Parallel processing in ABAP

In recent time I got a requirement where i was supposed to process a huge amount of data provided by the
user in the excel sheet and update this data in the HR infotypes. Unfortunately the function module that
updates the infotype ‘HR_INFOTYPE_OPERATION’ updates only one infotype at a time. So i was forced to
call the function module in a loop, which sometimes results with time out error when the data volume is more.
Thinking the possibilities of avoiding the timeout error i came to know the concept of parallel processing in
ABAP which is processed in asynchronous mode. With parallel processing, there is a possibility of increase
the performance to a huge extent. There are some limitations though. One should be careful when using this
process.
Whenever we are processing a function module in a loop what happens is the looping will be performed by a
dialog work process and it wait till the execution of the function module completes and then resume the
operation from there (Synchronous). Here in the case of parallel processing the function module is assigned to
be executed with a new work process, here there is no need for the dialog work process processing the loop to
wait till the execution of the function module it continues to resume the process with the next set of
data(Asynchronous mode).
The below mentioned reference link will teach you lot about parallel processing.
Reference link
http://help.sap.com/saphelp_nw70/helpdata/en/fa/096e92543b11d1898e0000e8322d00/content.htm
http://help.sap.com/saphelp_nwpi71/helpdata/en/22/0425c6488911d189490000e829fbbd/content.htm
http://sapignite.com/learn-parallel-processing-in-abap/
Here are few things that i learnt:
1. Parallel processing is not suitable for data that are to be processed sequentially. Hence logically
independent work can only be processed by this method.
2. All function modules that are RFC enabled can be processed by this mode.
3. When RFC enabled function module is called we are supposed to specify a group in which the rfc is
supposed to be executed. You can find this RFC group in Tcode RZ12. A group includes the
application server instances and that instance in turn can contain any no of dialog work process
configured by the basis team. I noticied that there was group created with ‘parallel_generator’ and i
guess it must be available in all servers for parallel processing.
4. Before we are going to process the task lets check for the available no of dialog work process and split
our processing accordingly. Try to utilize only a min of work process that are free so as not to soak up
the jobs running in other applications

Below is a simple example to demonstrate the difference between the two modes of processing data.
Step 1: Created a table with the following structure.

http://www.teamabap.com/2014/05/parallel-processing-in-abap.html 1/8
11/08/2017 Parallel processing in ABAP - Team ABAP

Step 2: I have created a function module that update data to the table one by one.

Now to check the difference in performance between parallel processing and normal procedure I have created
two programs.

Program 1: Without parallel processing.

Code:
data : wa_data type zzcsk_emp.
data : it_data type standard table of zzcsk_emp.
data : lv_result type flag.

start-of-selection.

* Populate the dummy data

do 1000 times.
wa_data-mandt = sy-mandt.
wa_data-field1 = sy-index.
append wa_data to it_data.
clear wa_data.
enddo.

* Call the function module to update the data.

call function 'ZCSK_PARALLEL_TABLE_UPDATE'


importing
lv_result = lv_result
tables
data = it_data.

if lv_result = abap_true.
write : / 'Success'.
else.
write : / 'Failed'.
endif.

Runtime analysis of program without parallel processing:

http://www.teamabap.com/2014/05/parallel-processing-in-abap.html 2/8
11/08/2017 Parallel processing in ABAP - Team ABAP

Program 2: With Parallel processing


Code:
data : wa_data type zzcsk_emp,
it_data type standard table of zzcsk_emp, " internal
table with contentss
it_data_temp type standard table of zzcsk_emp. " Internal
table to store the content to be processed

data : lv_appsvr type rzllitab-classname value 'parallel_generators'. " All the


application servers assinged to an instance
" are grouped in the table rzllitab " You can see the instance data's in tcode
rz12

data : lv_total type i, " Total no


of dialog work process available in the group server
lv_available type i, " No of
dialog work process that are free.
lv_occupied type i, " No of
occupied dialog process
lv_diff type i, "
Percentage difference of available work process
lv_split type i. " No of
partitions the main data is to be split

data : lv_lines type i, " No of


records in the internal table
lv_lines_tab type i, " No of
lines per tab
lv_start type i, " Start
point for processing
lv_end type i. " End
point for processing

data : lv_task type string, " Name of


the task to be created
lv_index type string, " Variable
for index
lv_sent type i, " No of
package sent
lv_comp type i, " No of
package completed
lv_result type flag. " Variable
to collect the result.

data : lv_result_string TYPE string. " Result


string

start-of-selection.

