GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
Oferta de agua
Cuenca Chira Piura
Período 2018 - 2019
1.1 Resultados de los escenarios del modelo Weap para el río Chira
1
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
Esc ago-18 sep-18 oct-18 nov-18 dic-18 ene-19 feb-19 mar-19 abr-19 may-19 jun-19 jul-19 total
5 65.49 57.50 104.15 373.85 408.72 379.49 482.79 1131.82 728.33 429.12 269.37 447.83 4878.46
6 300.31 251.38 207.26 280.61 3386.19 840.42 462.46 468.07 460.11 429.86 323.24 610.31 8020.22
7 181.60 220.03 181.46 137.96 119.07 102.19 108.19 132.98 165.86 148.08 97.35 591.21 2185.98
8 59.35 74.71 74.74 53.73 53.68 173.98 935.31 945.31 606.42 352.13 212.60 198.34 3740.30
9 166.60 227.39 182.19 131.08 114.40 145.31 268.06 221.38 142.75 111.29 98.03 96.82 1905.31
10 111.04 91.48 88.84 79.31 132.17 293.90 271.85 302.22 2325.69 1100.83 562.45 322.75 5682.52
11 197.48 163.70 152.60 142.93 125.86 329.19 1466.21 1090.20 1261.81 715.86 386.51 233.05 6265.40
12 188.62 132.74 101.25 87.12 87.80 271.55 1217.01 3613.38 1382.74 1159.16 638.71 371.85 9251.94
13 128.36 97.20 83.40 90.95 106.13 443.31 592.44 486.66 500.27 474.53 583.00 470.99 4057.24
14 177.84 122.24 161.57 259.58 262.61 292.47 413.59 1085.98 900.21 2937.64 703.61 414.27 7731.61
15 478.39 391.99 372.91 262.32 198.08 259.23 714.86 752.35 824.09 581.35 453.41 368.57 5657.57
16 94.74 75.32 63.57 68.64 68.82 97.06 189.49 255.97 224.53 156.21 282.64 215.22 1792.22
17 49.89 39.23 35.33 36.70 40.68 165.62 305.83 323.56 356.23 269.85 624.34 355.74 2603.00
18 79.81 63.51 59.33 63.23 84.42 113.60 151.18 249.15 370.74 289.35 175.63 110.74 1810.70
19 229.32 179.93 230.12 233.05 159.91 178.93 451.12 438.79 466.11 515.08 363.58 231.90 3677.82
20 189.33 202.90 250.27 210.09 300.60 685.74 587.60 524.47 380.62 241.04 163.28 212.18 3948.12
21 339.02 305.39 249.60 259.42 490.36 604.61 530.18 568.12 469.87 3695.42 1970.90 614.32 10097.21
22 44.79 37.12 43.67 79.27 107.45 98.64 239.22 543.89 397.56 234.87 157.69 103.93 2088.10
23 128.20 98.18 83.03 75.81 103.55 128.69 183.96 214.76 194.97 135.28 84.69 77.30 1508.41
24 64.54 52.45 46.72 58.81 94.22 109.97 2399.32 4208.57 1209.69 1417.71 618.38 482.73 10763.12
25 87.86 67.36 60.19 83.77 103.79 593.42 397.23 365.58 560.46 431.16 242.63 206.47 3199.92
26 69.74 55.37 60.13 61.51 56.92 135.15 559.02 829.54 485.38 764.41 531.13 322.22 3930.51
27 67.37 52.01 44.90 43.42 54.56 92.02 930.28 1247.24 687.21 374.92 233.36 160.85 3988.13
28 71.97 55.13 46.91 64.45 87.69 410.40 937.45 1094.34 809.73 513.38 305.69 198.24 4595.37
29 99.32 74.28 132.14 236.83 164.85 176.43 278.86 347.72 324.05 245.14 169.79 106.59 2356.01
30 137.30 109.46 113.84 101.10 101.70 101.96 138.15 246.93 276.08 181.16 118.51 81.05 1707.23
31 163.95 114.66 88.58 92.67 608.83 357.95 349.39 381.24 341.77 263.84 177.43 128.38 3068.68
32 174.16 118.88 91.84 102.21 194.72 357.73 373.66 463.50 357.17 237.49 155.22 99.96 2726.52
33 243.18 212.80 164.06 137.95 169.11 210.87 658.15 1927.80 1306.76 787.13 495.70 303.16 6616.67
34 224.84 155.07 133.11 108.18 112.97 188.67 315.79 371.10 499.99 419.48 321.02 225.75 3075.98
35 105.14 88.50 75.10 75.97 143.24 127.89 449.80 4216.96 1871.43 920.46 505.00 304.22 8883.72
36 139.47 119.72 114.02 148.53 271.39 302.40 356.69 489.19 413.73 578.35 399.94 244.08 3577.51
37 222.72 151.15 126.37 142.87 153.79 153.14 160.42 243.13 320.54 249.22 159.64 274.90 2357.88
38 152.52 134.24 145.68 188.19 1007.69 573.68 1036.53 3226.24 1613.76 911.98 630.30 410.74 10031.54
39 111.12 89.80 98.01 152.46 180.78 226.22 309.67 352.98 304.90 1736.40 464.80 354.66 4381.79
Fuente: Modelo Weap CRHC Chira Piura, 2015
2
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
Se ha seleccionado los años normales de la serie histórica (1938-2015) del río Chira,
con la finalidad de obtener el promedio de los años normales, conforme se muestra en el
cuadro 2.
Se han seleccionado los años normales comprendidos entre 1901 a 3000 hm3, los
escenarios seleccionados se muestran en el cuadro 3.
3
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
700.00
600.00
500.00
Esc 7
400.00
Esc 17
300.00 Esc 29
200.00 Esc 37
100.00 Normal
0.00
700.00 700.00
600.00 600.00
500.00
500.00
Esc 7 (HM3)
4
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
400.00 350.00
300.00
Esc 29 (HM3)
300.00
250.00
200.00 200.00
150.00
100.00 y = 0.5056x + 98.825
R² = 0.7678 100.00 y = 0.2357x + 151.03
0.00 R² = 0.341
50.00
0.00 200.00 400.00 600.00
0.00
Año normal (HM3) 0.00 200.00 400.00 600.00
Figura N°4. Relación esc 29 - año normal Figura N°5. Relación esc 37 - año normal
Fuente: Elaboración propia Fuente: Elaboración propia
Nash-Sutcliffe Eficiencia (NSE) donde: NSE = 1 significa el modelo es perfecto. NSE = 0 significa
que el modelo es igual al promedio de los datos observados, y valores negativo significa que el
promedio es mejor predictor.
