RESUMEN EJECUTIVO
“Creación del Sistema de Riego Tecnificado de las Comunidades, Ccapa, Curca, Congota, Pampuya
Y Patirara del Distrito de Mara-Cotabambas-Apurímac”
RESUMEN EJECUTIVO
DEMANDA M3 -81,641 -60,208 -4,012 42,718 81,222 8,530 213 252 -266 -1,478 -81,893 -26,712 -123,276
OFERTA M3 48,211 43,546 48,211 46,656 48,211 46,656 48,211 48,211 46,656 48,211 46,656 48,211 567,648
DEMANDA M3 -75,744 -60,676 6,149 117,331 234,155 -155 -260 -311 -862 -2,124 -20,015 -34,430 163,058
OFERTA M3 66,960 60,480 66,960 64,800 66,960 64,800 66,960 66,960 64,800 66,960 64,800 66,960 788,400
Cuadro Nº 1.3
Balance Hídrico Sistema de Riego Congota sin proyecto
MESES ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC TOTAL
DEMANDA M3 -81,641 -60,208 -4,012 42,718 81,222 8,530 213 252 -266 -1,478 -81,893 -26,712 -123,276
OFERTA M3 25,445 22,982 25,445 24,624 25,445 24,624 25,445 25,445 24,624 25,445 24,624 25,445 299,592
Cuadro Nº 1.4
Balance Hídrico Sistema de Riego Pampura sin proyecto
MESES ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC TOTAL
DEMANDA M3 -81,641 -60,208 -4,012 42,718 81,222 8,530 213 252 -266 -1,478 -81,893 -26,712 -123,276
OFERTA M3 20,758 18,749 20,758 20,088 20,758 20,088 20,758 20,758 20,088 20,758 20,088 20,758 244,404
Cuadro Nº 1.5
Balance Hídrico Sistema de Riego Patirara sin proyecto
MESES ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC TOTAL
DEMANDA M3 -81,641 -60,208 -4,012 42,718 81,222 8,530 213 252 -266 -1,478 -81,893 -26,712 -123,276
OFERTA M3 48,211 43,546 48,211 46,656 48,211 46,656 48,211 48,211 46,656 48,211 46,656 48,211 567,648
El balance oferta-demanda de agua con proyecto de los Sistemas de Riego Ccapa, Sistema
Riego Curca, Sistema Riego Congota, Sistema Riego Pampura y Sistema Riego Patirara, se
muestra en los cuadros Nº 1.6, Nº 1.7, Nº 1.8, Nº 1.9 y Nº 1.10 , se observa que no hay
déficit, la oferta hídrica la demanda de los cultivos de los 99 ha.
Cuadro Nº 1.6
Balance Hídrico Sistema de Riego Ccapa con proyecto
MESES ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC TOTAL
DEMANDA M3 -58,214 -18,722 8,856 66,778 35,372 -48 -584 -6,096 -19,401 -50,057 85,394 8,891 52,168
OFERTA M3 81,877 73,954 81,877 79,236 81,877 79,236 81,877 81,877 79,236 81,877 79,236 81,877 964,038
Cuadro Nº 1.7
Balance Hídrico Sistema de Riego Curca con proyecto
MESES ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC TOTAL
DEMANDA M3 -24,628 -21,861 -20,506 31,248 81,705 46,731 -2,991 -4,373 -17,278 -44,822 56,333 35,544 115,102
OFERTA M3 66,960 60,480 66,960 64,800 66,960 64,800 66,960 66,960 64,800 66,960 64,800 66,960 788,400
Cuadro Nº 1.8
Balance Hídrico Sistema de Riego Congota con proyecto
MESES ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC TOTAL
DEMANDA M3 -58,214 -18,722 8,856 66,778 35,372 -48 -584 -6,096 -19,401 -50,057 85,394 8,891 52,168
OFERTA M3 52,229 47,174 52,229 50,544 52,229 50,544 52,229 52,229 50,544 52,229 50,544 52,229 614,952
Cuadro Nº 1.9
Balance Hídrico Sistema de Riego Pampura con proyecto
MESES ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC TOTAL
DEMANDA M3 -58,214 -18,722 8,856 66,778 35,372 -48 -584 -6,096 -19,401 -50,057 85,394 8,891 52,168
OFERTA M3 47,542 42,941 47,542 46,008 47,542 46,008 47,542 47,542 46,008 47,542 46,008 47,542 559,764
Cuadro Nº 1.10
Balance Hídrico Sistema de Riego Patirara con proyecto
MESES ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC TOTAL
DEMANDA M3 -58,214 -18,722 8,856 66,778 35,372 -48 -584 -6,096 -19,401 -50,057 85,394 8,891 52,168
OFERTA M3 74,995 67,738 74,995 72,576 74,995 72,576 74,995 74,995 72,576 74,995 72,576 74,995 883,008
RESERVORIO
Este reservorio se encarga de almacenar las aguas del manante Quinsapugio con un caudal de Q=8 l/s, la
capacidad del reservorio será de 350 m3.
LINEA DE CONDUCCION 2
Es la línea entubada de PVC ISO 4422 UF de Ǿ 130 mm, que se encarga de conducir las aguas del reservorio
hasta la cabecera de las parcelas de riego, una longitud de 310 ml.
LATERALES
.- LATERAL 1.- Es la red primaria de conducción en Tuberías de PVC SAP Ǿ 2”y 1” en una longitud de 350
ml.