* Call the function module spbt_initialize the list of application server available and
those that are free

call function 'SPBT_INITIALIZE'


exporting
group_name = lv_appsvr
importing
max_pbt_wps = lv_total
free_pbt_wps = lv_available
exceptions
invalid_group_name = 1
internal_error = 2
pbt_env_already_initialized = 3
currently_no_resources_avail = 4
no_pbt_resources_found = 5
cant_init_different_pbt_groups = 6
others = 7.
if sy-subrc = 0.

* Split the data to be processed into no of work processes.

lv_occupied = lv_total - lv_available.

* Calculate the difference in percentage

lv_diff = ( lv_available * 100 ) / lv_total.

* Based on the available no of workprocess split the data

if lv_diff <= 25.

http://www.teamabap.com/2014/05/parallel-processing-in-abap.html 3/8
11/08/2017 Parallel processing in ABAP - Team ABAP
lv_split = lv_available div 2.

elseif lv_diff between 25 and 50.

lv_split = lv_available * 2 div 3.

elseif lv_diff >= 50.

lv_split = lv_available * 3 div 4.

endif.

endif.

* Dummy data generation

do 1000 times.
wa_data-mandt = sy-mandt.
wa_data-field1 = sy-index.
append wa_data to it_data.
enddo.

* Split the internal table accordingly.

lv_lines = lines( it_data ).

lv_lines_tab = lv_lines / lv_split.

do lv_split times.

lv_index = sy-index.

concatenate 'task' lv_index into lv_task.

lv_start = lv_start + lv_lines_tab.


lv_end = lv_lines_tab + 1.

if lv_index = 1.
lv_start = 0.
endif.

if lv_split = lv_index.
lv_end = 0.
endif.

it_data_temp[] = it_data[].

if lv_start is not initial.


delete it_data_temp to lv_start.
endif.

if lv_end is not initial.


delete it_data_temp from lv_end.
endif.

* Process the record set


* Call the function module to update the data.
* Here each and everytime the function module is called it will be called in a dialog
work process that is free
call function 'ZCSK_PARALLEL_TABLE_UPDATE' starting new task lv_task destination in
group lv_appsvr
performing update_status on end of task
tables
data = it_data_temp.

if sy-subrc = 0.

lv_sent = lv_sent + 1.

endif.

enddo.

WAIT UNTIL lv_comp >= lv_sent.

write : / 'The no of packets sent' , lv_sent,


'The no of packets completed', lv_comp.

*&---------------------------------------------------------------------*

http://www.teamabap.com/2014/05/parallel-processing-in-abap.html 4/8
11/08/2017 Parallel processing in ABAP - Team ABAP
*& Form UPDATE_STATUS
*&---------------------------------------------------------------------*
* text
*----------------------------------------------------------------------*
* -->P_DATA text
* -->P_= text
* -->P_IT_DATA_TEMP text
*----------------------------------------------------------------------*
form update_status using lv_task.

lv_comp = lv_comp + 1.

receive results from function 'ZCSK_PARALLEL_TABLE_UPDATE'


importing
lv_result = lv_result.

if lv_result is initial.
lv_result_string = 'Success'.
else.
lv_result_string = 'Failure'.
endif.

concatenate 'The data passed via task' lv_task 'updation is' lv_result_string into
lv_result_string separated by space.

write : / lv_result_string.

endform. " UPDATE_STATUS

Runtime analysis of program with parallel processing:

0  Share 0  Pin it 0  Tweet  Share 0 


SHARES

About Arun krishnamoorthy

I am an SAP Technical Consultant currently working in Yash Technologies pvt ltd. I am


expertise in the areas of SAP UI5, SAP HANA, ABAP, OO ABAP and Webdynpro ABAP. I
am a blogger and trainer love to share knowledge.

RELATED POSTS

Structure of an ABAP program Flow of an ABAP program Access to IDES System

http://www.teamabap.com/2014/05/parallel-processing-in-abap.html 5/8
11/08/2017 Parallel processing in ABAP - Team ABAP

Exercise 1- Usage of New keyword Ge... Debugging a function module execute... Logging on to sap environment

4 Comments:

ANONYMOUS DECEMBER 4, 2014 AT 6:30 AM

Hi Arun Krishnamoorthy,

firstly thanks for the post, Very informative and self explaining.

But i have one doubt, insted of "DO lv_split TIMES" if we use "DO ENDDO" while calling parallel FM, how
many times it will execute?

