You are on page 1of 1

ASPEN VISION DEVELOPMENT SDN BHD Doc. Ref.

: AVD/PD/DW
Rev. No. : 0
FORM
ISO Issue Date : 15TH SEPT 2017
DRAINAGE WORKS (BRICKWALL) INSPECTION CHECKLIST Page : 1 of 1

Project :
Project Ref. : Location : :

Contractor : Drawing Ref. : :

Block/Unit No. : Date & Time :

No. Items to be checked Acceptability Remarks


YES NO
1 Material used as per approval

2 Brick shall be hard and consistent size

3 Setting out (pegging of drain center line at 30m


interval and location of culvert)
4 Excavation surface shall be even and firm. Free from
water, soft layer and loose material
5 Concrete grade for drain base slab

6 Check excavation depth, level and gradient

7 Reinforcement, concrete base thickness and width,


wall thickness and drain width as per design
8 Bricks are wetted before laying

9 Mortar for brick laying in 1:3 (or as specified)

10 Check evenness and verticality of brick


11 Brick laid in level with proper bonding

12 Level of the top brick wall.

13 Plastering using mortar 1:3 or as specified


14 Strut and weep hole provided as specified

15 Opening and scupper drain at every 6m or as


specified
16 Backfilling and compaction
17 No stains and mortar drop at glazed surface

18 Scupper sump to flush with road finish level

STATUS : YES - Acceptable NO – Unacceptable


Non-Conformance : Correction :

Re-inspection : Remarks :

Checked By : [Consultant’s Rep.] Verified By : [Client’s Rep.]

Signature : ………………………. Signature : ……………………….


Name : Name :
Date : Date :