5
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
7 181.6 220.03 181.46 137.96 119.07 840.12 102.19 108.19 132.98 165.86 148.08 97.35 591.21 1345.86 2185.98
17 49.89 39.23 35.33 36.7 40.68 201.83 165.62 305.83 323.56 356.23 269.85 624.34 355.74 2401.17 2603
29 99.32 74.28 132.14 236.83 164.85 707.42 176.43 278.86 347.72 324.05 245.14 169.79 106.59 1648.58 2356
37 222.72 151.15 126.37 142.87 153.79 796.9 153.14 160.42 243.13 320.54 249.22 159.64 274.9 1560.99 2357.89
Norm 75.52 60.24 54.55 55.98 120.59 366.88 169 299.72 531.01 424.13 255.22 158.3 109.94 1947.32 2314.2
Fuente: Elaboración propia
6
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
Percentil 60 75.42 68.62 51.68 56.82 81.51 161.38 334.01 553.88 410.68 264.63 162.51 101.47 2322.60
Fuente: Elaboración propia
600.00
500.00
400.00
300.00
200.00
100.00
0.00
1 2 3 4 5 6 7 8 9 10 11 12
7
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC ANUAL
1993 97.6 365.1 1,835.7 1,454.2 451.8 255.8 199.0 109.6 73.5 95.0 94.6 218.9 5,250.8
1994 405.9 930.8 882.9 965.2 373.5 285.5 204.7 165.0 147.9 126.5 104.7 158.4 4,751.1
1995 159.9 205.0 264.6 278.1 192.4 112.1 72.5 17.1 23.0 25.0 74.0 70.2 1,493.9
1996 115.3 197.2 594.7 212.6 147.3 92.8 87.2 59.5 31.9 37.6 16.2 31.7 1,624.1
1997 52.3 147.6 320.5 257.8 207.5 80.9 96.0 66.1 36.1 21.4 89.9 863.9 2,240.0
1998 2,249.3 3,076.4 4,498.0 4,826.3 1,566.2 507.1 249.5 179.4 125.4 102.9 120.3 55.1 17,555.9
1999 202.7 1,233.0 2,603.3 837.0 791.5 454.1 273.4 154.9 108.8 75.1 65.9 218.0 7,017.8
2000 190.4 589.5 1,880.1 1,561.4 773.9 413.3 241.3 152.1 101.6 58.5 24.8 105.6 6,092.5
2001 246.5 388.3 2,245.0 1,393.8 389.7 411.4 215.5 145.3 64.5 69.2 108.1 107.5 5,785.0
2002 147.6 345.0 1,976.3 2,083.3 571.3 262.2 237.6 138.9 66.6 99.0 124.5 158.5 6,210.8
2003 157.5 230.8 342.2 355.8 318.6 162.5 108.6 62.1 44.6 48.9 36.1 124.3 1,992.0
2004 141.4 113.0 208.1 235.5 149.7 185.0 98.0 51.7 41.4 55.6 67.2 145.1 1,491.6
2005 71.0 283.9 851.9 412.6 183.5 146.5 79.2 51.8 41.7 37.5 59.0 82.3 2,300.9
2006 158.5 893.0 1,387.6 1,093.4 238.5 175.3 95.1 72.2 57.6 48.0 65.3 136.7 4,421.2
2007 161.3 153.6 417.3 403.0 221.9 222.7 82.1 95.7 69.4 64.2 136.2 98.7 2,126.2
2008 220.0 1,578.9 2,809.0 2,165.2 774.5 356.2 271.4 158.8 103.6 115.7 141.1 116.8 8,811.2
2009 639.4 1,312.0 2,073.9 1,179.1 602.7 301.5 281.6 174.9 118.5 108.2 78.2 112.6 6,982.7
2010 137.5 398.4 560.8 614.4 360.3 186.8 101.6 77.0 70.5 37.3 49.2 63.5 2,657.3
2011 120.5 490.6 206.2 667.0 281.3 166.3 232.3 74.0 100.1 87.9 84.1 197.3 2,707.6
2012 680.4 2,608.1 2,290.3 1,383.0 560.5 285.5 201.0 121.7 90.0 91.4 138.1 155.7 8,605.8
2013 241.6 273.0 378.4 176.4 168.8 179.9 130.5 89.7 71.0 91.6 30.8 63.0 1,894.6
2014 125.9 98.3 521.7 193.8 345.1 262.6 148.1 112.7 77.2 87.1 62.7 101.5 2,136.6
2015 230.9 229.2 1,441.0 1,007.8 398.0 353.0 210.3 117.7 92.0 92.7 87.3 102.2 4,362.0
2016 167.8 326.8 1,415.1 590.4 351.7 217.8 156.0 99.2 65.4 45.3 16.2 80.2 3,532.1
2017 283.0 1,245.4 4,809.4 2,737.5 1,190.0 451.8 258.1 147.1 100.6 113.1 74.7 114.8 11,525.5
Fuente: PECHP
8
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
13.0 147.6 273.0 560.8 412.6 281.3 185.0 108.6 77.0 65.4 55.6 62.7 102.2 61.9
14.0 141.4 230.8 521.7 403.0 238.5 179.9 101.6 74.0 64.5 48.9 59.0 101.5 66.7
15.0 137.5 229.2 417.3 355.8 221.9 175.3 98.0 72.2 57.6 48.0 49.2 98.7 71.4
16.0 125.9 197.2 378.4 257.8 207.5 166.3 96.0 66.1 44.6 45.3 36.1 82.3 76.2
17.0 120.5 153.6 342.2 235.5 183.5 162.5 95.1 62.1 41.7 37.6 30.8 80.2 81.0
18.0 115.3 147.6 320.5 212.6 168.8 146.5 87.2 59.5 41.4 37.5 24.8 63.5 85.7
19.0 71.0 113.0 208.1 193.8 149.7 92.8 82.1 51.8 36.1 37.3 16.2 63.0 90.5
20.0 52.3 98.3 206.2 176.4 147.3 80.9 79.2 51.7 31.9 21.4 16.2 31.7 95.2
Prom 210.4 594.5 1,226.2 841.2 391.8 245.8 167.3 103.8 72.6 68.6 74.1 153.3 4,149.6
Persistencia
75% 134.6 221.2 407.6 331.3 218.3 173.0 97.5 70.7 61.3 48.2 55.7 97.4 1,916.8
Fuente: Elaboración propia
2. Río Piura
El río Piura nace a 3.600 m, como río Huarmaca, en la divisoria de la cuenca del
río Huancabamba, en la provincia del mismo nombre, donde inicia su recorrido cruzando
las provincias de Morropón y Piura. Su cauce de 280 km tiene una dirección general de
sur a norte, con curvatura desde la quebrada San Francisco hasta la caída de Curumuy,
(donde se produce el aporte de un caudal regularizado por la represa de Poechos) luego
en dirección sur-oeste hasta llegar a su desembocadura al océano Pacífico, en la bahía de
Sechura, a través del estuario de Virrilá.
