLUME
C1 11 1.15 0.4 0.2 1.012
C2 7 1.15 0.2 0.35 0.564
F1 11 0.35 1.2 1.2 5.544
F2 7 0.35 1.5 1.5 5.513 =
WF1/WF2 3 0.2 0.4 70.7 16.968
TOTAL 29.600

SLABS
NAME THICKNESS AREA VOLUME
SLAB (GRADE) 0.100 148.205 14.821
S1 0.100 72.840 7.284
S2 0.100 41.910 4.191
CS 0.100 4.780 0.478
TOTAL 26.774
TOTAL (W/O COL) 26.557

COLUMN
NAMEHEIGHT LENGTH WIDTH VOLUME QUANTITY T. AREA TOTAL VOLUME
C1 3.2 0.2 0.4 0.256 8 0.64 2.048
6 0.2 0.4 0.48 3 0.24 1.44
C2 6 0.2 0.35 0.42 3 0.21 1.26
3.2 0.2 0.35 0.224 4 0.28 0.896
PC 3.2 0.2 0.4 0.256 10 0.8 2.56
TOTAL 2.17 8.204

BEAM
NAME WIDTH DEPTH TOTAL LENGTH VOLUME
B1 0.200 0.400 21.900 1.752
B2 0.200 0.400 39.000 3.120
B3 0.200 0.400 23.800 1.904
RB 0.200 0.300 99.300 5.958
TOTAL 12.734

MECHANICAL
NAME THICKNESS AREA VOLUME
SEPTIC TANK 0.150 31.260 4.689
CATCH BASIN 0.100 1.800 0.180
TOTAL 4.869

AY '12-'13 | 2nd Semester


AY '12-'13 | 2nd Semester
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 2
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

CONCRETE

STAIRS
NAME THICKNESS LENGTH WIDTH VOLUME STEPS TOTAL VOLUME
STR 1 0.187 1.2 0.3 0.067 13 0.875
G/F LANDING 0.187 1.2 0.9 0.202 1 0.202
MID LANDING 0.4 1.2 1.96 0.941 1 0.941
L. STRINGER 0.545 1.2 0.1 0.065 2 0.131
U. STRINGER 0.86 1.2 0.1 0.103 2 0.206
TOTAL 2.355

COMPUTATION FOR PROPORTIONALITY:

FOOTINGS/ WALL FOOTINGS

ELEMENTS (7 BAGS: 0.5 : 1.0) 50kg.


CLASS A MIX (1:2:4)
NAME STRENGTH (PSI) CLASS CEMENT (BAGS) SAND (m3) GRAVEL (m3)
C1 3000 A 7 0.506 1.012
C2 3000 A 4 0.282 0.564
F1 3000 A 39 2.772 5.544
F4 3000 A 39 2.756 5.513
WF1/WF2 3000 A 119 8.484 16.968
TOTAL 208 14.800 29.600

SLAB

ELEMENTS (7 BAGS: 0.5 : 1.0) 50kg.


CLASS A MIX (1:2:4)
NAME STRENGTH (PSI) CLASS CEMENT (BAGS) SAND (m3) GRAVEL (m3)
SLAB (GRADE) 3000 A 104 7.410 14.821
S1 3000 A 51 3.642 7.284
S2 3000 A 29 2.096 4.191
CS 3000 A 3 0.239 0.478
TOTAL (W/ COL) A 2 0.109 0.217
TOTAL A 186 13.278 26.557
4

AY '12-'13 | 2nd Semester


AY '12-'13 | 2nd Semester
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 3
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

CONCRETE

COLUMNS

ELEMENTS (7 BAGS: 0.5 : 1.0) 50kg.


CLASS A MIX (1:2:4)
NAME STRENGTH (PSI) CLASS CEMENT (BAGS) SAND (m3) GRAVEL (m3)
C1 3000 A 14 1.024 2.048
3000 A 10 0.720 1.440
C2 3000 A 9 0.630 1.260
3000 A 6 0.448 0.896
PC 3000 A 18 1.280 2.560
TOTAL 58 4.102 8.204

BEAM

ELEMENTS (7 BAGS: 0.5 : 1.0) 50kg.


CLASS A MIX (1:2:4)
NAME STRENGTH (PSI) CLASS CEMENT (BAGS) SAND (m3) GRAVEL (m3)
B1 3000 A 12 0.876 1.752
B2 3000 A 22 1.560 3.120
B3 3000 A 13 0.952 1.904
RB 3000 A 42 2.979 5.958
TOTAL 90 6.367 12.734

MECHANICAL

ELEMENTS (7 BAGS: 0.5 : 1.0) 50kg.


CLASS A MIX (1:2:4)
NAME STRENGTH (PSI) CLASS CEMENT (BAGS) SAND (m3) GRAVEL (m3)
SEPTIC TANK 3000 A 33 2.345 4.689
TOTAL 33 2.345 4.689

ELEMENTS (5 BAGS: 0.5 : 1.0) 50kg.


CLASS C MIX (1:3:6)
NAME STRENGTH (PSI) CLASS CEMENT (BAGS)SAND (m3) GRAVEL (m3)
CATCH BASIN 3000 A 1 0.090 0.180
TOTAL 1 0.090 0.180

AY '12-'13 | 2nd Semester


BEAMS

AY '12-'13 | 2nd Semester


CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 4
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

CONCRETE ESTIMATES

STAIRS

ELEMENTS (7 BAGS: 0.5 : 1.0) 50kg.


CLASS A MIX (1:2:4)
NAME STRENGTH (PSI) CLASS CEMENT (BAGS) SAND (m3) GRAVEL (m3)
STR 1 3000 A 6 0.438 0.875
G/F LANDING 3000 A 1 0.101 0.202
MID LANDING 3000 A 7 0.470 0.941
L. STRINGER 3000 A 1 0.065 0.131
U. STRINGER 3000 A 1 0.103 0.206
TOTAL 17 1.178 2.355

SUMMARY

TOTAL MATERIALS OF CONCRETE


ELEMENTS (7 BAGS: 0.5 : 1.0) 50kg. CLASS A MIX (1:2:4)
MEMBER
CEMENT (BAGS) SAND (m3) GRAVEL (m3)

COLUMN AND POST 58 4.102 8.204

FOOTING 208 14.800 29.600

BEAMS 90 6.367 12.734

SLABS 186 13.278 26.557


STAIR 17 1.178 2.355
MECHANICAL 34 2.435 4.869
OVERALL 593 42.159 84.319
5% ALLOWANCE 30 2.108 4.216
MAT. TO BE ORDER 623 44.267 88.535

AY '12-'13 | 2nd Semester


BEAMS

AY '12-'13 | 2nd Semester


CE 521L
CONSTR
UCTION
MANAG
EMENT
LAB.

AY '12-'13 | 2nd Semester


AY '12-'13 | 2nd Semester
AY '12-'13 | 2nd Semester
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

MASONRY
CONCRETE HOLLOW BLOCKS (CHB)

EXTERIOR WALL: GARAGE (AREA METHOD)

AREA OF WALL AREA OF NET WALL


NAME HEIGHT LENGTH INCLUDING # OF 6" C.H.B
COLUMNS COLUMNS AREA
EWG1 4.000 9.600 38.400 4.480 33.920 424

EXTERIOR WALL: G/F (AREA METHOD)

NAME HEIGHT LENGTH NET WALL AREA # OF 6" C.H.B

EG/F1 2.800 31.475 88.130 1102

INTERIOR WALL: G/F (AREA METHOD)

NAME HEIGHT LENGTH NET WALL AREA # OF 4" C.H.B

IG/F1 2.800 13.150 36.820 461

EXTERIOR WALL: 2/F (AREA METHOD)

NAME HEIGHT LENGTH NET WALL AREA # OF 6" C.H.B

E2/F1 2.500 37.720 94.300 1179

INTERIOR WALL: 2/F (AREA METHOD)

NAME HEIGHT LENGTH NET WALL AREA # OF 4" C.H.B

IG/F1 2.500 37.860 94.650 1184

EXTERIOR WALL: WF1/WF2 (AREA METHOD)

NAME HEIGHT LENGTH NET WALL AREA # OF 6" C.H.B

EWF1 0.600 48.100 28.860 361

INTERIOR WALL: WF1/WF2 (AREA METHOD)

NAME HEIGHT LENGTH NET WALL AREA # OF 4" C.H.B

AY '12-'13 | 2nd Semester


IWF1 0.600 13.000 7.800 98

AY '12-'13 | 2nd Semester


CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 2
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

MASONRY

CATCH BASIN (AREA METHOD)