.- Red de distribución secundaria.- Comprende la tubería PVC SAP de Ǿ de 1” encargada de conducir el agua
directamente a las parcelas mediante los componentes que son los hidrantes.
.- LATERAL 2.- Es la red primaria de conducción en tubería PVC SAP de Ǿ de 2” y 1”, en una longitud de 240
ml.
.- Red de distribución secundaria.- Es la red secundaria con tubería PVC SAP de Ǿ de 1”, encargada de
conducir el agua a las parcelas de riego mediante los hidrantes.
.-LATERAL 3.- Es red primaria que conducirá el agua mediante tuberías de Ǿ de 2” y 1”, en una longitud de 290
ml.
.- Red de distribución secundaria.- Es la red de distribución secundaria con tubería de Ǿ de 1”, encargada de distribuir
el agua finalmente a las parcelas de riego mediante los hidrantes
BOCATOMA
Construcción de una bocatoma con barraje de derivación para asegurar la captación de un caudal máximo de
diseño de 15 l/s y consta de los componentes principales:
• Ventana de Captación
La ventana de captación con una abertura de 0.30m x 0.20m provisto de rejilla metálica de abertura 5.0 cm.
El barraje con un ancho de 0.30m con un largo de 2.0m. con una altura de 0.30m de piedra grande asentada en
seco.
Con muros de concreto armado de sección trapezoidal de base menor 0.2m, base mayor de 0.40m y una altura
de 1.10m. como parte de la toma de captación.
DESARENADOR
Es una estructura de concreto armado f´c= 210 kg/cm2 de largo 2m. y ancho de 0.5m. con malla de acero
horizontal y vertical Ø 3/8” @ 0.15m.
RESERVORIO
Es un reservorio empotrado en tierra con material impermeabilizante como es el geotextil y geomembrana,
siendo la capacidad de almacenamiento de 700 m3, con estructura de salida de concreto armado f¨c= 210
Kg/cm2, incluido Tubería PVC ISO 4422 UF de Ǿ de 130mm, con sistema de operación de desfogue mediante
una válvula de Ǿ de 4” conectado a un sistema de filtro de estructura de concreto armado.
LATERALES
.- LATERAL 1.- Es la red de conducción primaria, con tubería PVC SAP C-10 de Ǿ de 2” y 1”, encargada de
conducir el agua hasta el sector A, con una longitud de 180 ml.
.- Red de distribución secundaria.- Es la red secundaria que consta de tubería de PVC SAP de Ǿ de 1”C-7.5,
encargada de conducir el agua a las parcelas mediante los hidrantes.
.- LATERAL 2 .- Es la red de conducción primaria con tubería de PVC SAP C-10 de Ǿ de 2” y 1”, encargadas de
conducir el agua hasta el sector B, con una longitud de 140 ml.
.- Red de distribución secundaria.- Es la red secundaria con tubería de PVC SAP de Ǿ de 1”, que se encarga
de distribuir el agua a las parcelas mediante los hidrantes.
.- LATERAL 3.- Es la red de conducción primaria con tubería de PVC SAP de Ǿ de 2” y 1”, encargada de
conducir el agua hasta el sector C, con una longitud de 160 ml.
.- Red de distribución secundaria.- Es la red con tubería PVC SAP de Ǿ de 1”, que se encarga de la
distribución del agua en las parcelas mediante los hidrantes.
CAPTACION
Construcción de una captación en el manante Ccayarayocpugio Tipo Andino, de concreto armado f¨c= 170
Kg/cm2.
RESERVORIO
Construcción de un reservorio empotrado en tierra, con material impermeabilizante consistente de geo textil y
geomebrana, con la compuerta de salida de concreto, con desfogue mediante un tubo PVC SAP de Ǿ de 3”, con
sistema de operación mediante una válvula con brida de Ǿ de 3”, la capacidad de almacenamiento del reservorio
será de 215 m3.
LINEA DE CONDUCCION
La línea de conducción entubado para conducir el agua desde el reservorio hasta la cabecera de las parcelas, con
tubería PVC SAP de Ǿ de 3” C-5, con una longitud de 380 ml.
LATERALES
.- LATERAL 1.- Es la red de conducción primaria encargada de llevar el agua al sector A, mediante tubería PVC
SAP de Ǿ de 2” C-7.5, con una longitud de 90 ml.
.- Red de distribución secundaria.- Es la red que se encarga de distribuir el agua a las parcelas mediantes los
hidrantes, con tubería de PVC SAP de Ǿ de 1”C-7.5
.-LATERAL 2.- Es la red primaria con tubería PVC SAP de Ǿ de 2” C-7.5, encargada de conducir el al al sector B,
con una longitud de 80 ml.
.-Red de distribución secundaria.- Es la red encargada de distribuir el agua a las parcelas mediante los
hidrantes, con tubería PVC SAP de Ǿ de 1” C-7.5
BOCATOMA
Construcción de una bocatoma en la Quebrada y Manante Tincohuaycco con barraje de derivación para asegurar
la captación de un caudal máximo de diseño de 2.5 l/s y consta de los componentes principales:
• Ventana de Captación
• Barraje fusible de piedra grande asentada en seco
• Muros de encausamiento de concreto f´c=210 kg/cm2
La ventana de captación con una abertura de 0.20m x 0.20m provisto de rejilla metálica de abertura 5.0 cm.