La cuenca hidrográfica tiene una superficie aproximada de 12.216 km², desde su naciente
hasta su desembocadura en el océano Pacífico, por el estuario de Virrilá
La pendiente media del río Piura entre la laguna Ramón y la ciudad de Piura es de 0,03%,
y entre Piura y Tambogrande de 0,08%. Aquí termina lo que comúnmente se denomina
parte baja de la cuenca. La cuenca media se extiende entre Tambogrande y la confluencia
del río San Martín. Las pendientes entre Tambogrande y Malacasí son del 0,13%, y entre
Malacasí y el punto de confluencia del río Piura y San Martín 0,35%. Sus afluentes a
partir de la cota 300 m, tienen una pendiente media del 10%, llegando en las partes altas
hasta el 15%, en lo que se configura la parte alta de la cuenca
2.1 Resultados de los escenarios del modelo Weap para el río Piura
9
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
Esc ago-18 sep-18 oct-18 nov-18 dic-18 ene-19 feb-19 mar-19 abr-19 may-19 jun-19 jul-19 total
10 0.84 0.66 0.55 0.46 15.21 11.65 3.06 1.91 130.85 27.77 9.33 4.70 206.97
11 2.53 1.91 1.45 1.14 0.96 2.09 10.32 10.22 13.39 8.74 4.41 2.72 59.88
12 2.23 1.45 1.09 0.86 0.73 3.98 247.61 49.40 10.77 7.08 5.17 2.57 332.95
13 0.76 0.56 0.45 0.39 0.39 5.13 5.00 2.78 3.54 4.98 25.52 13.52 63.02
14 1.03 0.66 0.50 0.46 0.45 1.29 4.45 66.82 37.58 55.42 19.73 6.74 195.14
15 1.24 1.10 0.92 0.77 0.64 0.73 1260.58 41.16 39.50 14.42 8.36 5.43 1374.84
16 0.81 0.68 0.57 0.49 0.45 0.84 3.35 3.00 1.44 0.98 1.16 1.16 14.94
17 0.30 0.26 0.23 0.21 0.19 5.47 5.59 3.56 3.44 2.26 3.55 3.16 28.22
18 0.46 0.39 0.34 0.30 0.28 0.31 0.44 0.88 1.82 1.41 0.83 0.66 8.11
19 2.16 1.63 1.29 1.02 0.83 0.87 5.97 4.61 5.67 6.66 4.59 2.78 38.08
20 2.18 1.70 1.45 1.13 35.56 29.39 11.68 5.50 3.00 1.98 1.49 1.19 96.25
21 2.19 1.83 1.54 1.27 7.69 7.77 7.27 17.51 10.52 11.38 10.17 6.52 85.67
22 0.29 0.24 0.21 0.19 0.20 0.19 0.75 1.88 1.55 1.05 0.84 0.69 8.09
23 1.04 0.82 0.68 0.57 0.56 0.56 0.59 0.58 0.49 0.43 0.38 0.33 7.03
24 0.75 0.63 0.53 0.46 0.42 0.39 25.28 38.72 14.19 8.84 5.97 3.27 99.45
25 0.62 0.52 0.44 0.38 0.34 0.97 2.76 2.36 19.15 13.39 4.09 1.78 46.79
26 0.66 0.55 0.47 0.41 0.40 0.40 1.76 4.28 3.09 25.57 16.41 4.80 58.79
27 0.60 0.51 0.44 0.39 0.35 0.38 2.67 15.15 8.65 3.60 2.34 1.73 36.80
28 0.50 0.43 0.37 0.33 0.30 1.09 3.78 14.58 19.77 9.10 3.85 2.29 56.39
29 1.71 1.10 0.85 0.73 0.62 0.58 0.63 0.79 0.94 0.81 0.66 0.55 9.97
30 0.97 0.76 0.62 0.52 0.52 0.68 0.74 0.76 0.72 0.55 0.44 0.38 7.66
31 5.06 2.03 1.22 0.91 9.20 7.23 2.95 2.16 1.62 1.31 1.05 0.85 35.59
32 2.29 1.64 1.25 1.00 0.84 8.70 7.05 3.23 2.37 1.74 1.45 1.09 32.65
33 3.86 2.64 1.90 1.44 2.98 2.88 9.14 105.19 26.19 12.44 8.82 5.52 183.00
34 2.95 2.10 1.57 1.23 1.32 1.63 1.71 1.58 5.66 5.73 4.16 2.87 32.52
35 0.72 0.62 0.53 0.46 1.92 1.95 1.83 6.19 19.94 11.31 4.10 2.43 52.00
36 3.27 1.31 0.79 0.60 0.59 0.57 4.05 6.51 2.88 15.10 11.10 3.71 50.48
37 1.86 1.39 1.08 0.88 0.75 0.65 0.80 1.01 1.32 1.17 0.81 0.69 12.41
38 0.98 0.78 0.66 0.57 99.64 25.16 23.83 16.96 8.38 6.04 4.72 3.15 190.87
39 1.01 0.77 0.62 0.53 0.47 0.50 0.57 0.88 0.98 41.68 17.75 3.91 69.66
Fuente: Modelo Weap CRHC Chira Piura, 2015
10
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
Cuadro N° 13 Volumen de agua año normal (hm3)
Año ago-18 sep-18 oct-18 nov-18 dic-18 ene-19 feb-19 mar-19 abr-19 may-19 jun-19 jul-19 total
normal 0.62 0.06 0.01 0.00 7.59 2.19 19.10 88.70 58.11 16.37 6.01 2.05 200.82
Fuente: PECHP
300.00
250.00
200.00 Esc 4
Esc 8
HM3
150.00
Esc 10
100.00 Esc 12
Esc 14
50.00 Año normal
0.00
1 2 3 4 5 6 7 8 9 10 11 12
MESES
80.00
70.00
60.00
Esc 14 (HM3)
50.00
40.00
30.00
y = 0.6934x + 4.658
20.00 R² = 0.6648
10.00
0.00
0.00 20.00 40.00 60.00 80.00 100.00
Año normal (HM3)
R2 = 0.6648
Nash = 0.7577
Volumen periodo estiaje 3.1 hm3 con escenario 14 y 8.28 hm3 con el año normal.
11
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
3. Río Quiroz
El río Quiroz pertenece al sistema hidrográfico del río Chira y tiene sus orígenes
en las alturas de los Cerros Misal, Muchcapán y Viejos, sobre los 4000 msnm.
Nace con el nombre de río Shiantaco; posteriormente adopta los nombres de Palo
Blanco, San Pablo, Santa Rosa y, a partir de su confluencia con el río Tulmán,
toma el nombre de río Quiroz.
Sus afluentes principales son: por la margen derecha, los ríos Aranza, Parcuchaca
y las quebradas de Montero y Suyo; y por la margen izquierda, el río Tulmán y la
quebrada Huanta. Sus cursos de agua son alimentados por las precipitaciones que
caen sobre las laderas occidentales de la Cordillera de los Andes.
3.1 Resultados de los escenarios del modelo Weap para el río Quiroz
12
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
Esc ago-18 sep-18 oct-18 nov-18 dic-18 ene-19 feb-19 mar-19 abr-19 may-19 jun-19 jul-19 total
12 22.78 17.80 14.87 11.43 10.60 18.98 28.81 149.50 134.39 80.39 53.06 35.97 578.60
13 23.71 16.21 16.79 19.54 20.66 58.50 71.82 57.32 57.01 55.21 49.85 48.06 494.67