NAME HEIGHT LENGTHNET WALL AREA # OF 4" C.H.B

CB1 0.500 10.800 5.400 68

SUMMARY

# OF 4" C.H.B 1811 pcs.


# OF 6" C.H.B 3066 pcs.

MORTAR AND PLASTER

EXTERIOR WALL: GARAGE (VOLUME METHOD)

CEMENT MORTAR FOR BLOCK LAYING


TYPE A MIX AREA FACTOR REQD.
CEMENT MORTAR 33.920 0.792 26.8646
SAND 33.920 0.0435 1.47552

CEMENT MORTAR FOR BLOCK LAYING


LENGTH HEIGHT NO. OF SIDES TOTAL AREA OF PLASTER TYPE A MIX AREA FACTOR REQD.
9.600 4.000 2 76.8 CEMENT MORTAR 76.800 0.792 60.8256
9.600 4.000 2 76.8 SAND 76.800 0.0435 3.3408

EXTERIOR WALL: G/F (VOLUME METHOD)

CEMENT MORTAR FOR BLOCK LAYING


TYPE A MIX AREA FACTOR REQD.
CEMENT MORTAR 88.130 0.792 69.799
SAND 88.130 0.0435 3.83366

CEMENT MORTAR FOR BLOCK LAYING


LENGTH HEIGHT NO. OF SIDES TOTAL AREA OF PLASTER TYPE A MIX AREA FACTOR REQD.
31.475 2.800 2 176.26 CEMENT MORTAR 176.260 0.792 139.598
31.475 2.800 2 176.26 SAND 176.260 0.0435 7.66731

AY '12-'13 | 2nd Semester


AY '12-'13 | 2nd Semester
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 3
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

MASONRY

INTERIOR WALL: G/F (AREA METHOD)

CEMENT MORTAR FOR BLOCK LAYING


TYPE A MIX AREA FACTOR REQD.
CEMENT MORTAR 36.820 0.792 29.1614
SAND 36.820 0.0435 1.60167

CEMENT MORTAR FOR BLOCK LAYING


LENGTH HEIGHT NO. OF SIDES TOTAL AREA OF PLASTER TYPE A MIX AREA FACTOR REQD.
13.150 2.800 2 73.64 CEMENT MORTAR 73.640 0.792 58.3229
13.150 2.800 2 73.64 SAND 73.640 0.0435 3.20334

EXTERIOR WALL: 2/F (AREA METHOD)

CEMENT MORTAR FOR BLOCK LAYING


TYPE A MIX AREA FACTOR REQD.
CEMENT MORTAR 94.300 0.792 74.6856
SAND 94.300 0.0435 4.10205

CEMENT MORTAR FOR BLOCK LAYING


LENGTH HEIGHT NO. OF SIDES TOTAL AREA OF PLASTER TYPE A MIX AREA FACTOR REQD.
37.720 2.500 2 188.6 CEMENT MORTAR 188.600 0.792 149.371
37.720 2.500 2 188.6 SAND 188.600 0.0435 8.2041

INTERIOR WALL: 2/F (AREA METHOD)

CEMENT MORTAR FOR BLOCK LAYING


TYPE A MIX AREA FACTOR REQD.
CEMENT MORTAR 94.650 0.792 74.9628
SAND 94.650 0.0435 4.11728

CEMENT MORTAR FOR BLOCK LAYING


LENGTH HEIGHT NO. OF SIDES TOTAL AREA OF PLASTER TYPE A MIX AREA FACTOR REQD.
37.860 2.500 2 189.3 CEMENT MORTAR 189.300 0.792 149.926
37.860 2.500 2 189.3 SAND 189.300 0.0435 8.23455

AY '12-'13 | 2nd Semester


AY '12-'13 | 2nd Semester
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 4
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

MASONRY

EXTERIOR WALL: WF1/WF2 (AREA METHOD)

CEMENT MORTAR FOR BLOCK LAYING


TYPE A MIX AREA FACTOR REQD.
CEMENT MORTAR 28.860 0.792 22.8571
SAND 28.860 0.0435 1.25541

CEMENT MORTAR FOR BLOCK LAYING


LENGTH HEIGHT NO. OF SIDES TOTAL AREA OF PLASTER TYPE A MIX AREA FACTOR REQD.
48.100 0.600 2 57.72 CEMENT MORTAR 57.720 0.792 45.7142
48.100 0.600 2 57.72 SAND 57.720 0.0435 2.51082

INTERIOR WALL: WF1/WF2 (AREA METHOD)

CEMENT MORTAR FOR BLOCK LAYING


TYPE A MIX AREA FACTOR REQD.
CEMENT MORTAR 7.800 0.792 6.1776
SAND 7.800 0.0435 0.3393

CEMENT MORTAR FOR BLOCK LAYING


LENGTH HEIGHT NO. OF SIDES TOTAL AREA OF PLASTER TYPE A MIX AREA FACTOR REQD.
13.000 0.600 2 15.6 CEMENT MORTAR 15.600 0.792 12.3552
13.000 0.600 2 15.6 SAND 15.600 0.0435 0.6786

CATCH BASIN (AREA METHOD)

CEMENT MORTAR FOR BLOCK LAYING


TYPE A MIX AREA FACTOR REQD.
CEMENT MORTAR 5.400 0.792 4.2768
SAND 5.400 0.0435 0.2349

CEMENT MORTAR FOR BLOCK LAYING


LENGTH HEIGHT NO. OF SIDES TOTAL AREA OF PLASTER TYPE A MIX AREA FACTOR REQD.
10.800 0.500 2 10.8 CEMENT MORTAR 10.800 0.792 8.5536
10.800 0.500 2 10.8 SAND 10.800 0.0435 0.4698

AY '12-'13 | 2nd Semester


AY '12-'13 | 2nd Semester
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 5
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

MASONRY

SUMMARY

SUMMARY OF MATERIALS NEEDED


WALLS NO. CHB'S (4") NO. CHB'S (6") CEMENT (BAGS) SAND (m3)
EXTERIOR WALL: GARAGE - 424 88 4.816
EXTERIOR WALL: G/F - 1102 210 11.501
INTERIOR WALL: G/F 461 - 88 4.805
EXTERIOR WALL: 2/F - 1179 225 12.306
INTERIOR WALL: 2/F 1184 - 225 12.352
EXTERIOR WALL: WF1/WF2 - 361 69 3.766
INTERIOR WALL: WF1/WF2 98 - 19 1.018
CATCH BASIN - 68 13 0.705
OVERALL 1743 3134 937 51.269
5% ALLOW 87 157 47 2.563
TO BE ORDER 1831 3291 984 53.833

AY '12-'13 | 2nd Semester


AY '12-'13 | 2nd Semester
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 6
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

REINFORCEMENT BARS

SLABS

NOTE: REINFORCEMENT BAR DIAMETER: 12mmØ


SPACING @ 6" (150 mm O.C.)
THICKNESS OF THE SLAB : 100mm
AREA METHOD

SLAB NAME WAY SLAB AREA BAR SPACING NO. OF REIN WEIGHT PCS. LENGTH BAR Ø
S1 TWO 19.89 150 64.066 346.320 65 6 12
TWO 15.99 150 51.504 277.056 52 6 12
TWO 22.44 150 72.279 388.944 73 6 12
TWO 14.58 150 46.962 250.416 47 6 12
S2 TWO 6.82 150 21.967 117.216 22 6 12
ONE 5.28 150 13.644 74.592 14 6 12

ONE 15.25 150 39.406 213.120 40 6 12


ONE 14.26 150 36.848 197.136 37 6 12
CS ONE 2 150 5.168 31.968 6 6 12
ONE 2.42 150 6.253 37.296 7 6 12
ONE 0.36 150 0.930 5.328 1 6 12

SLAB NAME WAY SLAB WEIGHT OF TIE WIRE(kg)


S1 TWO 6.962
TWO 5.597
TWO 7.854
TWO 5.103
S2 TWO 2.387
ONE 1.204
ONE 3.477
ONE 3.251
CS ONE 0.456
ONE 0.552
ONE 0.082

NOTE: REINFORCEMENT BAR DIAMETER: 10 mmØ


SPACING @ 16" (400 mm O.C.B.W)
THICKNESS OF THE SLAB : 100mm
AREA METHOD

SLAB NAME AREA BAR SPACING NO. OF REINFORCEMENT PCS. LENGTH BAR Ø WEIGHT
SLAB ON GRADE 148.21 100 177.852 178 6.0 10 658.636

AY '12-'13 | 2nd Semester


CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

ROOFING

ROOFING
GA # 26 Corr. or Rib type long span
2.5 Corrugations
30 cm end lapping

CORRUGATED G.I. SHEET (table 6-2)


No. of Roof Sheets = Length of Gutter/ effective width covering of one sheet
31 = 18.4 / 0.6

Length of Rafter: 8.50 m : 32" x 10 ft. GI. Sheet


Allowance for hipped type: 10 % : 62 x 0.1 = 7
No. of Sides No. of Sets No. of Pcs. TOTAL
2 3 31 193 pcs. 32" x 10 ft. GI. Sheet

RIVET (table 6-2 & 6-3)


No. of Sides No. of Sets No. of Pcs. No. of Rivet/sheet TOTAL
2 3 31 22 4092 pcs

TOTAL no. of RIVETS /180 = TOTAL Kg. of RIVETS


4092 pcs /180 = 22.73 kg.