Because it is not mandatory to use FM SPBT_INITIALIZE. If we dont use it then i think we Need to use
only Do and END Do.

** In your example if i remove DO lv_split TIMES with DO i am getting Resource failure error. please
suggest why is this happening.

*** Can we replace DO with Loop?

Thanks in advance,

regards,
Narsireddy.

Reply

Replies

ARUN KRISHNAMOORTHY ADMIN DECEMBER 4, 2014 AT 7:07 AM

The reason why i am calling the SPBT_INTIALIZE method is to get to know how many
work process are available in the system at that point of time of execution. By knowing that
i utilize a max of 1/3 rd of process for my self and leave the rest for the process executed
by others.

In each and every do loop i am assigning a set of records to be processed by a particular


work process. So depending up on the no of work process available i am splitting my data
and processing the data. say for example i have 3 work process to utilize and 90 records
to update. I split it into 3 data sets and assign each of the data set to one work process.

In your case, when you are blindly using do statement, what might happen is that, say you
have 9 work process left in the system to be utilized and in each loop you are assigning
the task to one work process at the 10th loop you will not have any work process to carry
out your job and you will end up with errors. say a resource failure might be..

So please ensure before you assign a task that the work process is available to carry out
that job.

Best Regards,
Arun Krishnamoorthy

ANONYMOUS DECEMBER 9, 2014 AT 5:58 AM

Dear Arun Krishnamoorthy,

Thanks for your reply,

I have considered the exceptions and in case of System failure or Communication


failure,In help.sap.com it is specified to "Log the data that has been processed when
an RFC Task is started and when it Returns, so that the Job can be restarted with
unprocessed data."
(http://help.sap.com/saphelp_nw70/helpdata/en/fa/096e92543b11d1898e0000e8322
d00/content.htm)

Can you help me how to log the data that is processed and can be restarted with
unprocessed data if an error occurs.

http://www.teamabap.com/2014/05/parallel-processing-in-abap.html 6/8
11/08/2017 Parallel processing in ABAP - Team ABAP
Thanks & regards,
Cheruku

Reply

MIGUEL SILVA JULY 18, 2016 AT 7:27 AM

Hello,

Thank you very much for share all this information.


I have one doubt about parallel processing with multiply jobs. It is possible without causing any problem.

Thank you in advance.


Miguel Silva

Reply

Enter your comment...

Comment as: Select profile...

Publish Preview

Newer Post Home Older Post

SOCIAL SHARE

450 7
FANS FOLLOWERS

77 1
SUBSCRIBERS SUBSCRIBERS

SUBSCRIBE
TO RSS FEED

Popular Post Archive Contact

Webdynpro ABAP

Field Symbols and Data Reference Variables.

Parallel processing in ABAP

Maintenance View

Adobe forms

Introduction to webdynpro ABAP

ALV Report using class CL_GUI_ALV_GRID

Drop down by Index

Different types of controller in Webdynpro ABAP

Passing data between views using plugs

LABELS

ABAP 25

http://www.teamabap.com/2014/05/parallel-processing-in-abap.html 7/8
11/08/2017 Parallel processing in ABAP - Team ABAP

ABAP Objects 2

Adobe Forms 12

SAP HANA 19

SAP UI5 25

Webdynpro ABAP 97

LIKE THIS PAGE

Team ABAP
528 curtidas

Curtir Página Fale conosco

Seja o primeiro de seus amigos a curtir isso.

Team ABAP
há ± 4 meses

Overview Page Floor plan - SA…


In this tutorial i am going to explain how to cre…
TEAMABAP.COM

ABOUT ME MOST POPULAR VISITORS COUNT


BLOG ARCHIVE

► 2017 (15)
Webdynpro ABAP 8 8 1 7 5 6
► 2016 (12)
ABAP Objects
► 2015 (12)
▼ 2014 (165)
Arun krishnamoorthy December (2) SAP UI5
Follow 153 November (5)
September (8) Introduction to webdynpro ABAP
I am an SAP Technical Consultant August (2)
currently working in Yash Technologies July (19) Field Symbols and Data Reference
pvt ltd. I am expertise in the areas of SAP June (6) Variables.
UI5, SAP HANA, ABAP, OO ABAP and May (123)
Webdynpro ABAP. I am a blogger and Different types of controller in
trainer love to share knowledge. Webdynpro ABAP

View my complete profile


Parallel processing in ABAP

Created by ThemeXpose Home About Contact

http://www.teamabap.com/2014/05/parallel-processing-in-abap.html 8/8

You might also like