You are on page 1of 7

4/26/2018 Multiple Choice Questions (MCQ) on Total Quality Management (TQM) – Set 3 - Scholarexpress

Thursday, April 26, 2018

HOME MECHANICAL ENGINEERING QUESTION PAPERS  AUTOMOBILE ENGINEERING

ENVIRONMENTAL SCIENCE MANAGEMENT STUDIES GENERAL STUDIES

MULTIPLE CHOICE QUESTIONS  ONLINE MULTIPLE CHOICE QUESTIONS (MCQ) TESTS

PRIVACY POLICY ABOUT US CONTACT US

Management Studies  

Like us on Facebook Multiple Choice Questions


(MCQ) on Total Quality
scholarexpress.c
1,409 likes Management (TQM) – Set 3
 July 24, 2015  admin

Like Page 13

Be the first of your friends to like th Multiple Choice Questions (MCQ) on Total Quality Management
(TQM) – Set 3

1-Match the following

A. Dr. Deming believes 1. Histogram

Get Email on latest


additions B. Ishikawa development 2. Common causes

Name
C. Type of variation is due to 3. Cause & effect diagram

D. Crosby’s objective of quality 4. To prevent defect


Email *

http://scholarexpress.com/multiple-choice-questions-mcq-on-total-quality-management-tqm-set-3/ 1/8
4/26/2018 Multiple Choice Questions (MCQ) on Total Quality Management (TQM) – Set 3 - Scholarexpress

The correct order is

a. A-4, B-3, C-1, D-2


b. A-3, B-4, C-2, D-1
c. A-4, B-3, C-2, D-1
Subscribe d. A-4, B-2, C-3, D-1

(Ans:c)

 
Categories
2-Match the following

Automobile Engineering (40)


A. Dimension 1. To assess customer satisfaction
B.tech CSE Question Papers (6)
level
B.tech ECE Question Papers (6)
B. Service characteristic 2. Vary from time to time
B.tech First / Second Semester
Question Papers (6)
C. Customer satisfaction 3. Physical facility
B.tech IT Question Papers (4)
survey
B.tech ME Question Papers (6)

Environmental Science (15) D. Poor service is due to 4. Inadequate resource

General Studies (83)

Management Studies (66) The correct order is

MCQ on ages (1) a. A-2, B-3, C-1, D-4


b. A-3, B-2, C-1, D-4
MCQ on area and volume (1)
c. A-3, B-2, C-4, D-1
MCQ on Automobile d. A-3, B-1, C-2, D-4
Engineering (18)

MCQ on Electrical engineering (Ans:)


(9)
 
MCQ on Engineering Drawing
(3) 3-Match the following
MCQ on Fluid machinery /
Turbo machines (1) A. ISO emphasis on 1. ISO – 9000 -2000

MCQ on Fluid mechanics (4) B. ISO 2. Qualified personnel


MCQ on General aptitude (10)
C. Lead assessor 3. International organization for standard
MCQ on General awareness
(24) D. ISO currently in use 4. Prevention

MCQ on General Science (6)

http://scholarexpress.com/multiple-choice-questions-mcq-on-total-quality-management-tqm-set-3/ 2/8
4/26/2018 Multiple Choice Questions (MCQ) on Total Quality Management (TQM) – Set 3 - Scholarexpress

MCQ on height and distance The correct order is


(1)
a. A-4, B-2, C-3, D-1
MCQ on logical reasoning (2) b. A-4, B-3, C-1, D-2
c. A-4, B-3, C-2, D-1
MCQ on Manufacturing
d. A-3, B-4, C-2, D-1
management (25)

MCQ on Manufacturing
(Ans:c)
processes (22)

MCQ on mean, mode and  


median (1)
4-Match the following
MCQ on Mechanical
engineering (8)
A. Quality approach 1. Productivity quality – cost -Delivery
MCQ on mechanics (3)

MCQ on numbers (1) B. Pillar of TQM 2. Continual improvement management


MCQ on percentage (1)

MCQ on Power plant C. Need for TQM is due 3. Employee


engineering (9)

MCQ on pro t, loss and D. TQM focuses on 4. Cut throat competition


discount (1)

MCQ on Refrigeration and air


conditioning (5) The correct order is
MCQ on series (1)
a. A-2, B-1, C-4, D-3
MCQ on simple and b. A-1, B-2, C-4, D-3
compound interest (1) c. A-2, B-1, C-3, D-4
d. A-2, B-4, C-1, D-3
MCQ on speed, distance and
time (1)
(Ans:a)
MCQ on Strength of materials
(10)
 
MCQ on Theory of machines
(10) 5-Match the following

MCQ on Thermodynamics (3)