G.I. WASHERS (table 6-3)


TOTAL no. of RIVETS X 2 = TOTAL No. of Washers
4092 pcs X 2 = 8184 pcs.

TOTAL no. of Washers /126 = TOTAL Kg. of Washers


8184 pcs /126 = 64.95 kg.

LEAD WASHERS (table 6-3)


TOTAL no. of RIVETS / 75 = TOTAL No. of Washers
4092 pcs / 75 = 54.56 pcs.

G.I. ANCHOR STRAP (table 6-4) : 1" X 10"


TOTAL no. of RIVETS / 342 = TOTAL
4092 pcs / 342 = 12 pcs. 36" x 8 ft.
TOTAL no. of RIVETS X No. of Nail/Strap = NO. OF WIRE NAIL TO FASTEN ANCHOR STRAP
4092 pcs X 3 pcs = 12276 pcs

TOTAL no. of Wire Nail / 695 = TOTAL Kg. of Washers


12276 pcs / 695 = 17.66 kg.
say 18 kg 4d CWN
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 2
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

ROOFING

GUTTER (table 6-6)


No. of Gutter pcs = Length of Gutter/ effective length of one gutter
26 = 60.6 / 2.35
Pcs fr. 1 GI Sheet = Width of Plain GI Sht. / width of gutter
1.50 = 90 / 60
No. of pcs of GI Sheet = No. of Gutter pcs / Pcs fr. 1 GI Sheet
18 = 26 / 1.50

RIDGE ROLL & HIPPED ROLL (table 6-6)


No. of pcs. Of ROLL = Length of Roll/ effective length of roll
39 = 85.5 / 2.2
Pcs fr. 1 GI Sheet = Width of Plain GI Sht. / width of roll
3.00 = 90 / 30
No. of pcs of GI Sheet = No. of pcs. Of ROLL / Pcs fr. 1 GI Sheet
13 = 39 / 3.00

FASCIA BOARD : 1" X 12"


AREA = Length X Width
18.18 m² = 60.6 X 0.30
No. of fascia board = area / 2.88
6.31 = 18.18 / 2.88
say 7 pcs. 1.2m x 2.4m x 25mm

WOOD BLOCK : 2" X 2"


Length = Length
60.6 m² = 198.83 ft.
b x d x L / 12 = bd. Ft.
2 x 2 x 198.83 / 12 = 66.276 bd.ft. 2"x2"

CEILING EAVES
AREA = Length X Width
60.60 m² = 60.6 X 1.00
No. of PLYWOOD = area / 2.88
21.04 = 60.60 / 2.88
say 22 pcs. 1.2m x 2.4m x 6mm
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

ROOFING

SUMMARY

32" x 10 ft. corr/rib. GI. Sheet 193 pcs.


G.I. Rivets 23 kilos
G.I. Washers 65 kilos
Lead Washers 55 kilos
36" x 8 ft. Plain GI. Sheet 43 pcs.
4d CWN 18 kilos
1.2m x 2.4m x 25mm fascia board 7 pcs.
2" x 2" lumber 67 bd.ft.
1.2m x 2.4m x 6mm plywood 22 pcs.
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

PAINTING WORKS

ROOF PAINT
AREA OF COVERAGE NO. OF NO. OF TOTAL NO. OF
TOTAL AREA PER GALLON GALLON COATINGS GALLONS
55 15 4 2 8

CEILING PAINT
NO. OF GALLON
AREA OF COVERAGE NO. OF GALLON (TOPCOAT) NO. OF GALLON
TOTAL AREA PER GALLON (PRIMER) (THINNER)
304.87 15 21 21 6

COLUMN PAINT
NO. OF GALLON
AREA OF COVERAGE NO. OF GALLON (TOPCOAT) NO. OF GALLON
TOTAL AREA PER GALLON (PRIMER) (NEUTRALIZER)
111.44 15 8 8 4

EXTERIOR PAINT
NO. OF GALLON
AREA OF COVERAGE NO. OF GALLON (TOPCOAT) NO. OF GALLON
TOTAL AREA PER GALLON (PRIMER) (NEUTRALIZER)
216.35 15 15 15 6

INTERIOR PAINT
NO. OF GALLON
AREA OF COVERAGE NO. OF GALLON (TOPCOAT) NO. OF GALLON
TOTAL AREA PER GALLON (PRIMER) (NEUTRALIZER)
223.56 15 15 15 6

SUMMARY

Acrylic Roof Shield Paint 8 gal.


Wood Primer 21 gal.
Quick Dry Enamel Paint 21 gal.
Paint Thinner 6 gal.
Acrylic Semi-Gloss Latex Paint 8 gal.
Acrylic Latex Paint 15 gal.
Acrylic Gloss Latex Paint 15 gal.
Acrylic Latex Surface Primer 38 gal.
Neutralizer 16 gal.
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

TRUSS

TRUSS MEMBER SCHEDULE


TC & BC 2L - 2" X 2" X 3/16"
KING POST 2L - 2" X 2" X 3/16"
VM & DM L - 2" X 2" X 1/4"

LENGTH OF MEMBERS:
TC BC KING POST VM DM
HT1 9.170 7.568 2.300 6.895 9.428
HT2 6.760 5.000 2.177 4.090 5.800
HT3 5.390 4.032 1.000 2.062 3.680
HT4 4.880 3.580 0.910 1.890 3.240
HT5 4.670 3.290 0.950 1.526 2.700
HT6 3.920 2.500 0.800 2.000 2.900
HT7 5.050 3.680 0.980 1.941 3.444
HT8 4.180 2.778 0.850 2.260 3.093
TRUSS 17.020 13.500 2.200 11.700 19.300

SUMMARY

TC, BC & KING POST 2L - 2" X 2" X 3/16" X 13.50 m = 2 pcs.


2L - 2" X 2" X 3/16" X 12.50 m = 5 pcs.
2L - 2" X 2" X 3/16" X 9.00 m = 2 pcs.
2L - 2" X 2" X 3/16" X 6.00 m = 2 pcs.
VM & DM L - 2" X 2" X 1/4" X 12.50 m = 3 pcs.
L - 2" X 2" X 1/4" X 10.00 m = 3 pcs.
L - 2" X 2" X 1/4" X 9.00 m = 1 pcs.
L - 2" X 2" X 1/4" X 6.00 m = 2 pcs.
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 2
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

PURLIN & SAGROD

PURLIN MEMBER SCHEDULE L - 2" X 4" X 1/8"


TOTAL LENGTH 348.85 m

SUMMARY

No. of STEELBARS L - 2" X 4" X 1/8" X 12.50 m = 13 pcs.


L - 2" X 4" X 1/8" X 12.00 m = 3 pcs.
L - 2" X 4" X 1/8" X 9.00 m = 6 pcs.
L - 2" X 4" X 1/8" X 7.50 m = 10 pcs.
L - 2" X 4" X 1/8" X 6.00 m = 5 pcs.