El barraje con un ancho de 0.20m con un largo de 1.20m. con una altura de 0.20m de piedra grande asentada en
seco.
Con muros de concreto armado de sección trapezoidal de base menor 0.2m, base mayor de 0.40m y una altura
de 1.10m. como parte de la toma de captación.
DESARENADOR
Es una estructura de concreto armado f´c= 210 kg/cm2 de largo 1.5m. y ancho de 0.4m. con malla de acero
horizontal y vertical Ø 3/8” @ 0.15m.
LINEA DE CONDUCCION
La línea de conducción entubada con tubería PVS SAP C-7.5 de Ǿ de 2” con una longitud de 650 ml, para
conducir el agua del manante y Quebrada Tincohuaycco con un Q= 2.5 l/s
CAPTACION
Consiste en una estructura de concreto armado, para captar las aguas del manante Parccopaya de un Q= 1.5 l/s.
RESERVORIO
Es un reservorio empotrado en tierra con material impermeabilizante como es el geotextil y geomembrana,
siendo la capacidad de almacenamiento de 215 m3, con estructura de salida de concreto armado f¨c= 210
Kg/cm2, incluido Tubería PVC SAP C-10 de Ǿ de 2”, con sistema de operación de desfogue mediante una
válvula de Ǿ de 2” conectado a un sistema de filtro de estructura de concreto armado.
LATERALES
.- LATERAL 1.- Es la red de conducción primaria encargada de llevar el agua al sector A, mediante tubería PVC
SAP de Ǿ de 2” C-7.5, con una longitud de 130 ml.
.- Red de distribución secundaria.- Es la red que se encarga de distribuir el agua a las parcelas mediantes los
hidrantes, con tubería de PVC SAP de Ǿ de 1”C-7.5
.-LATERAL 2.- Es la red primaria con tubería PVC SAP de Ǿ de 2” C-7.5, encargada de conducir el al sector B,
con una longitud de 180 ml.
.-Red de distribución secundaria.- Es la red encargada de distribuir el agua a las parcelas mediante los
hidrantes, con tubería PVC SAP de Ǿ de 1” C-7.5
BOCATOMA 1
Construcción de una bocatoma en la Quebrada Accohueso con barraje de derivación para asegurar la captación
de un caudal máximo de diseño de 3 l/s y consta de los componentes principales:
• Ventana de Captación
• Barraje fusible de piedra grande asentada en seco
• Muros de encausamiento de concreto f´c=210 kg/cm2
La ventana de captación con una abertura de 0.20m x 0.20m provisto de rejilla metálica de abertura 5.0 cm.
El barraje con un ancho de 0.20m con un largo de 1.20m. con una altura de 0.20m de piedra grande asentada en
seco.
Con muros de concreto armado de sección trapezoidal de base menor 0.2m, base mayor de 0.40m y una altura
de 1.10m. como parte de la toma de captación.
DESARENADOR
Es una estructura de concreto armado f´c= 210 kg/cm2 de largo 1.5m. y ancho de 0.4m. con malla de acero
horizontal y vertical Ø 3/8” @ 0.15m.
BOCATOMA 2
Construcción de una bocatoma en la Quebrada Unohuaycco con barraje de derivación para asegurar la
captación de un caudal máximo de diseño de 2 l/s y consta de los componentes principales:
• Ventana de Captación
• Barraje fusible de piedra grande asentada en seco
• Muros de encausamiento de concreto f´c=210 kg/cm2
La ventana de captación con una abertura de 0.20m x 0.20m provisto de rejilla metálica de abertura 5.0 cm.
El barraje con un ancho de 0.20m con un largo de 1.50m. con una altura de 0.20m de piedra grande asentada en
seco.
Con muros de concreto armado de sección trapezoidal de base menor 0.2m, base mayor de 0.40m y una altura
de 1.10m. como parte de la toma de captación.
DESARENADOR
Es una estructura de concreto armado f´c= 210 kg/cm2 de largo 1.5m. y ancho de 0.4m. con malla de acero
horizontal y vertical Ø 3/8” @ 0.15m.
RESERVORIO
Es un reservorio empotrado en tierra con material impermeabilizante como es el geotextil y geomembrana,
siendo la capacidad de almacenamiento de 270 m3, con estructura de salida de concreto armado f¨c= 210
Kg/cm2, incluido Tubería PVC SAP C-10 de Ǿ de 2”, con sistema de operación de desfogue mediante una
válvula de Ǿ de 2” conectado a un sistema de filtro de estructura de concreto armado.
LATERALES
.- LATERAL 1.- Es la red de conducción primaria encargada de llevar el agua al sector A, mediante tubería PVC
SAP de Ǿ de 2” C-7.5, con una longitud de 180 ml.
.- Red de distribución secundaria.- Es la red que se encarga de distribuir el agua a las parcelas mediantes los
hidrantes, con tubería de PVC SAP de Ǿ de 1”C-7.5
.-LATERAL 2.- Es la red primaria con tubería PVC SAP de Ǿ de 2” C-7.5, encargada de conducir el al sector B,
con una longitud de 260 ml.
