You are on page 1of 4
cp ps ate a STG FP AE FA EXPANSIVE MORTAR SPLITSTAR® FOR DEMOLISHING AND CUTTING ROCKS AND CONCRETES Demolition of rock and natural stone PEPE eta, CAE © Controlled Demolition * Dust Free Vibration Free + No License Required © No Flying Debris * No Toxic Fumes Environmental Friendly lent Operation Rapid Usability © Economy a - Safety for Vicinity eee nett ts i paired BESTLINK : en ee is a highly expansive mortar to demolish and cut rocks and concretes.l swells when poured Into_a hole and develops a pressure higher than 6OMP{800Kg/cm}on the hole walls after mixed with clean ‘and cold water thereby breaking them open. is environmentally friendly because i releases no toxc fumes or harmful substances of any kind So tis called a Highly Soundless Cracking Agent(HSCA). Ibis non-explosive; therefore supervision of trained personnel is not essential Demolition and cuting are allowed to be used according to working scheme, ‘can gain high yield for mining of granite marble etc. ts very to Cush or remain renfofced concrete structures on demand ‘duting demolition Easy to operate at ob site KUMI AOR RIOTS, ELC — Ae zo0UOM ACE mE ALE 1) BUENA, FATT A A. AT RNR TIAA FR ASE TRACER, ASSERT, MARC, TERT RYE Ath Cts OFURSPRNCEAG, TAS AYDRISTAR® ) TRA A BUA SRL SRO eS HA ERR A A WFAA AAMT, ANH. JP FURUHREIRTT. VR. UGH, RN ABEREDA, ee aaa FR, Lear. CAS CLR, LRA AR PC A re aR ‘A. Depending on usable ternperature,there are four type of to be supplied ALTER T AA FL FCP TYPES 5 USABLE TEMOERATURE Sia SCA1 (summer) 250°C (77-1087) SCA-2 (spring & fall) 4025°C (S0T-77T) SCA3 (winter) SA0°C (25-50) 8 's akind of inorganic materials consisted of calcium, siliconjron and aluminum in the form of powder. ©. “expansive mortar should be filed into the holes on rock or concrete. The expansive force can break the rocks or concrete within 2-8 hour. . ‘are packed in moisture proof boxes and each box contains four plastic bags, each of which Loads 5 kg powder. That is 20 kg outer perbox The guarantee period is one year under dry storage. fH, DAVE TT /LeL, HATRED Fr Ata. EERIE. Hole diameter and hole space /cistance,hole dlamerer 30-S0mm hole space in accordance with the follwing formula, A=KD Where . A-hole space (MM), D-Diameter(MM) K-Cracking coeffucuent K value of rocks and concrete #4) Midst 1K iH % Meith [MATERRIALS TOBE CSAGKED Hi | K Vale | STEELCONTAIN(KGING) WAH [Sot Vigin rocks 245 10-16 Middle hard vigin rocks ‘#2: a-12 [Hard vigin rocks mer 5-10 [Piain concrete siz | 10-16 | 030 8-10 | 060 6-8 60-100 [Reinforced concrete i te K value changes along with the geometry and shape of rock & concrete Free surface ft a a x B 2 bigger | K 3 & WHEE XN ‘The less fee surface the smaller K calue. ‘The more free surfacethe bigger K Valve. cari, Kita ahaa, KEK, Pre-drilled hole design table #71. iit 8% #48 Fale SesanT TTT CEO Dineleritren) | Hole specail Depa Beltane querying KAT 78-38 700-3060 705% of Hehe Hard stone quanying PERT? 3040 200.3000 Tema Hatt ‘Stone eiting 7638 200-4060 Soik oF Height Pian cnereto donation 60K 1 3040 300.5000 20% af Height Reinforced concrete deriton HIDE! 36-40 160-300 20% af Height Reference consumption of SPLITSTAR’ fi Heit aca Hole dameter ihm) Re ee Censumpien (kg) 1213 15 17 19 21 23 25 28 30 32 le dent