Highways Development Project (NHDP) Phase III on DBFOT (Toll ) basis.
Independent Engineer : AARVEE ASSOCIATES ARCHITECTS ENGINEERS & CONSULTANTS PVT. LTD.,
Concessionaire : HAMPI EXPRESSWAYS PRIVATE LIMITED
7 5.0
5 0.0
f(x) = 0.7620752148x
2 5.0 R² = 0.9984113503
0 .0
0 20 40 60 80 100 120 140 160 180 200 220 240
100.0
OutPut(TPH)
R² = 0.9889524444
OutPut(TPH)
50.0
25.0
OutPut(TPH)
50.0
50.0 f(x) = 0.6521723127x
25.0 f(x) = 0.7009401549x 25.0 R² = 0.9943805947
R² = 0.9967749011
0.0 0.0
0 20 40 60 Gate80Openening
100 - 120 140
20mm Bin 160 180 200 220 240 0 20 40 60 Gate80 100 -120
Openening 40mm140
Bin 160 180 200 220 240
Independent Engineer : AARVEE ASSOCIATES ARCHITECTS ENGINEERS & CONSULTANTS PVT. LTD.,
Water Calibration :
1) Gradation
Percentage of Passing Specific
IS Sieve (mm) Mid Value
Sample - 1 Sample - 2 Sample - 3 Sample - 4 Sample -5 Average Limit
2) Water Absoption.
3) Flakiness Index (%)
4) Elongatin Index (%)
5) Flaki & elongtion (Combind) (%)
6) A.I.V (%)
7) Los Angeles Abrasion Value (%)
8)Maximum dry Density (gm/cc)
9)Optimum Moisture Content (%)
10) Liquid Limit (%)
11) Plastic Limit (%)
12)Final Bin Openings for ______ TPH Production
Bin Opening
S.No Bin No Type of Material TPH/Hour
Time
6 Reveloution 149 sec.
1 Revolution 24.83 Sec
One Hour 3600 Sec
M/Hr 4305.50 m/hr
40mm
Gate in mm Kg/m TPH
100 2.909 12.525
150 3.541 15.246
200 4.251 18.303
250 6.399 27.551
20mm
Gate in mm Kg/m TPH
75 2.312 9.954
100 3.471 14.944
150 4.843 20.852
200 8.016 34.513
12.5mm
Gate in mm Kg/m TPH
50 1.621 6.979
100 3.512 15.121 12.525 100
150 5.3 22.819 15.246 150
200 7.266 31.284 18.303 200
27.551 250
Stone Dust
Gate in mm Kg/m TPH
75 4.076 17.549
100 4.657 20.051
150 7.681 33.071
200 11.607 49.974
250 12.348 53.164
284.91
129165.1
27 250
24 222.2222
Four Laning of Hospet - Chitradurg Section of NH-13 (New NH-50) from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Development Project (NHDP)
Phase III on DBFOT (Toll ) basis.
From Graph
Plant Speed
Size of Blending Remarks
100 T/Hr (50% Effic.) 150 T/Hr (75% Effic.) 180 T/Hr (90% Effic.) 200 T/Hr (100% Effic.)
Aggregates (%)
Qty Gate Ope. Qty Gate Ope. Qty Gate Ope. Qty Gate Ope.
40 mm 33 33 51 50 76 59 91 66 101
20 mm 19 19 27 29 41 34 49 38 54
10 mm 15 15 20 23 30 27 35 30 39
Stone Dust 33 33 30 50 45 59 54 66 60
Water 4.95 4.95 29 7 44 9 55 10 58