.-Red de distribución secundaria.- Es la red encargada de distribuir el agua a las parcelas mediante los
hidrantes, con tubería PVC SAP de Ǿ de 1” C-7.5
Cuadro Nº 1.11
RESUMEN COSTO DE INVERSION DEL PROYECTO
CONSOLIDADO SISTEMAS, CCAPA, CURCA, CONGOTA, PA,PURA Y PATIRARA
I
II
A
B
III
I
II
A
B
III
I
II
A
B
III
I
II
A
B
III
I
II
A
B
III
I
II
A
B
III
Cuadro Nº 1.12
C O S T O D E IN V E R S IO N D E L P R O Y E C T O 1
C R E A C IO N D E L S IS T E M A D E R IE G O T E C N IF IC A D O D E LA S C O M UN ID A D E S C C A P A , C UR C A , C O N G O T A ,
P A M P UR A Y P A T IR A R A D E L D IS T R IT O D E M A R A - C O T A B A M B A S - A P UR IM A C
ALTERNATIV A 1
TOTAL
ITEM DESCRIPCION UND P.U. CANTIDAD TOTAL PRECIO FACTOR PRECIO
PRIVADO SOCIAL
I EXP ED IEN T E T EC N IC O Y EST UD IO 3 5 0 3 6 .3 9 2 8 , 2 9 8 . 19
EXP ED IEN T E T EC N IC O Y EST UD IO 35,036.39 0.80768 28,298.19
II IN F R A EST R UC T UR A 1, 2 8 4 , 6 6 7 . 5 7 8 8 3 ,3 3 7 .3 8
M ANO DE OBRA
470023 OPERADOR DE EQUIPO PESADO hh 13.00 13.40 174.20 0.909 158.3478
470032 TOPOGRAFO HH 12.00 880.82 10,569.84 0.909 9607.98456
470102 OPERARIO HH 13.58 3,788.01 51,441.18 0.909 46760.0288
470103 OFICIAL HH 11.83 2,078.71 24,591.14 0.909 22353.34562
470104 PEON HH 10.64 46,626.53 496,106.28 0.410 203403.5745
470125 PERFORISTA OFICIAL hh 14.00 8.89 124.46 0.909 113.13414
470307 OPERARIO ESPECIALIZADO hh 13.00 18.61 241.93 0.909 219.91437
M ATERIALES
010266 ACARREO DE MATERIALES glb 10.00 1.00 10.00 0.847 8.47
018001 LUBRICANTE PARA TUBERIA TIPO UF gl 85.00 5.36 455.60 0.847 385.89
020007 ALAMBRE NEGRO RECOCIDO # 16 KG 4.00 87.57 350.28 0.847 296.69
020008 ALAMBRE NEGRO RECOCIDO # 8 KG 4.00 32.39 129.56 0.847 109.74
020105 CLAVOS PARA MADERA CON CABEZA DE 3"KG 4.20 1,528.28 6,418.78 0.847 5436.70
020107 CLAVOS PARA MADERA CON CABEZA DE 4"kg 4.20 32.39 136.04 0.847 115.22
021321 CLAVOS PARA CALAMINA kg 7.50 0.70 5.25 0.847 4.45
025103 PERNOS 1/4" X 6" PZA 2.60 12.00 31.20 0.847 26.43
030348 ACERO CORRUGADO FY=4200 kg/cm2 GRADO
KG 60 2.95 914.69 2,698.34 0.847 2285.49
040000 ARENA FINA M3 120.00 6.97 836.40 0.847 708.43
040104 TIERRA DE RELLENO PROPIO m3 10.00 162.54 1,625.40 0.847 1376.71
050004 PIEDRA CHANCADA DE 3/4" m3 100.00 0.79 79.00 0.847 66.91
050011 PIEDRA MEDIANA DE 6" m3 50.00 6.99 349.50 0.847 296.03
050022 GRAVA CANTO RODADO M3 100.00 37.48 3,748.00 0.847 3174.56
050104 ARENA GRUESA M3 120.00 25.61 3,073.20 0.847 2603.00
135102 PEGAMENTO gl 95.00 2,307.18 219,182.10 0.847 185647.24
210000 CEMENTO PORTLAND TIPO I (42.5 kg) BLS 24.00 515.68 12,376.32 0.847 10482.74
270007 GUIA DE AGUA m 1.20 260.14 312.17 0.847 264.41
270211 FULMINANTE und 1.20 466.85 560.22 0.847 474.51
280022 DINAMITA kg 60.00 47.69 2,861.40 0.847 2423.61
290301 YESO KG 0.50 1,185.86 592.93 0.847 502.21
301115 IMPERMEABILIZANTE gl 25.00 9.64 241.00 0.847 204.13
305505 NIVEL TOPOGRAFICO HM 6.00 162.54 975.24 0.847 826.03
320015 FLETE TERRESTRE KG 12,000.00 1.00 12,000.00 0.847 10164.00
350101 GEOTEXTIL x 300 gr. m2 7.00 697.00 4,879.00 0.847 4132.51
360101 GEOMEMBRANA X 1" m2 11.00 697.00 7,667.00 0.847 6493.95
380000 HORMIGON M3 100.00 0.48 48.00 0.847 40.66
380002 HORMIGON DE RIO m3 100.00 2.73 273.00 0.847 231.23
390500 AGUA M3 2.00 486.07 972.14 0.847 823.40
399028 TAPA METALICA 0.30 X 0.30 C/ACCES DE SEG.
pza 40.00 203.00 8,120.00 0.847 6877.64
399904 TAPA METALICA 0.25 X 0.30 M und 30.00 138.00 4,140.00 0.847 3506.58
431652 REGLA DE MADERA P2 2.80 8.77 24.56 0.847 20.80
436030 ROLLIZO DE EUCALIPTO DE 8" X 6.00 m PZA 20.00 4.00 80.00 0.847 67.76
439901 MADERA CORRIENTE PARA ENCOFRADOS p2 2.50 2,158.44 5,396.10 0.847 4570.50
440000 MADERA CORRIENTE CEPILLADA P2 3.20 420.00 1,344.00 0.847 1138.37