SAGROD 12mm Φ
TOTAL LENGTH 41.30 m

SUMMARY
No. of STEELBARS 12mm Φ X 6.00 m = 7 pcs.
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 3
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

REBARS
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

DOORS & WINDOWS

SCHEDULE OF DOORS :
D1 Solid Wooden Panel Door with 2" x 4" door jamb
1.6m length
2.1m height
D2 Solid Wooden Panel Door with 2" x 4" door jamb
0.8m length
2.1m height
D3 Solid Wooden Panel Door with 2" x 4" door jamb
0.7m length
2.1m height
D4 Glass Aluminum Sliding Door with 2" x 4" door jamb
1.6m length
2.1m height

SCHEDULE OF WINDOWS :
W1 Glass Aluminum Sliding Window
2.4m length
1.8m height
W2 Glass Aluminum Sliding Window
1.6m length
1.8m height
W3 Glass Aluminum Sliding Window
0.6m length
0.6m height
W4 Glass Aluminum Sliding Window
1.5m length
0.6m height
W5 Glass Aluminum Sliding Window
2.4m length
1.2m height
P1 Glass Fixed Panel
2.4m length
2.4m height

SUMARY (NO. OF SETS)


D1 D2 D3 D4 W1 W2 W3 W4 W5 P1
G/F 1 1 3 1 3 1 3 0 1 1
2F 0 4 4 0 6 1 2 1 0 1
TOTAL 1 5 7 1 9 2 5 1 1 2
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

DOORS & WINDOWS


CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

DOORS & WINDOWS


CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 2
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

FORMWORKS

NAME SETS LENGTH WIDTH DEPTH PERIMETER AREA # PLYWOOD BOARD (TABLE 5-1)
RB 2 5.8 0.200 0.300 0.900 10.440 4 100.240
2 4.2 0.200 0.300 0.900 7.560 3 75.180
3 3.7 0.200 0.300 0.900 9.990 4 100.240
3 3.6 0.200 0.300 0.900 9.720 4 100.240
2 3.8 0.200 0.300 0.900 6.840 3 75.180
1 5.2 0.200 0.300 0.900 4.680 2 50.120
1 4.1 0.200 0.300 0.900 3.690 2 50.120
1 1.4 0.200 0.300 0.900 1.260 1 25.060
1 3.2 0.200 0.300 0.900 2.880 1 25.060
1 6.8 0.200 0.300 0.900 6.120 3 75.180
1 1.9 0.200 0.300 0.900 1.710 1 25.060
1 4.7 0.200 0.300 0.900 4.230 2 50.120
1 1.8 0.200 0.300 0.900 1.620 1 25.060
1 2.3 0.200 0.300 0.900 2.070 1 25.060
1 1.5 0.200 0.300 0.900 1.350 1 25.060
1 2.1 0.200 0.300 0.900 1.890 1 25.060
using 1/4" x 4' x 8' plywood form and 2" x 2" lumber TOTAL 76 1904.560

STAIRS

NAME THICK LENGTH WIDTH No. of STEPS AREA # PLYWOOD BOARD (TABLE 5-1)

STR 1 0.187 1.2 0.3 13 4.68 2 50.120


G/F LANDING 0.187 1.2 0.9 1 1.08 1 25.060
MID LANDING 0.4 1.2 1.96 1 2.352 1 25.060
L. STRINGER 0.545 1.2 0.1 1 0.654 1 25.060
U. STRINGER 0.86 1.2 0.1 1 1.032 1 25.060
using 1/4" x 4' x 8' plywood form and 2" x 2" lumber TOTAL 6 150.360

SEPTIC TANK

NAME T. PERIMETER DEPTH AREA # PLYWOOD BOARD


SEPTIC TANK 4.200 1.500 6.300 3 75.180
using 1/4" x 4' x 8' plywood form and 2" x 2" lumber TOTAL 3 75.180
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

SCAFFOLDINGS

BEAMS

FOR B1, B2 AND B3


TOTAL LENGTH 84.7 m
VERTICAL SUPPORT 508.2 bd.ft. use 2"x3"
HORIZONTAL SUPPORT 398.09 bd.ft. use 2"x2"

FOR RB
TOTAL LENGTH 99.3 m
VERTICAL SUPPORT 595.8 bd.ft. use 2"x3"
HORIZONTAL SUPPORT 466.71 bd.ft. use 2"x2"

COLUMNS / POSTS

NAME LENGTH SETS TOTAL LENGTH H. SUPPORT V.SUPPORT D. SUPPORT


GARAGE 3.200 4 12.800 89.600 268.800 149.760
POST
G/F 3.200 14 44.800 313.600 940.800 524.160
COLUMNS
2/F 2.800 16 44.800 313.600 940.800 524.160
COLUMNS
use 2"x3" use 2"x2" use 2"x2"

SLAB

FOR SUSPENDED SLAB


TOTAL AREA 118.41 m
BOARD FT. , per sq. m 1077.531 bd.ft. use 2"x3"

FOR SLAB ON GRADE


TOTAL AREA 9.99 m
BOARD FT. , per sq. m 60.939 bd.ft. use 2"x2"

SUMMARY

USE 2"x2" LUMBER 4274.219 bd.ft.


USE 2"x3" LUMBER 2898.331 bd.ft.
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

TILE WORKS

SCHEDULE OF TILES
WALL TILES : AREA PER TILE
20 cm x 40cm glazed tiles kitchen 0.08 m²
20 cm x 40cm glazed tiles T&B 0.08 m²
FLOOR TILES:
30cm x 30cm glazed tiles kitchen 0.09 m²
20cm x 20cm unglazed tiles T&B 0.04 m²
40cm x 40cm glazed tiles remaining floors 0.16 m²

G/F WALL
(HEIGHT x LENGTH) - AREA OF WINDOW/D = NET AREA
T &B 1 : 2.1 m x 10 m - 0.36 m² = 20.640 m²
T &B 2 : 2.1 m x 7.05 m - 0.36 m² = 14.445 m²
KITCHEN : 2.1 m x 9.40 m - 2.88 m² = 16.860 m²
REMAINING FLOOR: 0m x 0m - 0 = 0 m²
WALL AREA / TILE AREA = NUMBER OF TILES
T &B 1 : 20.64 / 0.08 = 258 pcs. 20 cm x 40cm glazed
T &B 2 : 14.445 / 0.08 = 180.56 pcs. 20 cm x 40cm glazed
KITCHEN : 16.860 / 0.08 = 210.75 pcs. 20 cm x 40cm glazed
REMAINING FLOOR: 0 / 0 = 0 pcs. no need for tiles
G/F FLOOR
FLOOR AREA / TILE AREA = NUMBER OF TILES
T &B 1 : 6.80 m² / 0.04 = 170 pcs. 20cm x 20cm unglazed
T &B 2 : 0.90 m² / 0.04 = 22.50 pcs. 20cm x 20cm unglazed
KITCHEN : 16.34 m² / 0.09 = 181.56 pcs. 30cm x 30cm glazed
REMAINING FLOOR: 80.00 m² / 0.16 = 500.00 pcs. 40cm x 40cm glazed
G/F TOTAL AREAS
WALL AREA + FLOOR AREA = TOTAL AREA
T &B 1 : 20.640 + 6.800 m² = 27.440 m²
T &B 2 : 14.445 + 0.900 m² = 15.345 m²
KITCHEN : 16.860 + 16.340 m² = 33.200 m²
REMAINING FLOOR: 0 + 80.000 m² = 80.000 m²
G/F TILE ADHESIVES
TOTAL AREA X 0.086 = TOTAL BAGS OF CEMENT MORTAR
T &B 1 : 27.440 X 0.086 = 2.36 bags
T &B 2 : 15.345 X 0.086 = 1.32 bags
KITCHEN : 33.200 X 0.086 = 2.86 bags
REMAINING FLOOR: 80.000 X 0.086 = 6.88 bags
TOTAL AREA X 0.50 = TOTAL BAGS OF CEMENT MORTAR
T &B 1 : 27.440 X 0.50 = 13.72 kg.
T &B 2 : 15.345 X 0.50 = 7.67 kg.
KITCHEN : 33.200 X 0.50 = 16.60 kg.

AY '12-'13 | 2nd Semester


REMAINING FLOOR: 80.000 X 0.50 = 40.00 kg.

AY '12-'13 | 2nd Semester


CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 2
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

TILE WORKS

2/F WALL
(HEIGHT x LENGTH) - AREA OF WINDOW/DOO = NET AREA
T &B 1 : 2.1 m x 11.95 m - 1.26 m² = 23.835 m²
T &B 2 : 2.1 m x 7.10 m - 0.36 m² = 14.550 m²
REMAINING FLOOR: 0m x 0m - 0 = 0 m²

WALL AREA / TILE AREA = NUMBER OF TILES


T &B 1 : 23.835 / 0.08 = 297.94 pcs. 20 cm x 40cmglazed
T &B 2 : 14.550 / 0.08 = 181.88 pcs. 20 cm x 40cmglazed
REMAINING FLOOR: 0 / 0.08 = 0 pcs. no need for tiles

2/F FLOOR
FLOOR AREA / TILE AREA = NUMBER OF TILES
T &B 1 : 9.845 m² / 0.04 = 246.13 pcs. 20cm x 20cm unglazed
T &B 2 : 4.800 m² / 0.04 = 120.00 pcs. 20cm x 20cm unglazed
REMAINING FLOOR: 92.45 m² / 0.16 = 577.81 pcs. 40cm x 40cm glazed

2/F TOTAL AREAS


WALL AREA + FLOOR AREA = TOTAL AREA
T &B 1 : 23.835 + 9.845 m² = 33.680 m²
T &B 2 : 14.550 + 4.800 m² = 19.350 m²
REMAINING FLOOR: 0 + 92.450 m² = 92.450 m²

2/F TILE ADHESIVES


TOTAL AREA X 0.086 = TOTAL BAGS OF CEMENT MORTAR
T &B 1 : 33.680 X 0.086 = 2.90 bags
T &B 2 : 19.350 X 0.086 = 1.66 bags
REMAINING FLOOR: 92.450 X 0.086 = 7.95 bags

TOTAL AREA X 0.50 = TOTAL BAGS OF CEMENT MORTAR


T &B 1 : 33.680 X 0.50 = 16.84 kg.
T &B 2 : 19.350 X 0.50 = 9.675 kg.
REMAINING FLOOR: 92.450 X 0.50 = 46.23 kg.