im) 1 How do you use SPLITSTAR® SIAC th ETI ANE AKO SPLIT-AG is 8 powder that must be thoroughly mixed with clean water before use, in a ratio of 30% of the overall weight. Put the required amount of water into a large container(1.5 litred for leach 5 KG package), carefully add the powder to water and stiring itto make the mortar smooth and lump-free.Pour the mortar into the prepared holes within § to10 minutes.lt's easy to pour SPLIT-AG into slope horizontal holes. Make sure the holes are dry before pouring mortarIf the hole is not dry, the leak out might happen. Use 2 piece of soft sponge to cover the hole when the leaking out happens, but do net plug the hole.Cover the holes with a waterproof sheet when trains Instruction for use at job site Drilling: Drill holes with the pneumatic rock drill according to the design of demolition 8 Preparation for mixing: 10-20 litres plastic or metal barrel, enough spuirsvar’ rubber glove protective glasses C.Mixing: pour about 1.5 liter clean water into a container and slowly add one bag of sPursran™ into the water Keep stirring the mix until it becomes lump-free slurry, D Filling-dry the holes before filling, fil the spurrsraR® into the holes within 10 minutes after the ‘mixing with water. For horizontal holes, you may re-pack SPLITsran” into cartridges and fll them into the holes, or fil the holes with thick paste of SPusran’, and you may also choose grouting pump. E Cracking: the orack appears in 2-8 hours after fling, The speed of cracking depends on the temperature and the hardness of rocks and concretes. 1 HEARING, AE Ac Ra 2. REAPER, WMT, LIRLAL ee rbeab A eR RAH RURAL BRI LAE AE RLM SONA CORDA BIA Bia HORNE RAY it, eet, sa LC 2 PHAR, 425 ERISA AL yf 49-8 AYP UE. RIK ZF ETE GREAT orev EE seeeEa Safety Precaution “4: bid" ‘SAFETY PREVEBTION AGAINST BLOW-OUT SHOTS 2) SPLITSTAR’ fsa highly alkaline product, pH reaches 13 after contact with water and can cause saver initation to mucous membranes,especially eyes. 'b) Wear safety goggles, rubber gloves and helmet during SPUrstaR” handing, mixing and filing ©) Wear a dustoroof mask when using SPLrSTARin poorly ventilated areas such as tunnels or mines. sy 6) Do not get your face lose to or stand near filed holes for at least 3 hours afer filing completion ) Keep people away from jb site after filing. oa 1) Sheter the hoes from job site after ling womens 19) Skin contact with SPLITSTAR® must be rinsed off with large amounts of cold water immediately. hh) Eye comtact with SPLITSTAR” must be rinsed off wth large amounts of cold water immediately without roubing. Consulta doctor quickly FRAC MRR RUA ETERS CoO, ICPSR RAE RO MRCAOM, IRAE, ETT AEC AC, PER TENRSNRE CPU13) AERA. AUTEUR REAR, MATTER ANALY SFFNY do AAA CAC CAMEL mA PEL LAGAN IAC. UR ALEC TE RAL EEA, ROY — HURL, MBER BEAK, ICEL ANAT PTE HL ‘cH A ut ML LA. BATU MICA ARFRG. LCL VENER BCE, Tea 2k, Teh AMARA ea ORC ea Ite, WE. MAL, TR, EI, AINA eA BL. CHAT USER, DILDO CRE, MAREE, RR, BEL SESUROAL. UR. TATE MIL AREAL. RINE A RRL PACE MRAP, “EIELOLALTTIRCaO(OON) ib ARIGETAL, BILAL, FROM A DEMOLITION Block E,Gaogi Industrial Zone, HuliDistict Xiamen China 3610 \wwnw.quarryingtools.com le wm ® Tol:+86 592 5682036 /5601702 Fax:+86 592 5601703 E-maitinfo@quarryingtools,

You might also like