14 21.38 14.47 24.64 31.71 28.84 25.36 38.30 75.31 60.12 41.27 27.84 20.25 409.48
15 62.94 55.24 84.19 60.08 39.03 44.54 81.87 92.27 91.68 65.57 41.51 38.36 757.29
16 14.55 10.10 7.52 8.23 9.48 11.93 20.83 29.83 28.56 22.90 19.40 15.12 198.46
17 7.12 6.08 5.80 7.93 8.65 20.15 36.50 45.39 64.19 49.13 46.65 34.22 331.82
18 10.64 9.47 9.78 11.68 12.62 18.84 26.15 34.19 55.24 44.05 25.72 20.27 278.66
19 46.23 35.19 43.61 44.79 31.64 28.94 44.28 46.90 50.40 43.77 33.28 23.47 472.52
20 20.59 32.10 47.44 34.55 51.97 85.78 72.05 60.61 45.76 27.71 17.03 60.01 555.60
21 49.12 34.09 30.86 45.60 104.14 102.76 78.91 96.60 93.30 84.14 57.09 37.59 814.22
22 5.90 8.86 14.16 20.46 20.29 13.36 31.01 53.04 46.06 30.82 21.02 14.10 279.09
23 22.52 22.28 20.43 20.77 24.36 24.59 26.51 30.91 29.78 20.82 13.42 20.61 277.01
24 9.70 10.04 8.75 8.56 12.46 20.55 258.51 366.53 143.61 78.64 56.38 81.11 1054.83
25 11.38 8.33 9.57 13.01 13.45 31.14 41.65 40.12 99.17 79.52 43.42 45.51 436.28
26 14.65 10.20 10.55 9.80 9.67 22.38 62.61 83.45 56.25 40.42 42.27 35.78 398.02
27 7.17 6.12 6.17 7.01 8.34 10.89 43.60 109.74 76.24 44.35 27.75 19.53 366.92
28 10.68 8.06 7.84 11.19 17.61 47.82 96.08 99.43 74.47 48.40 32.05 25.12 478.75
29 11.75 8.42 28.75 47.31 29.04 28.11 38.57 52.37 48.09 40.32 28.42 16.55 377.69
30 16.91 15.31 15.88 12.88 14.54 13.13 14.90 32.42 37.86 25.46 17.20 11.32 227.81
31 29.53 19.38 15.95 15.08 24.76 27.43 32.30 33.24 26.01 23.29 17.78 11.65 276.40
32 29.38 17.86 15.63 19.57 29.50 52.38 56.57 68.89 54.99 35.08 23.28 15.59 418.72
33 22.83 18.25 18.98 18.05 19.01 29.52 70.45 230.78 150.31 90.37 54.71 31.52 754.79
34 30.58 23.48 25.73 23.45 18.48 27.72 33.88 37.76 61.53 59.08 42.18 28.41 412.27
35 12.25 11.30 11.96 13.16 18.48 16.43 32.39 156.40 134.76 76.49 44.05 28.34 556.02
36 25.67 23.66 25.17 31.04 43.78 38.70 35.54 44.27 38.05 65.53 68.04 39.76 479.20
37 30.66 20.35 21.67 21.28 20.83 20.82 20.46 23.46 38.55 36.76 24.63 86.35 365.83
38 25.57 24.59 25.90 29.25 49.12 48.86 79.40 519.18 272.23 145.74 84.00 46.91 1350.76
39 15.60 10.63 12.05 19.05 24.86 29.38 32.55 35.23 34.01 43.24 32.92 48.48 337.99
Fuente: Modelo Weap CRHC Chira Piura, 2015
13
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC Total
2005 39.99 115.26 165.53 126.31 53.8 46.07 25.06 14.12 14.43 17.49 29.72 32.06 679.84
2007 66.95 42.7 82.04 100.49 63.32 68.43 27.55 17.9 17.1 25.52 60.32 34.93 607.25
2013 109.79 72.78 99.56 54.42 60.57 72.24 60.57 22.53 20.85 39.82 19 30.26 662.39
2014 56.77 39.11 139.99 61.96 88.86 74.52 31.37 39.51 21.99 29.02 27.9 43.46 654.46
2015 101.15 76.72 91.77 25.35 65.07 47.35 48.1 31.21 21.08 36.12 27.97 43.49 615.38
Prom 62.45 75.59 116.99 71.00 69.47 54.61 40.72 29.24 22.69 27.54 25.02 32.28 627.60
Fuente: JUSH SL
180.00
160.00
140.00
120.00 Esc 11
100.00
Esc 12
80.00
Esc 20
60.00
Esc 35
40.00
Normal
20.00
0.00
14
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
R2 - R cuadrado, es El coeficiente que significa la calidad del modelo para replicar los
resultados, y la proporción de variación de los resultados que puede explicarse por el
modelo. R2 = 1 significa el modelo es perfecto.
140.00 200.00
120.00
100.00 150.00
80.00
100.00
60.00 y = 1.469x - 28.614
40.00 y = 1.1894x - 14.331 R² = 0.7408
50.00
R² = 0.7205
20.00
0.00 0.00
0.00 50.00 100.00 150.00 0.00 50.00 100.00 150.00
Figura N°9. Relación esc 11 - año normal Figura N°10. Relación esc 12 - año normal
Fuente: Elaboración propia Fuente: Elaboración propia
200.00
150.00
100.00
y = 1.4834x - 31.248
R² = 0.6973
50.00
0.00
0.00 50.00 100.00 150.00
15
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
4 Río Chipillico
4.1 Resultados de los escenarios del modelo Weap para el río Chipillico
Cuadro N° 19 Volumen de agua de los escenarios (Hm3)
Esc ago-18 sep-18 oct-18 nov-18 dic-18 ene-19 feb-19 mar-19 abr-19 may-19 jun-19 jul-19 total
1 8.90 6.70 12.15 13.43 10.64 11.41 13.78 13.46 11.79 11.08 8.61 6.79 128.74
2 8.54 6.96 6.35 8.42 8.00 7.26 8.06 13.88 14.31 11.65 8.98 6.95 109.36
3 5.63 4.44 4.76 4.67 6.70 8.21 10.71 15.10 13.48 10.08 7.52 6.39 97.70
4 5.49 4.21 3.97 4.03 4.40 5.43 10.48 20.18 20.85 14.22 9.92 8.02 111.20
5 4.20 4.21 10.02 14.68 12.04 12.63 18.85 31.49 28.47 21.82 14.77 10.32 183.50
6 7.15 5.72 5.52 7.72 15.51 11.87 13.69 12.90 12.74 13.36 10.43 7.92 124.53
7 5.05 4.10 3.86 4.21 5.06 5.74 5.96 5.56 7.61 8.73 8.06 6.27 70.21
8 4.21 3.41 2.82 2.49 2.78 6.24 18.90 31.89 20.04 13.89 10.40 7.63 124.71
9 5.26 4.16 3.67 3.44 3.01 5.04 8.75 6.75 5.72 5.22 4.97 5.69 61.68
10 5.56 4.54 3.92 3.48 4.79 9.64 11.13 15.21 19.76 14.66 10.52 7.44 110.63
11 6.30 5.35 4.23 3.61 3.76 13.20 27.65 22.35 21.75 15.46 10.59 7.78 142.02
12 5.05 3.85 3.10 2.82 2.95 6.12 21.42 53.00 39.72 25.08 15.65 11.40 190.13
13 7.64 6.02 5.33 5.25 5.51 13.83 18.31 18.85 21.44 21.40 17.11 11.88 152.58
14 5.93 4.56 4.77 7.75 8.34 10.05 15.93 28.42 20.73 19.51 13.48 10.18 149.64
15 10.13 8.94 9.36 7.68 6.34 8.99 20.11 19.06 25.01 17.11 11.68 9.32 153.74