SUMMARY
WALL TILES : 20 cm x 40cm glazed tiles kitchen 211 pcs.
20 cm x 40cm glazed tiles T&B 919 pcs.
FLOOR TILES:30cm x 30cm glazed tiles kitchen 182 pcs.
20cm x 20cm unglazed tiles T&B 559 pcs.
40cm x 40cm glazed tiles remaining floors 1078 pcs.
CEMENT 26 bags
WHITE CEMENT 150.733 kg say 160

AY '12-'13 | 2nd Semester


kg

AY '12-'13 | 2nd Semester


4.15

AY '12-'13 | 2nd Semester


CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

CEILING JOIST & CEILING BOARD

Ceiling Board : 1.2m x 2.4m x 6mm


Ceiling Joist : 2" x 2"
Ceiling Joist Spacing : 14 x 40 cm

CEILING JOIST
AMOUNT OF CEILING JOIST = AREA OF CEILING X 6.379
G/F CEILING
126.88 bd. Ft. 2" x 2" = 19.89 m² X 6.379
102.00 bd. Ft. 2" x 2" = 15.99 m² X 6.379
143.14 bd. Ft. 2" x 2" = 22.44 m² X 6.379
93.01 bd. Ft. 2" x 2" = 14.58 m² X 6.379
43.50 bd. Ft. 2" x 2" = 6.82 m² X 6.379
33.68 bd. Ft. 2" x 2" = 5.28 m² X 6.379
97.28 bd. Ft. 2" x 2" = 15.25 m² X 6.379
92.88 bd. Ft. 2" x 2" = 14.56 m² X 6.379
12.76 bd. Ft. 2" x 2" = 2.00 m² X 6.379
15.44 bd. Ft. 2" x 2" = 2.42 m² X 6.379
2.30 bd. Ft. 2" x 2" = 0.36 m² X 6.379
2/F CEILING
77.76 bd. Ft. 2" x 2" = 12.19 m² X 6.379
85.10 bd. Ft. 2" x 2" = 13.34 m² X 6.379
81.08 bd. Ft. 2" x 2" = 12.71 m² X 6.379
110.23 bd. Ft. 2" x 2" = 17.28 m² X 6.379
33.94 bd. Ft. 2" x 2" = 5.32 m² X 6.379
87.26 bd. Ft. 2" x 2" = 13.68 m² X 6.379
196.60 bd. Ft. 2" x 2" = 30.82 m² X 6.379
123.75 bd. Ft. 2" x 2" = 19.40 m² X 6.379

CEILING BOARD
AMOUNT OF CEILING BOARD = AREA OF CEILING / 2.88
G/F CEILING
6.91 bd. Ft. 2" x 2" = 19.89 m² / 2.88 7 pc/s. 1.20m x 2.4m x 6mm
5.55 bd. Ft. 2" x 2" = 15.99 m² / 2.88 6 pc/s. 1.20m x 2.4m x 6mm
7.79 bd. Ft. 2" x 2" = 22.44 m² / 2.88 8 pc/s. 1.20m x 2.4m x 6mm
5.06 bd. Ft. 2" x 2" = 14.58 m² / 2.88 6 pc/s. 1.20m x 2.4m x 6mm
2.37 bd. Ft. 2" x 2" = 6.82 m² / 2.88 3 pc/s. 1.20m x 2.4m x 6mm
1.83 bd. Ft. 2" x 2" = 5.28 m² / 2.88 2 pc/s. 1.20m x 2.4m x 6mm
5.30 bd. Ft. 2" x 2" = 15.25 m² / 2.88 6 pc/s. 1.20m x 2.4m x 6mm
5.06 bd. Ft. 2" x 2" = 14.56 m² / 2.88 6 pc/s. 1.20m x 2.4m x 6mm
0.69 bd. Ft. 2" x 2" = 2.00 m² / 2.88 1 pc/s. 1.20m x 2.4m x 6mm
0.84 bd. Ft. 2" x 2" = 2.42 m² / 2.88 1 pc/s. 1.20m x 2.4m x 6mm
0.13 bd. Ft. 2" x 2" = 0.36 m² / 2.88

AY '12-'13 | 2nd Semester


AY '12-'13 | 2nd Semester
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

CEILING JOIST & CEILING BOARD

2/F CEILING
4.23 bd. Ft. 2" x 2" = 12.19 m² / 2.88 5 pc/s. 1.20m x 2.4m x 6mm
4.63 bd. Ft. 2" x 2" = 13.34 m² / 2.88 5 pc/s. 1.20m x 2.4m x 6mm
4.41 bd. Ft. 2" x 2" = 12.71 m² / 2.88 5 pc/s. 1.20m x 2.4m x 6mm
6.00 bd. Ft. 2" x 2" = 17.28 m² / 2.88 6 pc/s. 1.20m x 2.4m x 6mm
1.85 bd. Ft. 2" x 2" = 5.32 m² / 2.88 2 pc/s. 1.20m x 2.4m x 6mm
4.75 bd. Ft. 2" x 2" = 13.68 m² / 2.88 5 pc/s. 1.20m x 2.4m x 6mm
10.70 bd. Ft. 2" x 2" = 30.82 m² / 2.88 11 pc/s. 1.20m x 2.4m x 6mm
6.74 bd. Ft. 2" x 2" = 19.40 m² / 2.88 7 pc/s. 1.20m x 2.4m x 6mm

SUMMARY
2" X 2" LUMBER 1558.58 bd. Ft.
1.20m x 2.4m x 6mm PLYWOOD 92 pcs.

AY '12-'13 | 2nd Semester


AY '12-'13 | 2nd Semester
CE
521L
CONST
RUCTI
ON
MANA
GEME
NT
LAB.

AY '12-'13 | 2nd Semester


CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

NAILS

AREA OF CEILING

G/F CEILING 2/F CEILING


19.89 m 2
12.19 m2
15.99 m2 13.34 m2
22.44 m2 12.71 m2
14.58 m2 17.28 m2
6.82 m2 5.32 m2
5.28 m2 13.68 m2
15.25 m2 30.82 m2
14.56 m2 19.4 m2
2 m2
2.42 m2
0.36 m2

NOTE: AMOUNT OF NAILS FOR CEILING JOIST = AREA OF CEILING X 0.055

G/F CEILING JOIST

19.89 X 0.055 = 1.09 kg 8d finishing nail


15.99 X 0.055 = 0.88 kg 8d finishing nail
22.44 X 0.055 = 1.23 kg 8d finishing nail
14.58 X 0.055 = 0.80 kg 8d finishing nail
6.52 X 0.055 = 0.36 kg 8d finishing nail
5.28 X 0.055 = 0.29 kg 8d finishing nail
15.25 X 0.055 = 0.84 kg 8d finishing nail
14.56 X 0.055 = 0.80 kg 8d finishing nail
2.00 X 0.055 = 0.11 kg 8d finishing nail
2.42 X 0.055 = 0.13 kg 8d finishing nail
0.36 X 0.055 = 0.02 kg 8d finishing nail

2/F CEILING JOIST

12.19 X 0.055 = 0.67 kg 8d finishing nail


13.34 X 0.055 = 0.73 kg 8d finishing nail
12.71 X 0.055 = 0.70 kg 8d finishing nail
17.28 X 0.055 = 0.95 kg 8d finishing nail
5.32 X 0.055 = 0.29 kg 8d finishing nail
13.68 X 0.055 = 0.75 kg 8d finishing nail
30.82 X 0.055 = 1.70 kg 8d finishing nail
19.40 X 0.055 = 1.07 kg 8d finishing nail
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 2
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

NAILS

TOTAL = 13.42 kg 8d finishing nail


TO BE ORDER = 14 kg 8d finishing nail

NAILS : PLYWOOD BOARD

NOTE: AMOUNT OF NAILS FOR PLYWOOD SHEET = SHEET X 0.055

FORMWORKS: 1.2m X 2.4m X 6mm plywood


63 pcs. for Column & Post
46 pcs. for Slabs
76 pcs. for Beams
9 pcs. for Stairs and Miscellaneous

