QF-DGN-01

TITLE: DOCUMENT/DRAWING APPROVAL/COMMENT TRANSMITAL

PROJECT : DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF 230/132KV AIR


INSULATED SWITCHGEAR (AIS) SUBSTATION AT BARISAL ON TURNKEY BASIS.
CONTRACT NUMBER : PGCB/SS/2011/02, Dated 01.08.2012
DOCUMENT SUBMITTAL REF: LECLDR14/08/18-089; Dated: 18.08.2014.
SUBJECT : APPROVAL OF STRUCTURAL DESIGN & FOUNDATION LOADS (SUPPORT REACTION) OF
EQUIPMENT SUPPORTER FOR BARISAL 230/132KV AIS SUBSTATION.

To Copy to,
Project Director
Managing Director, PGCB
Barisal – Bhola Project
Power Grid Company of Bangladesh Limited √ Executive Director (P & D), PGCB
NLDC Complex Aftabnagar South Badda,
Dhaka-1212 √ Chief Engineer (P & D/Project), PGCB
Kind Attn: Mr.
√ Shandong Taikai Power Engineering Co.,Ltd

√ Executive Engr. (Civil Design), PGCB

√ Master File
Dear Sir,
We are pleased to enclose the following documents for the purpose indicated below:

Issued by:
(1)
In case of any modification other than those desired are carried out, the same shall be
highlighted clearly in the Drawing/Document with full justification thereof and resubmitted SUKANTO LAL NAG
for approval. Superintending Engr.
(2) (Civil Design & Q/C),
Approval/Comments/Information conveyed herein neither relieves the contractor of his
contractual obligation and his responsibilities for correctness of dimensions, material of PGCB, Dhaka
constructions, weight, quantities, design details, assemble fits, performance particulars Our Ref: 04-PGCB/SE (Design & Q/C)/ 2014/01
and conformity of the supplies with the Statutory Laws of Bangladesh as may be
applicable, nor does it limit the Employer’s right under the contract.” Date: 24/08/14

Item No Description of Drawing/ Document Drawing Number Revision Status Enclosed


Documents Number

Approved (A) √
Yes √
Approved with
Please refer to Annexure -1 Correction (C)

Request for re-


Submission (RR) No

For information
(FI)

Please acknowledge receipt of documents:

Received by Date

Note:
(1)The above paragraph shall be added if the status of the document is C/RR/FI.
(2)The above paragraph shall be added if the status of the document is A or C.
04-PGCB/SE (Design & Q/C)/ 2014/01 Date: 24 August, 2014

Annexure-1

Sl. no Description Drawing / Document no. Comments


Basic Design for Equipment Supporter of 252KV
01. Disconnecting Switch without left Grounding Switch for TKPE-230-B0004-A-C0201-01; Rev. 0, Approved
Barisal 230/132KV AIS Sub-station. Sheet 1 of 1
Basic Design for Equipment Supporter of 252KV
02. Disconnecting Switch with left Grounding Switch for TKPE-230-B0004-A-C0201-02; Rev. 0, Approved
Barisal 230/132KV AIS Sub-station. Sheet 1 of 1
Basic Design for Equipment Supporter of 252KV
03. Disconnecting Switch with Right Grounding Switch for TKPE-230-B0004-A-C0201-03; Rev. 1, Approved
Barisal 230/132KV AIS Sub-station. Sheet 1 of 1
Basic Design for Equipment Supporter of 145KV
04. Disconnecting Switch without left Grounding Switch for TKPE-230-B0004-A-C0202-01; Rev. 0, Approved
Barisal 230/132KV AIS Sub-station. Sheet 1 of 1
Basic Design for Equipment Supporter of 145KV
05. Disconnecting Switch with left Grounding Switch for TKPE-230-B0004-A-C0202-02; Rev. 0, Approved
Barisal 230/132KV AIS Sub-station. Sheet 1 of 1
Basic Design for Equipment Supporter of 145KV
06. Disconnecting Switch with Right Grounding Switch for TKPE-230-B0004-A-C0202-03; Rev. 0, Approved
Barisal 230/132KV AIS Sub-station. Sheet 1 of 1
Basic Design for Equipment Supporter of 252KV Busbar
07. Grounding Switch for Barisal 230/132KV AIS Sub- TKPE-230-B0004-A-C0203-01; Rev. 0, Approved
station. Sheet 1 of 1
Basic Design for Equipment Supporter of 132KV
08. Lightning Arrester for Barisal 230/132KV AIS Sub- TKPE-230-B0004-A-C0205-01; Rev. 0, Approved
station. Sheet 1 of 1

09. Foundation loads (support reaction) for 230KV DS with left ES DS-230-2-FDN-LOADS; Rev. 0 Approved
Structure.

10. Foundation loads (support reaction) for 230KV DS with Right ES DS-230-3-FDN-LOADS; Rev. 0 Approved
Structure.

11. Foundation loads (support reaction) for 230KV DS without ES DS-230-1-FDN-LOADS; Rev. 0 Approved
Structure.

12. Foundation loads (support reaction) for 132KV DS with left DS-132-2-FDN-LOADS; Rev. 0 Approved
Erath Switch Structure.

13. Foundation loads (support reaction) for 132KV DS with Right DS-132-3-FDN-LOADS; Rev. 0 Approved
Erath Switch Structure.

14. Foundation loads (support reaction) for 132KV DS without Erath DS-132-1-FDN-LOADS; Rev. 0 Approved
Switch Structure.

15. Foundation loads (support reaction) for 132KV LA Structure. LA-FDN-LOADS; Rev. 0 Approved

16. Foundation loads (support reaction) for 132KV BUS Grounding ES-230-BUS-LOADS; Rev. 0 Approved