16 5.06 3.93 3.41 3.06 2.91 4.69 11.06 9.89 7.99 6.33 5.65 5.05 69.03
17 5.12 4.05 3.54 3.28 3.09 7.55 14.54 18.74 25.01 20.34 15.47 10.77 131.51
18 5.46 4.17 3.75 3.45 3.89 8.17 11.71 18.36 17.19 13.01 9.32 6.86 105.33
19 8.18 6.66 6.44 5.69 4.44 8.62 30.73 27.57 23.12 17.43 12.53 9.07 160.48
20 6.99 8.15 9.65 7.65 11.34 21.76 33.19 28.46 23.79 16.61 12.01 9.30 188.91
21 10.09 9.64 8.57 9.26 14.18 24.92 32.81 34.34 25.84 25.47 18.41 12.41 225.94
22 4.08 3.25 3.19 3.20 3.77 5.93 11.62 17.66 15.10 11.74 8.51 6.18 94.22
23 5.84 4.61 4.14 3.90 4.92 8.77 14.58 14.99 13.91 10.40 7.30 5.52 98.88
24 5.17 4.12 3.68 3.55 3.66 4.79 35.23 59.37 23.15 17.54 12.49 10.04 182.79
25 5.85 4.48 3.78 4.11 4.39 6.30 9.12 10.10 15.28 11.70 8.26 7.12 90.50
26 5.04 4.02 3.50 3.04 3.24 7.84 14.62 17.65 17.34 13.88 10.47 7.83 108.47
27 4.16 3.26 2.79 2.70 3.20 4.86 17.31 34.98 21.41 14.10 9.82 7.21 125.79
28 4.86 3.89 3.62 3.97 4.10 7.29 14.72 19.82 19.86 14.62 9.87 6.98 113.62
29 7.33 5.63 6.75 6.84 4.98 7.45 13.42 18.97 18.68 13.83 10.05 7.30 121.23
30 6.09 5.02 4.84 4.34 4.47 4.24 6.01 11.62 15.82 11.91 8.58 6.34 89.29
31 7.33 5.58 4.59 4.34 5.31 8.05 13.24 15.23 14.96 11.82 8.37 6.34 105.17
32 6.92 5.18 4.69 4.70 7.70 13.77 15.63 18.45 22.24 16.67 11.22 8.04 135.20
33 8.30 7.12 6.39 6.26 6.31 9.09 21.64 31.53 27.13 20.37 13.97 9.80 167.91
34 7.51 5.90 5.55 5.15 4.75 9.31 16.09 20.34 23.09 16.42 11.68 8.69 134.51
35 5.66 4.95 4.28 3.86 3.97 4.14 9.21 21.22 20.44 12.89 8.97 6.51 106.11
36 6.31 5.09 4.87 5.14 6.91 8.14 9.98 14.88 14.78 14.62 10.92 7.76 109.41
37 8.15 6.22 5.72 5.68 6.03 8.19 9.50 12.37 16.75 12.27 8.65 7.07 106.61
38 7.17 6.00 5.91 5.54 10.69 16.54 22.82 41.11 37.82 28.59 18.80 12.89 213.88
39 5.61 4.39 4.15 4.31 4.79 7.39 12.46 13.63 13.58 13.60 10.12 7.64 101.66
Fuente: Modelo Weap CRHC Chira Piura, 2015
16
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
17
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
30.00
25.00
Esc 2
20.00
Esc 18
15.00 Esc 22
Esc 31
10.00 Esc 35
Año normal
5.00
0.00
1 2 3 4 5 6 7 8 9 10 11 12
20.00 25.00
15.00 20.00
15.00
10.00 y = 0.5988x + 4.1724
y = 0.2969x + 6.8296
10.00 R² = 0.8608
R² = 0.806
5.00
5.00
0.00 0.00
0.00 10.00 20.00 30.00 0.00 10.00 20.00 30.00
Figura N°13. Relación esc 2 - año normal Figura N°14. Relación esc 18 - año normal
Fuente: Elaboración propia Fuente: Elaboración propia
20.00 20.00
15.00 15.00
y = 0.4429x + 5.3574
10.00 y = 0.5829x + 3.3687 10.00 R² = 0.8063
R² = 0.8827
5.00 5.00
0.00 0.00
0.00 10.00 20.00 30.00 0.00 10.00 20.00 30.00
Figura N°15. Relación esc 22 - año normal Figura N°16. Relación esc 31 - año normal
Fuente: Elaboración propia Fuente: Elaboración propia
18
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
30.00
20.00
5 Río Charanal
5.1 Resultados de los escenarios del modelo Weap para el río Charanal
Cuadro N° 24 Volumen de agua de escenarios (Hm3)
Esc ago-18 sep-18 oct-18 nov-18 dic-18 ene-19 feb-19 mar-19 abr-19 may-19 jun-19 jul-19 total
1 1.09 0.56 0.52 1.50 2.53 3.33 7.39 6.70 4.25 3.49 2.07 1.06 34.50
2 2.12 1.76 1.04 3.39 4.60 2.64 3.60 7.05 6.59 5.83 4.63 2.32 45.56
3 0.93 0.53 0.38 0.33 4.99 7.73 6.50 7.96 6.28 4.08 2.60 1.47 43.76
19
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
Esc ago-18 sep-18 oct-18 nov-18 dic-18 ene-19 feb-19 mar-19 abr-19 may-19 jun-19 jul-19 total
4 0.90 0.45 0.29 0.29 1.50 3.72 6.78 13.68 13.48 7.46 3.35 1.60 53.49
5 0.48 0.35 0.41 5.04 8.23 9.00 9.73 11.19 10.11 6.33 3.35 1.55 65.78
6 0.82 0.53 0.49 2.87 25.42 17.65 9.57 9.60 8.98 7.07 4.37 2.13 89.50
7 0.74 0.38 0.27 0.27 0.37 0.62 1.73 3.36 5.02 5.26 3.38 1.73 23.13
8 0.49 0.30 0.16 0.12 0.23 1.03 4.03 24.37 16.06 5.32 1.96 0.95 55.01
9 0.79 0.46 0.29 0.21 0.20 1.16 4.31 4.13 2.38 1.83 1.38 1.09 18.23
10 1.01 0.56 0.37 0.27 1.52 4.13 3.89 4.32 53.31 19.73 5.94 2.35 97.40
11 2.13 1.86 0.92 0.54 0.73 4.04 17.83 15.30 11.67 8.97 4.68 2.01 70.66
12 1.82 0.87 0.44 0.28 0.43 1.59 3.76 25.95 17.23 7.35 3.82 1.89 65.44
13 1.04 0.73 0.50 0.41 0.59 2.59 8.19 11.15 13.87 9.50 7.41 5.97 61.95
14 1.57 0.86 0.67 1.98 3.41 3.26 6.80 17.98 16.20 15.14 10.23 4.67 82.78
15 3.14 2.77 2.03 1.46 0.85 1.44 15.58 16.73 11.15 7.20 3.44 1.90 67.69
16 0.68 0.36 0.19 0.14 0.24 1.52 4.99 7.46 6.25 3.89 2.54 1.81 30.07
17 0.89 0.47 0.30 0.33 0.32 0.73 3.62 7.21 7.55 6.44 4.19 2.00 34.04
18 0.64 0.38 0.34 0.32 0.41 1.71 4.75 7.89 9.05 5.72 2.59 1.48 35.29
19 2.23 1.39 1.22 0.99 0.66 1.25 11.56 13.64 13.96 10.16 4.37 2.01 63.43
20 1.58 1.63 1.92 1.21 6.65 21.77 23.73 15.47 7.45 3.16 1.46 1.14 87.19
21 2.30 2.75 2.48 4.30 11.75 17.62 15.34 31.66 18.97 9.84 5.05 1.97 124.03
22 0.70 0.38 0.28 0.29 0.43 0.61 5.46 14.86 9.99 4.30 2.20 1.31 40.80
23 0.60 0.36 0.35 0.47 0.98 2.25 4.38 4.59 3.20 2.12 1.17 0.71 21.16
24 0.37 0.25 0.17 0.33 0.78 1.39 8.22 24.76 15.35 8.07 4.76 2.79 67.24
25 0.61 0.31 0.19 0.21 0.24 8.73 13.21 8.20 8.62 5.96 2.87 1.93 51.09
