QF-DGN-01

TITLE: DOCUMENT/DRAWING APPROVAL/COMMENT TRANSMITAL

PROJECT : DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF 230/132KV AIR


INSULATED SWITCHGEAR (AIS) SUBSTATION AT BARISAL ON TURNKEY BASIS.
CONTRACT NUMBER : PGCB/SS/2011/02, Dated 01.08.2012.
DOCUMENT SUBMITTAL REF: LECLDR14/08/24-105, Dated: 25.09.2014.
SUBJECT : APPROVAL OF ASSEMBLE DRAWING OF 132KV GANTRY TOWER MARKED “T1B, T1C, T1D &
T1T” FOR BARISAL 230/132KV AIS SUBSTATION.

To Copy to,
Project Director
Managing Director, PGCB
Barisal – Bhola Project
Power Grid Company of Bangladesh Limited √ Executive Director (P & D), PGCB

NLDC Complex Aftabnagar South Badda, √ Chief Engineer (P & D/Project), PGCB
Dhaka-1212
Kind Attn: Mr.
√ Shandong Taikai Power Engineering Co.,Ltd

√ Executive Engineer. (Civil Design), PGCB

√ Master File
Dear Sir,

We are pleased to enclose the following documents for the purpose indicated below:
Issued by:

(1)
In case of any modification other than those desired are carried out, the same shall be (SUKANTO LAL NAG)
highlighted clearly in the Drawing/Document with full justification thereof and resubmitted Superintending Engr.
for approval.
(Civil Design & Q/C),
(2)
Approval/Comments/Information conveyed herein neither relieves the contractor of his PGCB, Dhaka
contractual obligation and his responsibilities for correctness of dimensions, material of
constructions, weight, quantities, design details, assemble fits, performance particulars Our Ref:
and conformity of the supplies with the Statutory Laws of Bangladesh as may be 04-PGCB/SE(Civil)/Design & QC/2014/45
applicable, nor does it limit the Employer’s right under the contract.”
Date: 01.10.14

Item No Description of Document Drawing Number Revision Status Enclosed


Drawing/ Documents Number
Approved (A)
Yes √
Approved with
Please refer to Annexure -1 Correction (C) √

Request for re-


Submission (RR) No

For information
(FI)

Please acknowledge receipt of documents:

Received by Date

Note:
(1)The above paragraph shall be added if the status of the document is C/RR/FI.
(2)The above paragraph shall be added if the status of the document is A or C.

1
04-PGCB/SE(Civil)/Design & QC/2014/45 Date: 01 October, 2014

Annexure-1

Sl. Description Drawing / Document no. Comments


no

01. Assemble Drawing of 132KV Gantry Tower marked TKPE-230-B0004-A-C0403-08;


"T1B" for Barisal 230/132KV AIS Sub-station. APPROVED WITH CORRECTION
Rev. 1, Sheet 1 of 2 & 2 of 2

02. Assemble Drawing of 132KV Gantry Tower marked TKPE-230-B0004-A-C0403-09;


"T1C" for Barisal 230/132KV AIS Sub-station. APPROVED WITH CORRECTION
Rev. 1, Sheet 1 of 2 & 2 of 2

03. Assemble Drawing of 132KV Gantry Tower marked TKPE-230-B0004-A-C0403-10;


"T1D" for Barisal 230/132KV AIS Sub-station. APPROVED WITH CORRECTION
Rev. 1, Sheet 1 of 2 & 2 of 2

04. Assemble Drawing of 132KV Gantry Tower marked TKPE-230-B0004-A-C0403-11;


"T1T" for Barisal 230/132KV AIS Sub-station. APPROVED WITH CORRECTION
Rev. 0, Sheet 1 of 2 & 2 of 2