SUMMARY OF QUALIFICATIONS
Civil Engineering Senior Designer with over 30 years of experience working for both large and small
companies in all phases of public works and land development engineering, project management
skills, construction observation/inspection and code interpretation. Looking to join an engineering
organization where I can utilize and well-rounded experience to in any way that will support and add
to the professional staff already on board.

EXPERIENCE

Hunter Engineering – Sedona AZ – Civil Engineering Technician 2016- 2018

● Prepared Engineering reports for all projects (Drainage, Water and Sewer) originating
out of the Sedona Office

● Prepared SWPP plans and details for various projects.

● Worked with Yavapai County for the successful abandonment of Federal Patent Easements
for Loves Travel Stop in Cordes Junction. Assisted County Assessor Cartography
Department in the correct depiction of lot combination for the above-mentioned project

● Prepared CLOMAR and LOMAR-F FEMA Paperwork

● Project Manager for Storage Facility in North Phoenix responsible for all aspects of
design, construction support and plan submittal with the City of Phoenix.

● Prepared SWPP plan and accompanying SWPPP Manual for single family residence in
Sedona Arizona. Assisted clients in Preparation of NOI Paperwork.

● Prepared multiple comprehensive feasibility studies for future land purchases.

Diamond Valley Water District - Prescott AZ. – Board Chair 2015- Current

● Oversee yearly budgets of $600,000 plus, Guide and monitor district spending.

● Project Manager/Engineer for District Capital Improvement Projects. Developed


specifications, drawings, details and bid instructions for the project.

● Developed the first set of district Standard Specifications and Details.


● Authored reports on cost of a sewer system for the Diamond Valley community and
viability of forming a community services district.
● Spearheading the transfer of infrastructure mapping to digital format.
● Authored all current District Resolutions and updates to District By-Laws and AFO
Manual.
● Developed contracts with outside contractors.
● Coordinating with district CPA and District Manager tracking spending and progress
of Capital Improvement Projects.
● Designed fencing configuration for protection of one of the district's water tanks.

● Developed more accurate method to determining unaccounted water loss

Training and employment as Certified Pharmacy Technician 2010 – 2016

U.S. Census Bureau - Flagstaff AZ. - Enumerator 2010

Used various municipal mapping applications to draw maps of Trailer Park plots to
assist in the location and verification of address. Applied engineering background
in assisting other enumerators with mapping and records research.

Hook Engineering - Phoenix AZ - Assistant Project Manager 2006 - 2008

• Involved in all phases of Project Engineering, Project Management and construction


Management/Administration for major commercial sites, industrial and residential
developments in Arizona.
• Preformed various types of site inspection throughout various phases of construction
and documented progress. Monitored concrete pours for compliance with job
specifications.

KPFF Consulting Engineers - Phoenix AZ. - Project Engineer 2004 - 2006

• Played a major role in turning the Civil Engineering Department from deficit to
profitability in addition to regaining credibility with clients that were damaged.

● Monitored concrete pours for various commercial developments, verified concrete


mix was incompliance with job specifications.
● Inspected and documented construction progress on site as needed for jobsites.
Coordinated with contractors for solutions to problems
● Prepared and coordinated with FEMA Drainage Study associated with LOMR for
subdivision in Queen Creek Arizona.

Various Engineering Firms 1994 - 2004

• Designed and prepared contract documents for underground drainage system at


University of Phoenix Stadium. Coordinated pump design with pump manufacturers.
• Performed site inspections and prepared reports for verifications of construction
progress for contractor cash draws for various sites in Maricopa County.
• Preformed Special inspection for retaining walls.
Prepared Real Estate Reports and CC&R’s for Subdivisions in Queen Creek
Arizona.