26 0.57 0.31 0.18 0.17 0.22 0.89 11.12 25.63 13.55 6.45 3.95 1.95 65.00
27 0.53 0.29 0.26 0.28 0.37 1.32 12.30 27.28 13.07 4.42 2.09 1.25 63.44
28 0.61 0.30 0.20 0.35 0.85 5.95 18.10 24.17 16.39 7.71 3.14 1.38 79.15
29 0.94 0.49 0.55 1.36 1.43 2.06 3.90 6.43 6.38 4.38 2.77 1.37 32.06
30 0.98 0.56 0.44 0.34 0.33 0.41 1.28 3.50 4.40 3.23 1.91 1.15 18.51
31 1.71 0.95 0.56 0.57 1.55 3.28 5.98 7.16 5.80 4.05 2.48 1.34 35.42
32 1.38 0.68 0.45 0.41 1.30 5.32 8.27 8.13 6.41 3.63 2.00 1.24 39.22
33 1.92 1.49 0.92 0.59 1.28 3.89 20.61 45.71 21.85 11.64 6.31 2.85 119.06
34 2.04 1.13 0.82 0.76 0.80 2.07 4.65 7.63 10.86 11.25 6.93 3.18 52.11
35 0.99 0.83 0.70 0.65 0.82 0.80 4.08 17.38 20.81 11.19 4.69 2.12 65.06
36 1.36 0.72 0.55 1.19 2.51 3.24 3.61 5.36 5.12 4.22 3.31 1.60 32.80
37 1.97 1.18 0.67 0.70 0.89 1.29 2.51 3.93 5.73 4.77 2.61 2.16 28.42
38 1.23 0.87 0.88 1.23 7.22 9.66 9.54 16.39 15.11 9.96 5.61 2.53 80.23
39 0.73 0.48 0.32 0.23 0.41 2.44 5.70 10.08 9.93 9.01 6.26 3.39 48.97
Fuente: Modelo Weap CRHC Chira Piura, 2015
20
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
30.00
25.00
20.00
esc 2
HM3
15.00 esc 3
esc4
10.00
esc 5
esc 8
5.00
año normal
0.00
MESES
21
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
20.00 30.00
25.00
15.00
20.00
10.00 15.00 y = 1.2155x - 1.3628
y = 0.7577x + 0.7502 R² = 0.8915
R² = 0.8568 10.00
5.00
5.00
0.00 0.00
0.00 5.00 10.00 15.00 20.00 25.00 -5.00 0.00 5.00 10.00 15.00 20.00 25.00
Figura N°19. Relación esc 4 - año normal Figura N°20. Relación esc 8 - año normal
Fuente: Elaboración propia Fuente: Elaboración propia
30.00
25.00
esc 11
20.00
esc 12
15.00 esc 13
esc 14
10.00 esc 15
año normal
5.00
0.00
1 2 3 4 5 6 7 8 9 10 11 12
30.00 20.00
25.00
15.00
20.00
15.00 y = 1.2439x - 0.6335 10.00 y = 0.8846x + 1.3127
R² = 0.8595 R² = 0.8556
10.00
5.00
5.00
0.00 0.00
0.00 5.00 10.00 15.00 20.00 25.00 0.00 5.00 10.00 15.00 20.00 25.00
Figura N°22. Relación esc 12 - año normal Figura N°23. Relación esc 15 - año normal
Fuente: Elaboración propia Fuente: Elaboración propia
22
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
30.00
25.00
esc 19
20.00
esc 20
15.00 esc 24
esc 25
10.00 esc 26
año normal
5.00
0.00
1 2 3 4 5 6 7 8 9 10 11 12
30.00 30.00
25.00 25.00
20.00 20.00
y = 1.294x - 0.9149
15.00 R² = 0.9745
15.00
y = 1.2346x - 0.4377 10.00
10.00 R² = 0.9379
5.00
5.00
0.00
0.00 0.00 5.00 10.00 15.00 20.00 25.00
0.00 5.00 10.00 15.00 20.00 25.00 -5.00
Figura N°25. Relación esc 24 - año normal Figura N°26. Relación esc 26 - año normal
Fuente: Elaboración propia Fuente: Elaboración propia
23
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
30.00
25.00
esc 27
20.00 esc 28
esc 34
15.00
esc 35
esc 38
10.00
esc 39
año normal
5.00
0.00
1 2 3 4 5 6 7 8 9 10 11 12
24
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
4 0.9017
8 0.8746
12 0.7929
15 0.8953
24 0.8726
26 0.9099
27 0.8961
28 0.8139
Fuente: Elaboración propia
6 Río Yapatera
6.1 Resultados de los escenarios del modelo Weap para el río Yapatera
Cuadro N° 29 Volumen de agua de los escenarios (Hm3)
Esc ago-18 sep-18 oct-18 nov-18 dic-18 ene-19 feb-19 mar-19 abr-19 may-19 jun-19 jul-19 total
1 2.39 1.60 9.32 10.02 5.59 6.10 8.13 6.88 4.57 3.13 1.92 1.11 60.76
2 3.34 2.65 1.44 3.53 3.86 3.57 4.70 6.79 6.57 4.43 2.50 1.51 44.89
3 0.98 0.66 0.59 0.63 5.51 6.86 6.80 8.67 8.02 5.48 2.97 1.61 48.79
4 1.22 0.76 0.94 1.21 2.14 3.06 6.78 13.62 12.39 6.52 2.87 1.76 53.28
5 0.70 0.99 1.58 8.87 7.61 5.99 12.24 21.04 14.30 7.65 3.86 1.95 86.78
6 1.15 0.94 1.08 4.20 12.20 7.77 8.06 8.31 6.80 5.56 3.15 1.65 60.87
7 0.77 0.55 0.58 1.09 1.81 2.43 3.48 3.42 4.13 3.59 1.97 1.11 24.94
8 0.64 0.50 0.37 0.33 0.63 4.16 17.69 20.24 11.16 4.89 2.34 1.30 64.23
9 0.80 0.56 0.54 0.59 0.56 3.45 7.12 4.39 2.72 2.10 1.77 1.53 26.12
10 1.29 1.05 0.85 0.78 2.13 6.42 5.51 7.77 14.00 9.14 3.96 1.87 54.76
11 2.92 2.68 1.43 1.23 1.90 12.60 20.27 14.43 11.44 6.95 3.32 1.80 80.95
12 1.77 1.06 0.69 0.92 1.42 7.00 21.33 30.22 19.92 11.99 6.02 2.83 105.17
13 2.54 1.80 1.37 2.20 2.86 11.69 14.23 10.59 8.77 6.74 6.66 4.62 74.08
14 1.27 0.83 1.79 6.61 6.45 7.50 10.93 18.89 12.23 10.44 6.48 4.01 87.43
15 3.97 3.99 5.47 4.08 2.49 4.96 15.82 13.07 12.42 7.38 3.66 3.09 80.42
16 0.79 0.51 0.47 0.60 0.65 1.95 4.68 4.70 3.65 2.64 2.27 1.99 24.91
17 0.90 0.78 0.94 0.92 0.86 6.01 9.00 7.94 10.16 6.63 4.98 3.57 52.68
18 0.91 0.57 0.64 0.83 1.08 4.01 6.97 7.26 6.69 4.28 2.63 1.70 37.57
19 2.52 1.94 2.30 2.12 1.24 3.10 18.32 16.25 11.10 7.71 5.21 3.19 75.00
20 1.14 3.36 5.29 3.16 3.84 9.98 16.31 12.37 6.94 3.67 1.96 1.56 69.58
21 3.19 3.87 3.61 5.70 7.78 11.80 15.73 20.91 11.93 11.70 9.29 4.24 109.74
22 0.70 0.60 1.11 1.32 1.98 4.06 9.47 12.40 7.38 3.43 1.94 1.22 45.60
23 1.10 0.84 1.19 1.30 2.56 5.68 6.27 6.25 5.07 2.93 1.60 1.16 35.96
24 0.57 0.50 0.60 1.17 1.52 2.06 26.76 38.92 18.24 9.35 5.44 4.55 109.68
25 1.13 0.68 0.54 1.05 1.55 4.61 6.07 6.24 10.50 6.77 2.98 2.33 44.45
26 0.86 0.66 0.63 0.61 0.58 2.95 8.45 10.67 10.26 6.96 4.51 2.74 49.89