440100 ESTACA DE MADERA P2 2.80 1,904.48 5,332.54 0.847 4516.66
519905 REJILLA METALICA A=0.60 X .60 m und 70.00 1.00 70.00 0.847 59.29
541190 PINTURA ESMALTE GL 30.00 162.54 4,876.20 0.847 4130.14
590100 CALAMINA # 30 DE 1.83m X 0.83m X 3mm pza 18.00 70.00 1,260.00 0.847 1067.22
650515 UNION UNIVERSAL DE FIERRO GALVANIZADO
und
DE 1 1/2" 35.70 74.00 2,641.80 0.847 2237.60
660384 ANILLO DE JEBE A-7.5 DE 3" und 4.00 14.00 56.00 0.847 47.43
660386 ANILLO DE JEBE A-7.5 NTP UF 160 mm und 13.50 525.98 7,100.73 0.847 6014.32
720072 TUBERIA PVC SAP PRESION C-10 EC DE 1 1/2"
m 4.96 11,360.30 56,347.09 0.847 47725.98
720301 UNION PVC SAP PARA AGUA CON ROSCA DE
und
3/4" 2.00 276.00 552.00 0.847 467.54
720517 CURVA PVC NTP ISO 4422 de 160 mm X 45°und 180.00 10.00 1,800.00 0.847 1524.60
720524 CURVA PVC NTP ISO 4422 de 160 mm X 22.5°
und 180.00 13.00 2,340.00 0.847 1981.98
720817 TUBERIA PVC NTP ISO 4422 UF 160 mm C-7.5
m 35.80 3,228.41 115,577.08 0.847 97893.79
720829 TUBERIA PVC 3" CLASE 7.5 M 12.86 1,756.00 22,582.16 0.847 19127.09
723040 NIPLE PVC SAP 3/4" X 0.50 M pza 3.00 138.00 414.00 0.847 350.66
723102 ADAPTADOR PVC SAP 1 1/2" und 2.90 74.00 214.60 0.847 181.77
723112 ADAPTADOR PVC SAP 3" und 8.00 14.00 112.00 0.847 94.86
770006 VALVULA COMPUERTA DE BRONCE DE 1 1/2"
und 65.20 37.00 2,412.40 0.847 2043.30
770303 VALVULA DE ACOPLE RAPIDO PE 3/4" und 35.00 138.00 4,830.00 0.847 4091.01
780008 VALVULA COMPUERTA ACERO INOXIDABLE und
3" 1,200.00 17.00 20,400.00 0.847 17278.80
780020 VALVULA COMPUERTA CON BRIDA C-125 ANSI
und 3" 400.00 2.00 800.00 0.847 677.60
780069 VALVULA COMPUERTA FIERRO FUNDIDO TIPO
und MAZZA DE
850.00
3" 7.00 5,950.00 0.847 5039.65
850101 PETROLEO GL 15.00 10.77 161.55 0.847 136.83
EQUIPOS
370239 WINCHA DE 50 m HE 1.00 433.91 433.91 0.847 367.52
375316 BALDE PRUEBA TAPON ABRAZADERA Y ACCESORIOS
he 4.00 109.02 436.08 0.847 369.36
375401 MIRAS Y JALONES he 2.00 109.51 219.02 0.847 185.51
480111 MEZCLADORA DE CONCRETO DE 9 -11p3 hm 12.00 5.23 62.76 0.847 53.16
480800 MOTOBOMBA 10 HP 4" hm 8.00 32.75 262.00 0.847 221.91
489605 CIZALLA PARA CORTE DE FIERRO hm 2.00 3.20 6.40 0.847 5.42
490207 COMPRESORA NEUMATICA 76 HP 125-175 PCM
hm 95.00 8.89 844.55 0.847 715.33
490208 COMPRESORA NEUMATICA 87 HP 250-330 PCM
hm 95.00 13.79 1,310.05 0.847 1109.61
490303 COMPACTADOR VIBRATORIO TIPO PLANCHA
hm5.8 HP 8.00 1.60 12.80 0.847 10.84
490406 CARGADOR RETROEXCAVADOR 62 HP 1 y d3
hm 180.00 2.63 473.40 0.847 400.97
490611 MARTILLO NEUMATICO 24 kg CON CINCEL Y
hmACCESORIOS
6.00 22.68 136.08 0.847 115.26
490701 VIBRADOR DE CONCRETO 4 HP 1.35" hm 6.00 2.48 14.88 0.847 12.60
498803 TEODOLITO HM 8.00 446.91 3,575.28 0.847 3028.26
980101 CARTEL GLB 480.00 0.50 240.00 0.847 203.28
370101 HERRAMIENTAS MANUALES %MO 18,781.51 0.847 15907.94
A C O S T O D IR E C T O 1, 16 7 , 8 7 9 . 6 1 7 7 7 ,7 9 8 .4 3
B G A S T O S G E N E R A LE S 116,787.96 0.90368 105538.94
III S UP E R V IS IO N T E C N IC A 2 9 , 19 6 . 9 9 26,540.06
S UP E R V IS IO N T E C N IC A 29,196.99 0.909 26540.06
C OST O T OT A L P R OYEC T O 1, 3 4 8 , 9 0 0 . 9 4 7 8 9 3 8 , 17 5 . 6 3
Cuadro Nº 1.13
C O S T O D E IN V E R S IO N D E L P R O Y E C T O 1
C R E A C IO N D E L S IS T E M A D E R IE G O T E C N IF IC A D O D E LA S C O M UN ID A D E S C C A P A , C UR C A , C O N G O T A ,
P A M P UR A Y P A T IR A R A D E L D IS T R IT O D E M A R A - C O T A B A M B A S - A P UR IM A C
ALTERNATIV A 1
TOTAL
ITEM DESCRIPCION UND P.U. CANTIDAD TOTAL PRECIO FACTOR PRECIO
PRIVADO SOCIAL
CO S T O D E IN V E R S IO N D E L P R O Y E CT O 1
C R E A C IO N D E L S IS T E M A D E R IE G O T E C N IF IC A D O D E LA S C O M UN ID A D E S C C A P A , C UR C A , C O N G O T A ,