63 X 0.055 = 3.465 kg 2d finishing nail


46 X 0.055 = 2.53 kg 2d finishing nail
76 X 0.055 = 4.18 kg 2d finishing nail
9 X 0.055 = 0.495 kg 2d finishing nail

CEILING EAVES & BOARD: 1.2m X 2.4m X 6mm plywood


22 pcs. for Ceiling Eaves
92 pcs. for Ceiling Board

22 X 0.055 = 1.21 kg 2d finishing nail


92 X 0.055 = 5.06 kg 2d finishing nail

TOTAL = 16.94 kg
TO BE ORDER = 17 kg 2d finishing nail

NOTE: AMOUNT OF NAILS FOR SIDING FASCIA BOARD = AREA X 0.06

1" x 12" Fascia board


Area = 18.18m2

18.18 X 0.06 = 1.09 kg


TO BE ORDER = 2.00 kg 6d casing brad
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 3
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

CEILING JOIST AND CEILING BOARD

NAILS : SCAFFOLDINGS

NOTE: AMOUNT OF NAILS FOR SCAFFOLDING = LENGTH X 0.73

GARAGE POST 4 SETS


3.2 X 0.73 X 4 = 9.344 kg 20d CWN

G/F COLUMNS 14 SETS


3.2 X 0.73 X 14 = 32.704 kg 20d CWN

2/F COLUMNS 16 SETS


2.8 X 0.73 X 16 = 32.704 kg 20d CWN

B1, B2, & B3


84.7 X 0.73 X 1 = 61.831 kg 20d CWN

RB
99.3 X 0.73 X 1 = 72.489 kg 20d CWN

TOTAL = 209.07 kg
TO BE ORDER = 210 kg 20d CWN

SUMMARY: 14 kg. finishing nail


17 kg. finishing nail
2 kg. casing brad
210 kg. 20d CWN

SUMMARY

14 kg 8d finishing nail
17 kg 2d finishing nail
2 kg 6d casing brad
210 kg. 20d CWN
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

PLUMBING/SANITARY

SUMMARY

SEWER LINE - 100mmdia. PVC pipe 105 m say 35 pcs. of 3m


WATER LINE - 25mmdia. CWL PVC 81 m say 27 pcs. of 3m
WATER METER 1 pcs.
GATE VALVE 1 pcs.
CHECK VALVE 1 pcs.
LAVATORY 3 pcs.
FLOOR CLEAN OUT 4 pcs.
FLOOR DRAIN 4 pcs.
CATCH BASIN 9 pcs.
SHOWER 4 pcs.
KITCHEN SINK 1 pcs.
WATER CLOSET 4 pcs.
FAUCET 8 pcs.
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

ELECTRICAL

SUMMARY

FLOURESCENT LIGHT SOCKET 4 pcs.


CIRCULAR LIGHTING SOCKET 10 pcs.
INCANDESCENT BULB SOCKET 9 pcs.
FLOURESCENT LIGHT 4 pcs.
CIRCULAR LIGHTING 10 pcs.
INCANDESCENT BULB 9 pcs.
REFRIGERATOR OUTLET & COVER 2 pcs.
DUPLEX CONVENIENCE OUTLET & COVER 23 pcs.
RANGE OUTLET & COVER 1 pcs.
WINDOW TYPE ACU OUTLET & COVER 6 pcs.
WINDOW TYPE ACU 6 pcs.
UTILITY BOX 17 pcs.
JUNCTION BOX 17 pcs.
TWO-GANG SWITCH 17 pcs.
PANEL BOARD 1 pcs.
THHN WIRE 3.5mm dia. 270.3 m say 300 m
THHN WIRE 2.0mm dia. 72.6 m say 80 m
PVC CONDUIT 20mm dia. 390 m
GA. 16 WIRE 7.36 kg. say 8 kg.
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

SCHEDULE OF WORKS

ITEM DESCRIPTION DURATION


A Preparations 1 day/s
B Perimeter Fence 1 day/s
C Land Clearing 1 day/s
D Move - in 1 day/s
E Excavate 5 day/s
F Shoring 5 day/s
G Rebars (Column/footing) 5 day/s
H Forms (Column/footing) 5 day/s
I Concrete (Column/footing) 2 day/s
J Remove Forms/Shores (Column/footing) 2 day/s
K Backfill (Layer 1) 2 day/s
L Septic Tank 1 day/s
M Catch Basin 1 day/s
N Waste line laying 2 day/s
O Backfill (Layer 2) 2 day/s
P Basecourse 1 day/s
Q Rebars (S.O.G) 3 day/s
R Forms (S.O.G) 2 day/s
S Shores (S.O.G) 2 day/s
T Concrete (S.O.G) 1 day/s
U Remove Forms/Shores (S.O.G) 3 day/s
V Electrical line laying (G/F) 3 day/s
W Water line laying 10 day/s
X Rebars (Column G/F) 20 day/s
Y Forms(Column G/F) 10 day/s
Z Scaffolds (Column G/F) 10 day/s
AA Concrete(Column G/F) 3 day/s
BB Remove forms & scaffolds(Column G/F) 3 day/s
Rebars (Column 2/F)
CC Rebars (Beam) 20 day/s
Rebars (Slab)
DD Forms (Beam) 10 day/s
EE Forms (Slab) 10 day/s
FF Forms (Column 2/F) 10 day/s
GG Scaffolds (Beam, Slab, Column 2/F) 10 day/s
HH Concrete (Beam, Slab, Column 2/F) 3 day/s
II Remove Forms & Scaffolds(Beam,Slab,Col) 25 day/s
JJ Electrical line laying (2/F) 5 day/s
KK Rebars (Stairs) 5 day/s
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 2
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

SCHEDULE OF WORKS

ITEM DESCRIPTION DURATION


LL Forms (Stairs) 5 day/s
MM Scaffolds (Stairs) 5 day/s
NN Concrete (Stairs) 1 day/s
OO Remove forms & scaffolds (Stairs) 10 day/s
Rebars (Column)
PP 15 day/s
Rebars (Roof Beam)
QQ Forms (Roof Beam, Column) 10 day/s
RR Forms (Column) 10 day/s
SS Scaffolds (Roof Beam, Column) 10 day/s
TT Concrete (Roof Beam, Column) 3 day/s
UU Remove forms & scaffolds(R.Beam, Col.) 25 day/s
VV CHB laying (G/F) Ext. wall 12 day/s
WW Plastering works (G/F) Ext. wall 10 day/s
XX CHB laying (2/F) Ext. wall 12 day/s
YY Plastering works (2/F) Ext. wall 10 day/s
ZZ CHB laying (G/F) Int. wall 12 day/s
AAA Plastering works (G/F) Int. wall 15 day/s
BBB CHB laying (2/F) Int. wall 12 day/s
CCC Plastering works (2/F) Int. wall 15 day/s
DDD Truss Laying 7 day/s
EEE Purlins 7 day/s
FFF Sagrods 7 day/s
GGG Roof sheeting 5 day/s
HHH Roofing accessories 7 day/s
III Outlets, switches & sockets 3 day/s
JJJ Ceiling joist (G/F) 5 day/s
KKK Ceiling board (G/F) 5 day/s
LLL Ceiling joist (2/F) 7 day/s
MMM Ceiling board (2/F) 7 day/s
NNN Doors and windows 10 day/s
OOO Tileworks (Wall)(G/F) 7 day/s
PPP Tileworks (Wall)(2/F) 7 day/s
QQQ Tileworks (Floor)(G/F) 7 day/s
RRR Tileworks (Floor)(2/F) 7 day/s
SSS Sanitary fixtures 15 day/s
TTT Roof painting 5 day/s
UUU Ext. Painting 10 day/s
VVV Int. Painting 10 day/s

TOTAL DURATION 263 day/s


CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

BILL OF QUANTITIES

JOB: TWO STOREY RESIDENCE Lot. 21 Blk. 1 Brgy. Fairview, Quezon City DATE: 21-Feb-13
ESTIMATORS:ACUSA,Gerald Virgilio; AVILA, Mark Edward ; BELTRAN, Feby Ann