27 0.69 0.45 0.35 0.47 1.42 3.32 12.77 25.86 15.32 7.20 3.81 2.21 73.88
28 0.94 0.76 0.81 1.11 1.40 4.83 11.52 12.55 9.01 5.40 2.89 1.49 52.70
25
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
Esc ago-18 sep-18 oct-18 nov-18 dic-18 ene-19 feb-19 mar-19 abr-19 may-19 jun-19 jul-19 total
29 1.56 1.06 4.64 5.09 2.18 3.26 5.84 9.87 9.02 5.54 2.97 1.52 52.54
30 1.29 1.15 1.66 1.43 1.32 1.47 2.71 4.64 6.15 3.85 1.89 1.17 28.73
31 2.51 1.51 1.04 1.31 2.76 5.68 8.10 7.59 5.55 3.52 1.97 1.29 42.84
32 1.48 0.85 0.66 0.91 1.78 6.81 7.88 8.73 6.49 4.16 2.61 1.37 43.74
33 2.88 2.63 2.36 3.16 3.67 6.15 16.11 23.79 17.34 11.33 6.22 2.91 98.53
34 1.98 1.50 1.96 1.89 1.59 5.57 7.90 9.17 12.65 8.88 4.56 2.53 60.19
35 1.13 1.44 1.40 1.48 1.79 1.62 6.07 14.84 15.28 7.83 3.34 1.86 58.07
36 1.19 1.20 2.19 3.20 3.98 4.23 6.70 7.88 4.92 7.53 6.72 3.11 52.84
37 2.75 1.87 2.32 3.22 3.17 4.63 4.82 5.77 6.64 4.13 2.04 2.01 43.36
38 1.93 1.66 2.66 2.82 4.67 4.79 12.35 19.34 14.28 10.34 6.10 2.91 83.84
39 1.36 0.88 0.94 1.42 1.54 4.02 7.77 7.55 5.16 6.20 4.45 2.46 43.75
Fuente: Modelo Weap CRHC Chira Piura, 2015
26
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
normal 0.81 0.72 0.81 0.69 1.95 4.97 11.36 17.38 11.11 6.18 2.48 1.15 59.59
Fuente: ALA Alto Piura
25.00
20.00
Esc 1
Esc 2
15.00
Esc 3
Esc 4
10.00
Esc 6
Esc 8
5.00 Año normal
0.00
1 2 3 4 5 6 7 8 9 10 11 12
16.00 25.00
14.00
20.00
12.00
10.00 15.00
8.00
6.00 10.00
4.00 y = 0.7725x + 0.6035 y = 1.2494x - 0.8515
5.00 R² = 0.9455
2.00 R² = 0.9053
0.00 0.00
0.00 5.00 10.00 15.00 20.00 0.00 5.00 10.00 15.00 20.00
Figura N°31. Relación esc 4 - año normal Figura N°32. Relación esc 8 - año normal
Fuente: Elaboración propia Fuente: Elaboración propia
27
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
20.00
18.00
16.00
Esc 10
14.00
Esc 17
12.00
Esc 18
10.00
Esc 22
8.00
Esc 23
6.00
Esc 25
4.00
Año normal
2.00
0.00
1 2 3 4 5 6 7 8 9 10 11 12
10.00 14.00
y = 0.4548x + 0.8721 12.00 y = 0.6951x + 0.348
8.00 R² = 0.9104 R² = 0.976
10.00
6.00 8.00
4.00 6.00
4.00
2.00
2.00
0.00 0.00
0.00 5.00 10.00 15.00 20.00 0.00 5.00 10.00 15.00 20.00
Figura N°34. Relación esc18 - año normal Figura N°35. Relación esc 22 - año normal
Fuente: Elaboración propia Fuente: Elaboración propia
20.00
18.00
16.00
14.00 Esc 26
12.00 Esc 28
10.00 Esc 29
8.00 Esc 31
6.00 Esc 32
4.00 Año normal
2.00
0.00
1 2 3 4 5 6 7 8 9 10 11 12
28
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
14.00 15.00
12.00 y = 0.6653x + 0.8536 y = 0.7733x + 0.5516
10.00 R² = 0.8704 R² = 0.9618
10.00
8.00
HM3
HM3
6.00
4.00 5.00
2.00
0.00 0.00
0.00 5.00 10.00 15.00 20.00 0.00 5.00 10.00 15.00 20.00
MESES MESES
Figura N°37. Relación esc 26 - año normal Figura N°38. Relación esc 28 - año normal
Fuente: Elaboración propia Fuente: Elaboración propia
20.00
18.00
16.00
14.00
12.00
HM3
10.00
8.00
6.00
4.00
2.00
0.00
1 2 3 4 5 6 7 8 9 10 11 12
MESES
20.00
y = 0.8437x + 0.6497
15.00
Esc 35 (HM3)
R² = 0.7982
10.00
5.00
0.00
0.00 5.00 10.00 15.00 20.00
Año normal (HM3)
7.1 Resultados de los escenarios del modelo Weap para el río Corral del Medio
30
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
Esc ago-18 sep-18 oct-18 nov-18 dic-18 ene-19 feb-19 mar-19 abr-19 may-19 jun-19 jul-19 total
16 2.31 1.50 0.96 0.82 1.05 3.08 7.42 10.43 9.49 6.94 5.59 5.06 54.66
17 2.95 1.83 1.40 1.54 1.43 1.96 5.79 10.01 11.17 11.02 8.30 4.80 62.20
18 2.02 1.50 1.47 1.39 1.56 3.61 7.35 11.22 13.58 9.68 5.60 4.24 63.22
19 8.06 5.75 5.19 4.13 2.81 3.47 16.62 19.53 22.80 18.08 9.77 5.82 122.03
20 5.90 7.29 7.72 4.87 17.31 38.51 39.58 27.97 15.68 8.31 4.73 5.29 183.15
21 8.86 10.70 9.28 16.14 31.06 34.85 28.30 50.18 34.29 21.77 12.39 6.19 264.02
22 1.95 1.29 1.13 1.20 1.52 1.70 8.10 19.62 15.04 8.30 5.36 3.88 69.10
23 2.54 1.73 1.74 2.08 3.22 5.03 7.44 7.24 5.56 4.13 2.67 2.17 45.54
24 1.78 1.33 1.04 1.65 2.75 3.45 12.27 33.41 24.69 16.52 11.10 8.99 118.97
25 2.39 1.48 1.10 1.15 1.17 12.90 18.50 13.31 14.78 10.72 6.81 5.81 90.12
26 2.06 1.38 1.01 0.95 1.06 2.12 14.88 34.43 22.18 13.77 9.60 5.65 109.09
27 1.80 1.23 1.21 1.28 1.43 2.92 16.63 37.21 21.78 10.11 6.09 4.35 106.05
28 1.97 1.24 1.01 1.59 2.81 10.32 25.39 35.74 28.05 15.87 8.20 4.56 136.76
29 2.93 1.84 2.24 5.01 4.65 4.94 6.94 9.98 9.94 8.01 5.82 3.48 65.77
30 3.49 2.40 2.04 1.63 1.47 1.45 2.62 5.32 6.43 5.26 3.69 2.91 38.72
31 5.21 3.50 2.39 2.57 4.89 7.17 10.15 11.23 9.73 7.68 5.52 3.57 73.62
32 4.84 2.96 2.25 2.04 4.11 10.16 13.10 13.03 10.99 7.17 4.90 3.57 79.12
33 6.39 5.49 3.72 2.65 4.25 8.13 29.01 67.32 39.62 25.53 15.33 8.66 216.10
34 6.76 4.30 3.51 3.20 3.04 4.85 7.88 11.49 16.58 19.56 13.83 8.10 103.08
35 3.43 3.30 2.89 2.74 3.01 2.51 6.94 23.30 31.40 20.25 10.87 6.16 116.80
36 4.46 2.94 2.48 4.88 7.69 7.64 7.20 9.18 8.49 8.20 6.83 3.89 73.89
37 6.76 4.43 2.91 3.08 3.35 3.58 4.92 6.40 9.01 7.80 5.35 6.97 64.58
38 4.28 3.61 3.71 4.88 18.59 19.30 17.83 26.24 25.48 19.65 12.82 6.99 163.38
