You are on page 1of 3

UB533X210X138kg/m' SB3 edge beam UB 457x1

D 549.1 mm D
B 213.9 mm B
T 23.6 mm T
t 14.7 mm t
A 19,000 mm² A
Iy 92,492 cm4 Iy
Iz 3,868 cm4 Iz
Zy = 3,139 cm3 Zy =
L= 11,300 mm L=
beff = 1,412.50 mm if mid span change to L/4 beff =
fck 14.0 MPa fck
fcd 9.33 MPa fcd
fy 345 MPa fy
hc 90 mm hc
hp 60 mm hp

Compression resistance of concrete slab


Nc,f = hc beff (0.85fcd)
Nc,f = 1008.525 kN

Tensile resistance of steel section


Npl,a = Aa fyd
Npl,a = 6555 kN

PNA in steel beam web

PNA in concrete slab

PNA in steel beam flange

PNA in steel beam web

z= 99.4306418219 mm

Mpl.Rd = 1415.6015197283 kNm Med = 1285 kNm ok


UB533X210X138kg/m' SB3 edge beam UB 457x1
Deflection check
Uniform distributed load
Construction stage Construction stage
Concrete&decking 3.75 kPa P= 0 Concrete&decking 3.75 kPa
Self weight of steel 0.17 kPa Self weight of steel 0.24 kPa
Total DL = 3.92 kPa Total Loading = 5.49 kPa
Tributary 3.6 m Tributary 2.55 m
�=(5𝑊�^4)/38 15.79 mm LL= 1.5 kPa
4𝐸� �=(5𝑊�^4)/38 15.66 mm
4𝐸�
�=(𝑃�^3)/48𝐸
� - mm

Composite stage
Additional DL = 2 kPa P= 24.98 kN
IL = 5 kPa
W= 43.55 kN/m'

Assume normal wt cons


as = 6
ac = 18

rl = 0.72
ae = 15.60

�_𝑔=�_𝑥+(�_(𝑒 ) (�_(𝑠 )−�_� )^3)/(12∝_𝑒 )+(𝐴�_𝑒 (�_𝑠− �_� )


( 〖� +� 〗 _𝑠+ �_� )^ )/4[𝐴 ∝_(𝑒 ) 〖 + � 〗 _(𝑒 ) (�_𝑠− �_� )]

Ig = 1,751,990,486.00 mm4

�=(5𝑊�^4)/384𝐸�+
(𝑃�^3)/(48 𝐸�)

d= 25.74 mm + 2.09 mm

Total deflection 43.62 L/360= 31.38889 prechambering req


Supporting masonry

Prechamber 25 mm
UB533X210X138kg/m' SB3 edge beam UB 457x1
Shear stud

PRd = 83.4 kN for Ø19-100mm height


Min (Ncf, Npla) = 1008.525 kN
No of stup/half span = 13 Nos 434.62
17.27518 327.06

Longitudinal shear
Rq = 1084.2 q= 26.5
�_𝐸�=�_�/
1.0660767 N/mm² 1.149
(2𝑥ℎ_� )
109.97094

Crushing of concrte compression strut

𝑣�_𝑐�<0.6(1−�_𝑐�/250)
�_𝑐�
= 5.2864

𝑣�_𝑐� 2.1109534 N/mm²


𝑠𝑖��_�cos�_� =
Ved = 1.07 N/mm² < 2.111 N/mm²crushing resistance adequate