ITEMS DESCRIPTION QTY. UNIT UNIT COST TOTAL COST


NO.
1 Earthworks
1.1 Structural excavation 106.366 cu.m 650.00 69,137.58
1.2 Backfill and compaction 111.938 cu.m 670.00 74,998.46
1.3 Gravel bedding & compaction (Basecourse) 14.45 cu.m 895.00 12,932.75
2 Concrete Works
2.1 Concrete 3,000 psi
2.1.1 Cement 1,607 bags 215.00 345,472.75
2.1.2 Sand 98.0998 cu.m 550.00 53,954.91
2.1.3 Gravel 88.5346 cu.m 650.00 57,547.46
3 Masonry works
3.1 6" Thick CHB 3,066 pcs. 12.50 38,325.00
3.2 4" Thick CHB 1,811 pcs. 10.50 19,015.50
4 Rebar works
4.1 10mm dia. Bar 2560.48 kg. 126.26 323,286.57
4.2 12mm dia. Bar 2170.63 kg. 157.82 342,568.38
4.3 16mm dia. Bar 6517 kg. 175.54 1,143,988.98
4.4 No. 16 G.I. Wire 160.77 kg. 200.20 32,186.31
Roofing steel works
5 (including cross bracing & accessories)
5.1 Truss T-1 1 sets 89,240.00 89,240.00
5.2 Half Truss HT-1 1 sets 68,897.00 68,897.00
5.3 Half Truss HT-2 1 sets 61,340.00 61,340.00
5.4 Half Truss HT-3 1 sets 29,146.00 29,146.00
5.5 Half Truss HT-4 1 sets 29,146.00 29,146.00
5.6 Half Truss HT-5 1 sets 68,897.00 68,897.00
5.7 Half Truss HT-6 1 sets 61,340.00 61,340.00
5.8 Half Truss HT-7 1 sets 29,146.00 29,146.00
5.9 Half Truss HT-8 1 sets 29,146.00 29,146.00
5.10 C-Purlins 2" x 4" x 1/8" 348.85 m 1,193.00 416178.05
6 Roofing system (with accessories)
6.1 Ga. 26 Pre-painted ribtype roof sheet 55 sq. m 517.00 28,435.00
6.2 Ga. 24 ridge roll 85.8 m 291.00 24,967.80
6.3 Ga. 24 gutter (w/strainer) 60.6 m 339.00 20,543.40
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

BILL OF QUANTITIES

JOB: TWO STOREY RESIDENCE Lot. 21 Blk. 1 Brgy. Fairview, Quezon City DATE: 21-Feb-13
ESTIMATORS:ACUSA,Gerald Virgilio; AVILA, Mark Edward ; BELTRAN, Feby Ann

ITEMS DESCRIPTION QTY. UNIT UNIT COST TOTAL COST


NO.
7 Finishes
7.1 Latex paint 15 gal. 560.00 8,400.00
7.2 Semi gloss latex 8 gal. 560.00 4,480.00
7.3 Latex primer 38 gal. 560.00 21,280.00
7.4 Gloss latex 15 gal. 560.00 8,400.00
7.5 Concrete neutralizer 16 lit. 56.00 896.00
7.6 Wood primer and sealer 21 gal. 350.00 7,350.00
7.7 Roof paint 8 gal. 560.00 4,480.00
7.8 Quick dry enamel 21 gal. 560.00 11,760.00
7.9 Paint thinner 6 gal. 350.00 2,100.00
8 Miscellaneous Works
8.1 200 x 200 mm Unglazed tiles 678 pcs. 14.00 9,492.00
8.2 200 x 400 mm Glazed tiles 1374 pcs. 20.00 27,480.00
8.3 300 x 300 mm Glazed tiles 222 pcs. 20.00 4,440.00
8.4 400 x 400 mm Glazed tiles 1296 pcs. 25.00 32,400.00
8.5 White cement filler 160 kg. 241.00 38,560.00
8.6 Solid wooden panel door with 2" x 4" door jamb 1 pcs. 3,000.00 3,000.00
8.7 Solid wooden panel door with 2" x 4" door jamb 5 pcs. 3,000.00 15,000.00
8.8 Solid wooden panel door with 2" x 4" door jamb 7 pcs. 3,000.00 21,000.00
8.9 Glass aluminum sliding door with 2" x 4" door jamb 1 pcs. 5,000.00 5,000.00
8.10 Glass aluminum sliding window 9 pcs. 4,000.00 36,000.00
8.11 Glass aluminum sliding window 2 pcs. 3,000.00 6,000.00
8.12 Glass aluminum sliding window 5 pcs. 1,800.00 9,000.00
8.13 Glass aluminum sliding window 1 pcs. 2,000.00 2,000.00
8.14 Glass aluminum sliding window 1 pcs. 4,000.00 4,000.00
8.15 Glass fixed panel 2 pcs. 5,000.00 10,000.00
8.16 1/4 Plywood 325 pcs. 385.00 125,125.00
8.17 2" x 2" Coco lumber 3100 bd. Ft. 30.00 93,000.00
8.18 CWN 268 pcs. 45.00 12,060.00
8.19 Finishing nail 32 pcs. 45.00 1,440.00
8.20 Casing Brad 1 pcs. 45.00 45.00
9 Water works
9.1 Water lines
9.1.1 25mm dia. G.I. pipe incl. fittings 81 m 133.00 10,773.00
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
• ACUSA, Gerald Virgilio • AVILA, Mark Edward
• Beltran, Feby Ann Page 1
TWO STOREY RESIDENCE
Lot. 21 Blk. 1 Brgy. Fairview, Quezon City

BILL OF QUANTITIES

JOB: TWO STOREY RESIDENCE Lot. 21 Blk. 1 Brgy. Fairview, Quezon City DATE: 21-Feb-13
ESTIMATORS:ACUSA,Gerald Virgilio; AVILA, Mark Edward ; BELTRAN, Feby Ann

ITEMS DESCRIPTION QTY. UNIT UNIT COST TOTAL COST


NO.
9.2 Gate valves, faucets & water meters
9.2.1 25mm dia. Gate valve incl. fittings 1 pcs. 425.00 425.00
9.2.2 12mm dia. Faucet 8 pcs. 740.00 5,920.00
9.2.3 12mm dia. Water meter 1 pcs. 1,205.00 1,205.00
9.2.4 Shower 4 set 2,800.00 11,200.00
9.2.5 Lavatory 3 pcs. 4,500.00 13,500.00
9.3 Sanitary/Drainage system
9.3.1 100mm dia. PVC incl. fittings and accessories 105 m 239.00 25,095.00
9.3.2 Catch basin 9 set 794.00 7,146.00
9.3.3 Water closet 4 pcs. 5,000.00 20,000.00
9.3.4 Kitchen sink 1 pcs. 3,500.00 3,500.00
10 Electrical works (including rough-in materials)
10.1 a. Panelboard LP-Market Bldg NEMA1, Main:40AT, 1 set 7,178.00 7,178.00
Branches: 2-15AT, 1-20AT, bolt-on type
10.2 Flourescent light socket 4 sets 150.00 600.00
10.3 Circular lighting socket 10 sets 170.00 1,700.00
10.4 Incandescent bulb socket 9 sets 120.00 1,080.00
10.5 Flourescent light 4 sets 1,515.00 6,060.00
10.6 Circular lighting 10 sets 1,610.00 16,100.00
10.7 Incandescent bulb 9 sets 207.00 1,863.00
10.8 Refrigirator outlet and cover 2 sets 800.00 1,600.00
10.9 Duplex convenience outlet and cover 23 sets 718.00 16,514.00
10.1 Range outlet and cover 1 sets 800.00 800.00
10.11 Window type ACU outlet and cover 6 sets 750.00 4,500.00
10.12 Window type ACU 6 sets 5,000.00 30,000.00
10.13 Utility box 17 sets 150.00 2,550.00
10.14 Junction box 17 sets 150.00 2,550.00
10.15 Two-gang switch 17 sets 400.00 6,800.00
10.16 THHN wire 3.5mm dia. 270.3 m 28.00 7,568.40
10.17 THHN wire 2.0mm dia. 72.6 m 20.00 1,452.00
10.18 PVC conduit 20mm dia. 390 m 40.00 15,600.00
TOTAL 4,217,304.30
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
ACUSA, Gerald Virgilio • AVILA, Mark Edward • Beltran, Feby Ann
Page 1
LABOR COST