P A M P UR A Y P A T IR A R A D E L D IS T R IT O D E M A R A - C O T A B A M B A S - A P UR IM A C
ALTERNATIV A 1
TOTAL
ITEM DESCRIPCION UND P.U. CANTIDAD PRECIO FACTOR TOTAL PRECIO
PRIVADO SOCIAL
C O S T O D E IN V E R S IO N D E L P R O Y E C T O 1
C R E A C IO N D E L S IS T E M A D E R IE G O T E C N IF IC A D O D E LA S C O M UN ID A D E S C C A P A , C UR C A , C O N G O T A ,
P A M P UR A Y P A T IR A R A D E L D IS T R IT O D E M A R A - C O T A B A M B A S - A P UR IM A C
ALTERNATIV A 1
TOTAL
ITEM DESCRIPCION UND P.U. CANTIDAD PRECIO FACTOR TOTAL PRECIO
PRIVADO SOCIAL
Cuadro Nº 1.16
CO S T O D E IN V E R S IO N D E L P R O Y E CT O 1
C R E A C IO N D E L S IS T E M A D E R IE G O T E C N IF IC A D O D E LA S C O M UN ID A D E S C C A P A , C UR C A , C O N G O T A ,
P A M P UR A Y P A T IR A R A D E L D IS T R IT O D E M A R A - C O T A B A M B A S - A P UR IM A C
ALTERNATIV A 1
TOTAL
ITEM DESCRIPCION UND P.U. CANTIDAD PRECIO FACTOR TOTAL PRECIO
PRIVADO SOCIAL
El Costo Total del Proyecto a precios de mercado se detalla en el cuadro Nº 1.5. El costo total
es de S/. 4´216,844.69 Soles, con precios vigentes al mes de mayo del año en curso,
Incluye el costo del expediente técnico, construcción de la infraestructura, supervisión de
obra y gastos de gestión del programa. Ver cuadros 1.17.
T O T AL T O T AL
IT E M D E S C R IP C IO N
P R E C IO S P R E C IO S
P R IV A D O S S O C IA LE S
I
II
A
B
III
T O T AL T O T AL
IT E M D E S C R IP C IO N
P R E C IO S P R E C IO S
P R IV A D O S S O C IA LE S
I
II
A
B
III
T O T AL T O T AL
IT E M D E S C R IP C IO N
P R E C IO S P R E C IO S
P R IV A D O S S O C IA LE S
I
II
A
B
III
T O T AL T O T AL
IT E M D E S C R IP C IO N
P R E C IO S P R E C IO S
P R IV A D O S S O C IA LE S
I
II
A
B
III
T O T AL T O T AL
IT E M D E S C R IP C IO N
P R E C IO S P R E C IO S
P R IV A D O S S O C IA LE S
I
II
A
B
III
T O T AL T O T AL
IT E M D E S C R IP C IO N
P R E C IO S P R E C IO S
P R IV A D O S S O C IA LE S
I
II
A
B
III
G. BENEFICIOS
Los Beneficios del proyecto, se obtienen del VNP, luego de haber logrado un ligero
incremento en los rendimientos de los cultivos que componen la cedula analizada. En la
Programa Subsectorial de Irrigaciones Página 16
“Creación del Sistema de Riego Tecnificado de las Comunidades, Ccapa, Curca, Congota, Pampuya
Y Patirara del Distrito de Mara-Cotabambas-Apurímac”
Año Año Año Año Año Año Año Año Año Año Año Valor
Concepto
0 1 2 3 4 5 6 7 8 9 10 Actual
Ingresos incrementales del proyecto 0.00 852,118.85 852,118.85 852,118.85 852,118.85 852,118.85 852,118.85 852,118.85 852,118.85 852,118.85 852,118.85 5,468,607
Incremento en el valor neto de la producción 0.00 852,118.85 852,118.85 852,118.85 852,118.85 852,118.85 852,118.85 852,118.85 852,118.85 852,118.85 852,118.85
Valor Neto de la Produccion Con Proyecto 0.00 433,425.95 433,425.95 433,425.95 433,425.95 433,425.95 433,425.95 433,425.95 433,425.95 433,425.95 433,425.95
Valor Neto de la Produccion Sin Proyecto 0.00 -418,692.90 -418,692.90 -418,692.90 -418,692.90 -418,692.90 -418,692.90 -418,692.90 -418,692.90 -418,692.90 -418,692.90
Costos incrementales del proyecto 3,611,365.25 12,690.00 12,690.00 12,690.00 12,690.00 12,690.00 12,690.00 12,690.00 12,690.00 12,690.00 12,690.00 3,692,805.33
Costo de Inversion 3,611,365.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Infraestructura de Riego 3,415,585.96
Supervision 77,626.94
Expediente Tecnico 93,152.35
Gestión del Programa 25,000.00
Costo de Operación y Mantenimiento 12,690.00 12,690.00 12,690.00 12,690.00 12,690.00 12,690.00 12,690.00 12,690.00 12,690.00 12,690.00
Costo de Operación y Mantenimiento Con Proyecto 12,690.00 12,690.00 12,690.00 12,690.00 12,690.00 12,690.00 12,690.00 12,690.00 12,690.00 12,690.00
