Tulangan Geser
Vs/S = 0.431
BAHAN STRUKTUR
Kuat tekan beton fc' = 35
Tegangan leleh baja (deform) u/ Tulangan Lentur fy = 400
Tegangan leleh baja (polos) untuk tulangan geser fy = 240
Modulus Elastisitas Es = 200000
DIMENSI BALOK
Lebar balok b= 200
Tinggi balok h= 300
Diameter tulangan (deform) yang digunakan D= 19
Av 283.528737
Diameter sengkang (polos) yang digunakan Æ= 10
Luas tulangan sengkang Av = 78.53981634
Tebal besrsih selimut beton ts = 50
d d= 230.5
L L= 5000
GAYA GESER RENCANA
Mu+ = 20
= 20000000
Mu- = 20
20000000
Vu+ 25
Vu- = 6
rmin = 0.147901995
Jadi digunakan r min = 0.0035
�_𝑚�𝑘𝑠=((0,0003+𝑓_𝑦/𝐸_𝑠)/0,008) �_𝑏
rmaks = 0.00100625
�_𝑚�𝑘𝑠=0,625�_𝑏, .....u/ 𝑓𝑦=400 𝑀𝑃�
rmaks = 0.0223125
` r maks = 0.0223125
�_(𝑠 𝑚�𝑘𝑠)=�_𝑠1=�_𝑚�𝑘𝑠 𝑏� As1 = 1028.60625
Gunakan f= 0.9
�_(𝑢 𝑚�𝑘𝑠)=𝜙�_𝑚�𝑘𝑠 𝑓_𝑦 (1−(�_𝑚�𝑘𝑠 𝑓_𝑦)/(1,7𝑓^′ 𝑐))
Ru maks = 6.827625
𝑀_𝑢𝑖=�_(𝑢 𝑚�𝑘𝑠) 𝑏�^2 Mu1 = 72550684.63
= 72.55068463
TULANGAN LAPANGAN
Mui < Mu = Tidak Perlu Tulangan Tekan
�=(𝑓^′ 𝑐)/𝑓𝑦 [1−√(1−(4𝑀_𝑢)/(1,7𝜙𝑓𝑐^′ 𝑏�^2 ))]
= 0.006383742
As=r.b.d As = 294.2904985
= 1.037956511
Jadi digunakan tulangan » 2
TULANGAN TUMPUAN
Mui < Mu = Tidak Perlu Tulangan Tekan
�=(𝑓^′ 𝑐)/𝑓𝑦 [1−√(1−(4𝑀_𝑢)/(1,7𝜙𝑓𝑐^′ 𝑏�^2 ))]
= 0.006383742
As=r.b.d As = 294.2904985
= 1.037956511
Jadi digunakan tulangan » 2
As terpakai 567.057474
MPa
MPa
MPa
MPa
mm
mm
mm
mm2
mm
mm
mm
mm
mm
KN-m
Nmm
KN-m
Nmm
KN
KN
mm2
N
KN-m
mm
D 19
mm
D 19
BAHAN STRUKTUR
Kuat tekan beton fc' = 35 MPa
Tegangan leleh baja (deform) u/ Tulangan Lentur fy = 400 MPa
Tegangan leleh baja (polos) untuk tulangan geser fy = 240 MPa
DIMENSI BALOK
Lebar balok b = 200 mm
Tinggi balok h = 300 mm
Diameter tulangan (deform) yang digunakan D = 19 mm
Diameter sengkang (polos) yang digunakan Æ = 10 mm
Luas tulangan sengkang Av = 78.53981634 mm
Tebal besrsih selimut beton ts = 50 mm
d d = 230.5 mm
L L = 5000 mm
GAYA GESER RENCANA
Vu+ = 25 KN
Vu- = 25 KN
KOEFISIEN
Faktor l
Beton Normal l = 1
Beton Ringan l = 0.85
Beton Ringan Total l = 0.75
f f = 0.75
faktor tekuk k =
Panjang Kolom L =
�=√(𝐼/�)
Radius Girasi, r =
atau r= 0,25*h r =
(𝑘𝑙_𝑢)/�≤22
=
=
Berdasarkan analisa diatas kolom ini termasuk =
=
cm =
Pu =
𝐸_𝑐=4700√(𝑓^′ 𝑐) Ec =
Es Es =
Momen Inersia Bruto Ig =
Momen Inersia Tulangan Baja Ise =
Beban Mati D =
Beban Hidup L =
𝛽_�𝑛𝑠=(𝑏𝑒𝑏�𝑛 𝑡𝑒𝑡�𝑝 �𝑘𝑠𝑖�𝑙 𝑡𝑒�𝑓�𝑘𝑡𝑜� 𝑚�𝑘𝑠)/(𝑏𝑒𝑏�𝑛 �𝑘𝑠𝑖�𝑙 𝑡𝑒�𝑓�𝑘𝑡𝑜� 𝑚�𝑘𝑠)=(1,2 𝐷)/(1,2 𝐷+1,6𝐿)
=
𝐸𝐼=(0,4𝐸_𝑐 𝐼_𝑔)/(1+𝛽_�𝑛𝑠 )
EI =
𝑃_𝑐=(𝜋^2 𝐸𝐼)/(��_� )^2
Pc =
�_𝑛𝑠=𝐶_𝑚/(1−𝑃_𝑢/(0,75𝑃_𝑐 ))≥1
dns =
�_𝑛𝑠≥1 =
PENULANGAN KOLOM
Mu =