RATE Initial No. of hrs. Amount No. of No. of Duration Labor Fee Labor Cost Total Cost
CIVIL WORKS (m²/day/man) Rate of work Days Laborer/s (days/s) (Php) (Php) (Php)
LAND CLEARING : 160 20 m²/hr. 8 300 m² 1.88 2 1 250 500 500
EXCAVATION : 12.00 1.50 m³/day 8 106.366 m³ 8.86 2 5 350 700 3500
BACKFILL&COMPACTION: 39.04 4.88 m³/day 8 130.687 m³ 3.35 1 3 350 350 1050
COMPACTED BASECOURSE: 400 50 m²/day 8 148.205 m² 0.37 1 1 350 350 350
CE 521L TOTAL : 5400
CONSTR
UCTION RATE Initial No. of hrs. No. of No. of
MANAG Amount Duration Labor Fee Labor Cost Total Cost
EMENT CONCRETE WORKS (m³/day/team) Rate of work Days Laborer/s (days/s) (Php) (Php) (Php)
LAB. 0.20 8 18.288 m³ 11.43 2 6
FOOTING (helpers): 1.60 m³/hr. 325 650 3900
FOOTING (mason) : 2 6 400 800 4800
SOG (helpers) : *5teams 1.60 0.20 m³/hr. 8 14.821 m³ 9.26 5 2 325 1625 3250
SOG (mason) : *5teams 5 2 400 2000 4000
SUSPENDED SLABS (helpers):
*3teams 1.60 0.20 m³/hr. 8 11.841 m³ 7.40 3 3 325 975 2925
SUSPENDED SLABS (mason):
*3teams 3 3 400 1200 3600
COLUMNS (G/F) (helper): 1.60 0.20 m³/hr. 8 2.944 m³ 1.84 1 3 325 325 975
COLUMNS (G/F) (mason): 1 3 400 400 1200
COLUMNS (2/F) (helper):
*2teams 1.6 0.20 m³/hr. 8 5.26 m³ 3.29 2 2 325 650 1300
COLUMNS (2/F) (mason):
*2teams 2 2 400 800 1600
BEAMS (2/F) (helper): *2teams
1.6 0.20 m³/hr. 8 6.776 m³ 4.24 2 3 325 650 1950
BEAMS (2/F) (mason):
*2teams 2 3 400 800 2400
ROOF BEAMS (helper):
*2teams 1.6 0.20 m³/hr. 8 5.958 m³ 3.72 2 2 325 650 1300
ROOF BEAMS (mason):
*2teams 2 2 400 800 1600
TOTAL : 34800
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
ACUSA, Gerald Virgilio • AVILA, Mark Edward • Beltran, Feby Ann
Page 1
LABOR COST

RATE Initial No. of hrs. Amount No. of No. of Duration Labor Fee Labor Cost Total Cost
MASONRY WORKS (m²/day/-) Rate of work Days Laborer/s (days/s) (Php) (Php) (Php)
CHB G/F (helpers) : *2teams 10.00 1.25 m²/day 8 187.73 m² 18.77 2 10 325 650 6500
CHB G/F (mason) : *2teams 2 10 400 800 8000
CHB 2/F (helpers) : *2teams 10.00 1.25 m²/day 8 188.94 m² 18.89 2 10 325 650 6500
CHB 2/F (mason) : *2teams 2 10 400 800 8000
CE 521L PLASTERING (G/F): 4.8 0.6 m²/day 8 158.87 m² 33.10 3 12 400 1200 14400
CONSTR PLASTERING (2/F): 4.8 0.6 m²/day 8 188.94 m² 39.36 4 10 400 1600 16000
UCTION
MANAG TOTAL : 59400
EMENT
LAB. RATE Initial No. of hrs. No. of No. of
Amount Duration Labor Fee Labor Cost Total Cost
PAINTING WORKS (m²/day/man) Rate of work Days Laborer/s (days/s) (Php) (Php) (Php)
EXTERIOR: 27.84 3.48 m³/day 8 216.35 m² 7.77 1 8 350 350 2800
INTERIOR: 27.84 3.48 m³/day 8 639.87 m² 22.98 3 8 350 1050 8400
ROOF: 27.84 3.48 m³/day 8 55 m² 1.98 1 2 350 350 700
TOTAL : 11900

DOORS & WINDOWS RATE Initial No. of hrs. Amount No. of No. of Duration Labor Fee Labor Cost Total Cost
INSTALLATION (pc/day/man) Rate of work Days Laborer/s (days/s) (Php) (Php) (Php)
WINDOWS: 8 1 pc./hr. 8 20 pcs. 2.50 1 3 350 350 1050
WOODEN DOORS: 8 1 pc/hr. 8 13 pcs. 1.63 1 2 350 350 700
SLIDING DOORS: 6.64 0.83 pc/hr. 8 1 pcs. 0.15 1 1 350 350 350
TOTAL : 2100
CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET
5CE-B
ACUSA, Gerald Virgilio • AVILA, Mark Edward • Beltran, Feby Ann
Page 1
LABOR COST

FORMWORKS RATE Initial No. of hrs. Amount No. of No. of Duration Labor Fee Labor Cost Total Cost
FABRICATION (m²/day/man) Rate of work Days Laborer/s (days/s) (Php) (Php) (Php)
BEAMS : 14.88 1.86 m²/hr 8 97.9 m² 6.58 2 4 400 800 3200
SLABS : 14.88 1.86 m²/hr 8 118.41 m² 7.96 2 4 400 800 3200
COLUMNS : 14.88 1.86 m²/hr 8 78.4 m² 5.27 2 3 400 800 2400
TOTAL : 8800
CE 521L
CONSTR FORMWORKS RATE Initial No. of hrs. Amount No. of No. of Duration Labor Fee Labor Cost Total Cost
UCTION
MANAG INSTALLATION (m²/day/man) Rate of work Days Laborer/s (days/s) (Php) (Php) (Php)
EMENT BEAMS : 5.20 0.65 m²/hr 8 97.9 m² 18.83 4 5 400 1600 8000
LAB. SLABS : 9.60 1.20 m²/hr 8 118.41 m² 12.33 3 5 400 1200 6000
COLUMNS : 6.80 0.85 m²/hr 8 78.4 m² 11.53 4 3 400 1600 4800
TOTAL : 18800

FORMWORKS RATE Initial No. of hrs. Amount No. of No. of Duration Labor Fee Labor Cost Total Cost
STRIPPING (m²/day/man) Rate of work Days Laborer/s (days/s) (Php) (Php) (Php)
BEAMS : 78.08 9.76 m²/hr 8 97.9 m² 1.25 1 2 400 400 800
SLABS : 74.40 9.30 m²/hr 8 118.41 m² 1.59 1 2 400 400 800
COLUMNS : 94.08 11.76 m²/hr 8 78.4 m² 0.83 1 1 400 400 400
TOTAL : 2000

RATE OF LABOR LABOR COST


MATERIAL COST % Pc/s. TOTAL COST (Php)
STEELWORKS (% of material cost) (Php)
TRUSS FABRICATION: 882476.05 100 882476.05 1 882476.05 882476.05
TRUSS INSTALLATION: 882476.05 50 441238.025 1 441238.025 441238.025
TOTAL : 1323714.075

CE 521L CONSTRUCTION MANAGEMENT LAB. CALCULATION SHEET


5CE-B
ACUSA, Gerald Virgilio • AVILA, Mark Edward • Beltran, Feby Ann
Page 1
LABOR COST

REBAR WORKS RATE Initial No. of hrs. Amount No. of No. of Duration Labor Fee Labor Cost Total Cost
FABRICATION (m²/day/man) Rate of work Days Laborer/s (days/s) (Php) (Php) (Php)
SOG : 224.00 28.00 kg/hr 8 658.956 kg 2.94 3 1 350 1050 1050
SUSPENDED SLABS : 224.00 28.00 kg/hr 8 1882.902 kg 8.41 3 3 350 1050 3150
FOOTING: 224.00 28.00 kg/hr 8 1059.354 kg 4.73 4 2 350 1400 2800
COLUMNS (G/F) : 224.00 28.00 kg/hr 8 1403.04 kg 6.26 2 4 350 700 2800
COLUMNS (2/F) : 224.00 28.00 kg/hr 8 227.52 kg 1.02 1 2 350 350 700
BEAMS: 224.00 28.00 kg/hr 8 1699.29 kg 7.59 3 3 350 1050 3150
ROOF BEAM: 224.00 28.00 kg/hr 8 971.7 kg 4.34 2 3 350 700 2100
TOTAL : 15750

REBAR WORKS RATE Initial No. of hrs. Amount No. of No. of Duration Labor Fee Labor Cost Total Cost
INSTALLATION (m²/day/man) Rate of work Days Laborer/s (days/s) (Php) (Php) (Php)
SOG : 160.00 20.00 kg/hr 8 658.956 kg 4.12 3 2 350 1050 2100
SUSPENDED SLABS : 160.00 20.00 kg/hr 8 1882.902 kg 11.77 5 3 350 1750 5250
FOOTING: 160.00 20.00 kg/hr 8 1059.354 kg 6.62 3 3 350 1050 3150
COLUMNS (G/F) : 160.00 20.00 kg/hr 8 1403.04 kg 8.77 2 5 350 700 3500
COLUMNS (2/F) : 160.00 20.00 kg/hr 8 227.52 kg 1.42 1 2 350 350 700
BEAMS: 160.00 20.00 kg/hr 8 1699.29 kg 10.62 3 4 350 1050 4200
ROOF BEAM: 160.00 20.00 kg/hr 8 971.7 kg 6.07 3 3 350 1050 3150
TOTAL : 22050