Costo de Operación y Mantenimiento Sin Proyecto 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
FLUJO NETO -3,611,365.25 839,428.85 839,428.85 839,428.85 839,428.85 839,428.85 839,428.85 839,428.85 839,428.85 839,428.85 839,428.85 1,775,801.77
FACTOR DE ACTUALIZACIÓN 1.000 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422
VALOR ACTUAL NETO -3,611,365.25 770,118.21 706,530.47 648,193.09 594,672.56 545,571.16 500,524.00 459,196.33 421,281.03 386,496.36 354,583.82 1,775,801.77
TASA INTERNA DE RETORNO 19.25%
RELACIÓN BENEFICIO/COSTO 1.48
Año Año Año Año Año Año Año Año Año Año Año Valor
Concepto
0 1 2 3 4 5 6 7 8 9 10 Actual
Ingresos incrementales del proyecto 0.00 911,824.57 911,824.57 911,824.57 911,824.57 911,824.57 911,824.57 911,824.57 911,824.57 911,824.57 911,824.57 5,851,778
Incremento en el valor neto de la producción 0.00 911,824.57 911,824.57 911,824.57 911,824.57 911,824.57 911,824.57 911,824.57 911,824.57 911,824.57 911,824.57
Valor Neto de la Produccion Con Proyecto 0.00 573,313.86 573,313.86 573,313.86 573,313.86 573,313.86 573,313.86 573,313.86 573,313.86 573,313.86 573,313.86
Valor Neto de la Produccion Sin Proyecto 0.00 -338,510.72 -338,510.72 -338,510.72 -338,510.72 -338,510.72 -338,510.72 -338,510.72 -338,510.72 -338,510.72 -338,510.72
Costos incrementales del proyecto 2,527,948.68 5,373.51 5,373.51 5,373.51 5,373.51 5,373.51 5,373.51 5,373.51 5,373.51 5,373.51 5,373.51 2,562,434.02
Costo de Inversion 2,527,948.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Infraestructura de Riego 2,360,898.50
Supervision 70,562.89
Expediente Tecnico 75,237.29
Gestión del Programa 21,250.00
Costo de Operación y Mantenimiento 5,373.51 5,373.51 5,373.51 5,373.51 5,373.51 5,373.51 5,373.51 5,373.51 5,373.51 5,373.51
Costo de Operación y Mantenimiento Con Proyecto 5,373.51 5,373.51 5,373.51 5,373.51 5,373.51 5,373.51 5,373.51 5,373.51 5,373.51 5,373.51
Costo de Operación y Mantenimiento Sin Proyecto 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
FLUJO NETO -2,527,948.68 906,451.06 906,451.06 906,451.06 906,451.06 906,451.06 906,451.06 906,451.06 906,451.06 906,451.06 906,451.06 3,289,343.97
FACTOR DE ACTUALIZACIÓN 1.000 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422
VALOR ACTUAL NETO -2,527,948.68 831,606.48 762,941.73 699,946.54 642,152.79 589,131.00 540,487.15 495,859.77 454,917.22 417,355.25 382,894.73 3,289,343.97
TASA INTERNA DE RETORNO 33.93%
RELACIÓN BENEFICIO/COSTO 2.28
El resultado de la evaluación social del Proyecto, determina que el Proyecto desde el punto de
vista social es RENTABBLE, presenta un VAN, de S/. 3´289,343.97 soles y una tasa interna
de retorno TIR de 33.93 %, además presenta un ratio beneficio costo de 2.28, indicadores de
rentabilidad que señalan que la puesta en marcha el proyecto va a contribuir al desarrollo
social de los agricultores usuarios del Canal Succa, Ccorihuayrachina y Batanpampa, Ver
Cuadro 1.11
Cuadro Nº 1.20
VAN TIR
ALTERNATIVA B/C
(S/.) (% )
Autoridad Nacional del Agua ANA, institución del Ministerio de Agricultura descentralizada a
nivel nacional a través de los Autoridades Locales del Agua ALA de Cusco en la región Cusco,
institución que autoriza la certificación hídrica del proyecto y realiza el cumplimiento de ella,
recepciona la obra conjuntamente con los beneficiarios, participa en los talleres de
capacitación de operación y mantenimiento y es quien en la etapa de operación y
mantenimiento asesora a los usuarios de Riego del canal Succa y Ccorihuayrachina.
Los beneficiarios representados por los usuarios del canal Succa y Ccorihuayrachina,
son administradores de las actividades de operación y mantenimiento de la infraestructura de
riego.