Mc =dsn x Mu =
Mn perlu =
Pn perlu =
Eksentrisitas = Mn perlu/Pn perlu e =
e min = 15 + 0,03.h e min =
Syarat e min £ e =
�_𝑛=𝑃_𝑛/(𝑓^′ 𝑐�_𝑔 )
Kn =
�_𝑛=(𝑃_𝑛 𝑒)/(𝑓^′ 𝑐�_𝑔 ℎ)=�_𝑛 (𝑒/ℎ)
Rn =
r =
Luas tulangan Ast =
Jumlah tulangan n =
»
35 MPa
400 MPa
240 MPa
200000 MPa
300 mm
300 mm
90000 mm2
675000000 mm4
22 mm
380.1327111 mm2
12 mm
113.0973355 mm
50 mm
227 mm
6400 mm
110 KN
110000 N
20 KN-m
20000000 N-mm
1
6400
86.60254038
75
73.90083446
85.33333333
Kolom Langsing
1
110000 N
27805.57498 MPa
200000 MPa
675000000 mm4
1433 kg/m2
479 kg/m2
0.691713596
4.43781E+12
1069322.246 N
1.158961448
OK
20000000 N-mm
23179228.95
35660352.24 Nmm
169230.7692 N
210.7202632 mm
24 mm
OK
0.053724054
0.037735822
0.01
900 mm2
2.367594195 x y
20 0.15 0.03
5 0.2 0.04
0.224
0.0448
PERENCANAAN TANGGA
DATA
Tinggi tangga = 500 cm
Lebar Tangga = 200 cm
Lebar datar I = 450 cm
Lebar datar II = 270 cm
Tebal Plat Tangga = 12 cm
Tebal Plat Bordes = 12 cm
Dimensi Bordes =
a = 200 cm
b = 200 cm
Lebar antrade = 30 cm
Tinggi optrade = 20 cm
Jumlah antrede = 15 buah
Jumlah optrade = 16 buah
a = arc tg (200.300) = 0.0102625814
fy = 320 MPa
fc = 25 MPa
Diameter Tulangan = 12 mm
𝑚=𝑓𝑦/(0,85.𝑓𝑐)
= 15.0588235294
�𝑏=(0,85.𝑓𝑐)/𝑓𝑦.𝛽(600/(600+𝑓𝑦))
= 0.0368121603
�_𝑚��=0,75.�_𝑏
= 0.0276091202
�_𝑚𝑖𝑛 = 0.0025
d = h - p - 1/2.f = 94 mm
= 0.008
rada < rmax
rada > rmin
As = rada. b. d = 718.53231511 mm2
Tulangan yang digunakan D = 12 mm
Luas Tulangan = 113.0973355292 mm2
Jarak tulangan = 157.4004858945 mm
» 160 mm
As yang timbul = 706.8583470577 mm2
As yang timbul > As Tidak Aman!!
Jadi, Dipakai tulangan D13 -160
= 0.0037
rada > rmin
rada < rmax
b (lebar) = 150 mm
h (tinggi) = 200 mm
L (panjang) = 2000 mm
= 2m
D (Diameter tulangan Ulir) = 13 mm
Æ (Diameter tulangan Polos) = 8 mm
Tebal Selimut beton = 40 mm
d' = 54.5 mm
d = h - d' = 145.5 mm
fy' = 320 MPa
fy' (Tulangan Sengkang) = 240 MPa
�_𝑚��=0,75.�_𝑏
= 0.0276091202
�_𝑚𝑖𝑛=1,4/𝑓𝑦
= 0.004375
�𝑛=𝑀𝑛/(𝑏.�^2 )
= 4.7602571218 N/mm2
�_���=1/𝑚 (1−√(1−(2.�. ��)/��))
= 0.0171
rada > rmin OK
rada < rmax OK
As = rada. b. d = 372.55 mm2
Dipakai tulangan D = 13 mm
Luas Tulangan = 132.7322896142 mm
Jumlah Tulangan = 356.2845726909 mm
» 350 mm
As terpasang = 379.2351131833
As terpasang > As = AMAN !!
Jadi, Dipakai tulangan = 3 D 13
Vu > Æ Vc OK
Vu < 3.Æ. Vc OK
Jadi, perlu tulangan geser
Æ Vs = Vu-ÆVc 2060 N
�_𝑆𝑝𝑒�𝑙𝑢=(∅�𝑠)/∅
= 3433.3333333333 N
Digunakan sengkang Æ = 8 mm
Av = 2 A = 100.5309649149 mm
𝑆=(�𝑣.𝑓𝑦.�)/(�𝑠 𝑝𝑒�𝑙𝑢)
= 1022.487755775 mm
Smaks= d/2 = 72.75 mm