A. How TQM helps in reducing cost 1. By reducing external
MCQ on work done and time sale
(1)
B. Calibration activity carried in 2. Prevention cost
Mechanical Engineering (120)
company is
PTU Question Papers (5)
C. Quality planning is 3. Appraisal cost
Uncategorized (18)

http://scholarexpress.com/multiple-choice-questions-mcq-on-total-quality-management-tqm-set-3/ 3/8
4/26/2018 Multiple Choice Questions (MCQ) on Total Quality Management (TQM) – Set 3 - Scholarexpress

D. Vender assessment is 4. Appraisal cost

The correct order is

a. A-4, B-1, C-2, D-3


b. A-1, B-4, C-3, D-2
c. A-1, B-2, C-4, D-3
d. A-1, B-4, C-2, D-3

(Ans:d)

6-Match the following

A. MBQA is eligible for 1. Quality & productivity

B. Malcolm balding award seeks 2. Manufacturing organization


improvement in

C. European quality award is for 3. Senior management was


activity involved

D. Common elements of winners 4. Improving efficiency


are

The correct order is

a. A-2, B-1, C-4, D-3


b. A-1, B-2, C-4, D-3
c. A-2, B-1, C-3, D-4
d. A-2, B-4, C-1, D-3

(Ans:a)

7-Match the following

A. Circle symbol 1. Data analysis told

B. Pareto analysis is 2. Average of reading

C. X bar means 3. Binging or end of operation

http://scholarexpress.com/multiple-choice-questions-mcq-on-total-quality-management-tqm-set-3/ 4/8
4/26/2018 Multiple Choice Questions (MCQ) on Total Quality Management (TQM) – Set 3 - Scholarexpress

D. LCT means 4. Lower control limit

The correct order is

a. A-3, B-2, C-1, D-4


b. A-3, B-1, C-2, D-4
c. A-1, B-3, C-2, D-4
d. A-3, B-1, C-4, D-2

(Ans:b)

8-Match the following

A. Dimension 1. To assess customer


satisfaction

B. Service characteristic 2. Inadequate resource

C. Customer satisfaction survey 3. Vary from time to time

D. Poor service is due to 4. Physical facility

The correct order is

a. A-4, B-1, C-3, D-2


b. A-4, B-3, C-2, D-1
c. A-4, B-3, C-1, D-2
d. A-3, B-4, C-1, D-2

(Ans:c)

9-Match the following

A. Forecasts 1. Systematic analysis of work

B. Estimate made by 2. Simplest method of assessment


management

http://scholarexpress.com/multiple-choice-questions-mcq-on-total-quality-management-tqm-set-3/ 5/8
4/26/2018 Multiple Choice Questions (MCQ) on Total Quality Management (TQM) – Set 3 - Scholarexpress

C. Statistical method 3. Based on measures of


productivity

D. Work study method 4. Vary in their degree of


sophistication

The correct order is

a. A-3, B-2, C-4, D-1


b. A-3, B-2, C-1, D-4
c. A-2, B-3, C-4, D-1
d. A-3, B-4, C-2, D-1

(Ans:a)

10-Match the following

A. Process is managed level 1. Process capability

B. Critical process maturity concept 2. Performance is


include model

C. Managed level of process 3. Capability maturity

D. CMM is 4. Process is controlled

The correct order is

a. A-2, B-4, C-1, D-3


b. A-2, B-1, C-3, D-4
c. A-2, B-1, C-4, D-3
d. A-1, B-2, C-4, D-3

(Ans:c)

11-Match the following

A. Simulated decision 1. Unstructured group interaction


http://scholarexpress.com/multiple-choice-questions-mcq-on-total-quality-management-tqm-set-3/ 6/8
4/26/2018 Multiple Choice Questions (MCQ) on Total Quality Management (TQM) – Set 3 - Scholarexpress

games

B. Coaching 2. Acting out managerial problems

C. Committee assignment 3. Guidance through advice /


suggestions

D. Sensitivity training 4. Study of specific organizational


problem

The correct order is

a. A-2, B-4, C-3, D-1


b. A-2, B-3, C-1, D-4
c. A-2, B-3, C-4, D-1
d. A-3, B-2, C-4, D-1

(Ans:c)

12-Match the following

A. The quality manual have 1. Employee

B. Kaizen is 2. Small change

C. Quality circle can solve problem 3. Level 3


related to

D. Quality circle benefit to 4. Continuous


improvement

The correct order is

a. A-2, B-3, C-4, D-1


b. A-3, B-2, C-1, D-4
c. A-3, B-4, C-2, D-1
d. A-3, B-2, C-4, D-1

(Ans:)

http://scholarexpress.com/multiple-choice-questions-mcq-on-total-quality-management-tqm-set-3/ 7/8