Impactos Ambientales
2. Medidas Mitigadoras
Riego con agua todas las superficies de actuación (vías de acceso, lugares de
construcción) de manera que estas se mantengan húmedas lo necesario para evitar
en lo posible la producción de polvo.
Por otro lado, las labores de supervisión y seguimiento del proceso constructivo, estará a
cargo un profesional especializado del staff de la empresa que el PSI ha contratado para las
labores de seguimiento, supervisión y asesoría en obras hidráulicas. El Supervisor de la Obra
será el encargado de hacer cumplir las metas del proyecto, controlar y verificar el
cumplimiento de las especificaciones técnicas, diseños definitivos y calidad de la Obra.
El Plan de Implementación del proyecto (ver cuadro D), comprende diversas actividades o
procesos que se complementan a fin de llevar a cabo el proyecto desde el inicio hasta su
culminación satisfactoria, y considera las siguientes actividades:
Cuadro Nº 1.21
MESES
ITEM DESCRIPCION
1 2 3 4 5 6 7 8 9 10 11 12
4 GASTOS GENERALES
7 EVALUACION POST
M. CONCLUSIONES Y RECOMENDACIONES
El problema afecta a 257 familias y 206.00 has de tierras agrícolas con baja producción que los
mantiene en la pobreza
d. La alternativa 1 plantea para la solución del problema la creación de los cinco Sistemas de Riego
tecnificado con todo sus componentes y con una eficiencia de riego de 64.8% con lo que se permite
incrementar la producción agrícola en 206.00 has y se beneficiaran 257 familias, para ello se ha
considerado describir los aspectos técnicos en las actividades de infraestructura de riego y capacitación
en operación y mantenimiento.
g. De acuerdo a la evaluación social se tiene indicadores aceptables y viables tal como se puede apreciar:
Cuadro Nº 1.22
Indicadores de rentabilidad a precios privados
VAN TIR
ALTERNATIVA B/C
(S/.) (%)
Cuadro Nº 1.23
Indicadores de rentabilidad a precios sociales
VAN TIR
ALTERNATIVA B/C
(S/.) (%)
Cuadro Nº 1.24
Indicadores de rentabilidad a precios privados
VAN TIR
ALTERNATIVA B/C
(S/.) (% )
Cuadro Nº 1.25
Indicadores de rentabilidad a precios sociales
VAN TIR
ALTERNATIVA B/C
(S/.) (% )
j. El Financiamiento del proyecto será por PSI, con la Fuente Recursos Ordinarios y un presupuesto de S/.
3´062,383.32 que representa el 85.39% y los Beneficiarios con un monto de S/. 523,981.93 que
representa el 14.61 %.
l El proyecto es sostenible debido a que los beneficiarios se han comprometido mediante acta que se
adjunta aportar el 15% de la contrapartida de la inversión del proyecto, así mismo mediante acta los
beneficiarios se han comprometido para cubrir los costos de operación y mantenimiento del sistema de
riego una vez concluida la ejecución de la obra.
Por otra parte el PSI, cuenta con la disponibilidad de recursos económicos para cofinanciar la obra,
además de tener la capacidad técnica para orientar a los beneficiarios a ejecutar el proyecto bajo la
modalidad de obra comunitaria
N.
MARCO LÓGICO
Cuadro Nº 1.26
OBJETIVOS INDICADORES FUENTES VERIFICABLES SUPUESTOS
-Mayor desarrollo Incremento del Valor Neto de la Registro estadístico del MINAG
agrícola en los Sectores Producción agrícola anual en S/.
FIN de Riego Ccapa, Curca, 852,118.85 después de un año de
Congota, Pampura y implementado el proyecto
Patirara
-Incremento de los Se incrementa la producción agrícola, -Evaluaciones y Estadísticas del Existe estabilidad económica y
rendimientos y estimado de 463.05 TN a 1,368.30 TN al MINAG política en el estado, quien
producción agrícola en año, después del primer año de -Informes de evaluación entidad cumple un rol promotor de la
PROPÓSITO
un 10-20% implementado el proyecto. ejecutora. actividad agropecuaria.
-Ficha de Seguimiento de las
familias involucradas.
Eficientes A.-Incremento de 1,708,268 MC de -Se tiene suficiente
infraestructuras de volumen de agua después del primer - Informe de evaluación del ALA y conocimiento en manejo de
riego. año de ejecutado el proyecto. del MINAG. cultivos tradicionales y
B.- Incremento de la eficiencia de alternativos.
conducción de 19.96 a 34.80 % , después -Informe de Evaluación entidad Se mejora el manejo de agua a
RESULTADOS del primer año de ejecutado el proyecto. ejecutora. nivel parcelario.
a1.Construccion de S.R a1- Se elabora el expediente técnico a un a1- Liquidación de obra: Informe
Ccapa. costo de 93,152.35 durante dos meses de avance físico valorizado de
a2.Construccion calendarios. obra.
S.R.Curca A2-Se invierte S/ 3,586,365.25 en la
a3.Construcion S.R. construcción de la infraestructura de a2. Acta de conformidad de obra.
Congota. riego de los 5 Sistemas de Riego (incluye
a4.Construccion S.R supervisión), en el primer trimestre de ha
Pampura implementado el proyecto. -Los usuarios asumen los gastos
ACTIVIDADES a5.Construcción S.R . de operación y mantenimiento
Patirra. de la infraestructura hidráulica.