39 2.70 2.00 1.50 1.16 1.57 4.79 8.63 14.30 14.97 16.46 12.46 9.80 90.34
Fuente: Modelo Weap CRHC Chira Piura, 2015
31
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
Esc ago-18 sep-18 oct-18 nov-18 dic-18 ene-19 feb-19 mar-19 abr-19 may-19 jun-19 jul-19 total
26 2.06 1.38 1.01 0.95 1.06 2.12 14.88 34.43 22.18 13.77 9.60 5.65 109.09
27 1.80 1.23 1.21 1.28 1.43 2.92 16.63 37.21 21.78 10.11 6.09 4.35 106.05
29 2.93 1.84 2.24 5.01 4.65 4.94 6.94 9.98 9.94 8.01 5.82 3.48 65.77
31 5.21 3.50 2.39 2.57 4.89 7.17 10.15 11.23 9.73 7.68 5.52 3.57 73.62
32 4.84 2.96 2.25 2.04 4.11 10.16 13.10 13.03 10.99 7.17 4.90 3.57 79.12
34 6.76 4.30 3.51 3.20 3.04 4.85 7.88 11.49 16.58 19.56 13.83 8.10 103.08
35 3.43 3.30 2.89 2.74 3.01 2.51 6.94 23.30 31.40 20.25 10.87 6.16 116.80
36 4.46 2.94 2.48 4.88 7.69 7.64 7.20 9.18 8.49 8.20 6.83 3.89 73.89
37 6.76 4.43 2.91 3.08 3.35 3.58 4.92 6.40 9.01 7.80 5.35 6.97 64.58
39 2.70 2.00 1.50 1.16 1.57 4.79 8.63 14.30 14.97 16.46 12.46 9.80 90.34
Fuente: Elaboración propia
40.00
35.00
30.00 Esc 1
Esc 2
25.00
Esc 3
20.00
Esc 4
15.00 Esc 8
Esc 11
10.00
Año normal
5.00
0.00
1 2 3 4 5 6 7 8 9 10 11 12
32
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
25.00 35.00
30.00 y = 0.8539x - 0.1387
20.00
25.00 R² = 0.8947
Esc 8 (HM3)
Esc 4 (HM3)
15.00 20.00
y = 0.5704x + 3.162
10.00 R² = 0.8502 15.00
10.00
5.00
5.00
0.00 0.00
0.00 10.00 20.00 30.00 40.00 0.00 10.00 20.00 30.00 40.00
Año normal (HM3) Año normal (HM3)
Figura N°42. Relación esc 4 - año normal Figura N°43. Relación esc 8 - año normal
Fuente: Elaboración propia Fuente: Elaboración propia
40.00
35.00
30.00 Esc 12
Esc 13
25.00
Esc 16
20.00
Esc 17
15.00 Esc 18
Esc 19
10.00
Año normal
5.00
0.00
1 2 3 4 5 6 7 8 9 10 11 12
40.00
Esc 12 (HM3)
30.00
0.00
0.00 10.00 20.00 30.00 40.00
Año normal (HM3)
33
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
40.00
35.00
30.00 Esc 22
Esc 24
25.00
Esc 25
20.00
Esc 26
15.00 Esc 27
Esc 29
10.00
Año normal
5.00
0.00
1 2 3 4 5 6 7 8 9 10 11 12
40.00
35.00
30.00
Esc 24 (HM3)
25.00
20.00
15.00
y = 0.8964x + 2.039
10.00 R² = 0.8992
5.00
0.00
0.00 10.00 20.00 30.00 40.00
Año normal (HM3)
25.00
20.00
Esc 22 (HM3)
15.00
10.00
y = 0.5344x + 1.0631
5.00
R² = 0.9483
0.00
0.00 10.00 20.00 30.00 40.00
Año normal (HM3)
Figura N°47. Relación esc 22 - año normal Figura N°48. Relación esc 24 - año normal
Fuente: Elaboración propia Fuente: Elaboración propia
34
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
40.00 40.00
Esc 27 (HM3)
Esc 26 (HM3)
30.00 30.00
20.00 20.00
Figura N°49. Relación esc 26 - año normal Figura N°50. Relación esc 27 - año normal
Fuente: Elaboración propia Fuente: Elaboración propia
40.00
35.00
30.00 Esc 31
Esc 32
25.00
Esc 34
20.00 Esc 35
Esc 36
15.00
Esc 37
10.00 Esc 39
Año normal
5.00
0.00
1 2 3 4 5 6 7 8 9 10 11 12
14.00
12.00
Esc 31 (HM3)
10.00
8.00
6.00 y = 0.248x + 3.9565
4.00 R² = 0.815
2.00
0.00
0.00 10.00 20.00 30.00 40.00
Año normal (HM3)
35
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
Cuadro N° 37 Coeficiente de determinación
Esc R2
4 0.8502
8 0.8947
12 0.8385
22 0.9483
24 0.8992
26 0.9572
27 0.9887
31 0.815
Fuente: Elaboración propia
8 Río la Gallega
8.1 Resultados de los escenarios del modelo Weap para el río la Gallega
Cuadro N° 39 Volumen de agua de los escenarios (Hm3)
Esc ago-18 sep-18 oct-18 nov-18 dic-18 ene-19 feb-19 mar-19 abr-19 may-19 jun-19 jul-19 total
1 0.64 0.35 0.32 0.81 1.35 1.82 3.81 3.66 2.57 2.07 1.25 0.69 19.33
2 1.18 0.94 0.59 1.77 2.41 1.56 2.05 3.62 3.54 3.14 2.45 1.33 24.57
3 0.70 0.40 0.28 0.23 2.89 4.51 3.96 4.53 3.66 2.47 1.58 0.93 26.15
4 0.65 0.34 0.22 0.20 0.92 2.06 3.56 6.81 7.41 4.55 2.23 1.13 30.07
5 0.34 0.25 0.26 2.46 4.27 5.06 5.60 6.24 5.80 3.83 2.10 1.04 37.25
6 0.68 0.44 0.36 1.59 13.84 11.65 6.67 6.04 5.45 4.22 2.61 1.39 54.93
7 0.47 0.25 0.18 0.17 0.23 0.36 0.90 1.63 2.50 2.70 1.83 1.02 12.25
8 0.32 0.20 0.11 0.08 0.15 0.57 1.95 10.50 9.31 3.73 1.55 0.78 29.25
9 0.51 0.30 0.19 0.14 0.13 0.62 2.08 2.08 1.37 1.07 0.80 0.62 9.91
10 0.67 0.38 0.26 0.18 0.93 2.28 2.17 2.37 26.15 13.68 4.76 2.00 55.84
11 1.50 1.16 0.60 0.37 0.48 2.16 8.56 8.61 7.00 5.38 2.93 1.38 40.12
12 1.14 0.58 0.31 0.20 0.29 0.89 1.90 11.09 10.01 4.83 2.55 1.34 35.14
13 0.66 0.46 0.32 0.26 0.37 1.39 4.01 5.69 7.44 5.60 4.40 3.45 34.05
14 0.97 0.56 0.44 1.11 1.85 1.86 3.59 8.71 9.07 8.31 5.84 2.96 45.27
36
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
Esc ago-18 sep-18 oct-18 nov-18 dic-18 ene-19 feb-19 mar-19 abr-19 may-19 jun-19 jul-19 total
15 1.78 1.53 1.17 0.86 0.54 0.85 7.08 9.05 6.70 4.48 2.27 1.30 37.61
16 0.47 0.26 0.14 0.10 0.16 0.81 2.42 3.66 3.33 2.23 1.50 1.07 16.15
17 0.54 0.29 0.19 0.20 0.19 0.40 1.74 3.40 3.86 3.43 2.31 1.21 17.76
18 0.44 0.26 0.23 0.20 0.26 0.92 2.34 3.86 4.72 3.27 1.64 0.97 19.11
19 1.34 0.87 0.76 0.61 0.41 0.73 5.32 7.15 7.81 6.05 2.87 1.43 35.34
20 1.21 1.16 1.18 0.76 3.98 12.04 14.02 9.73 4.98 2.29 1.11 0.83 53.30
21 1.56 1.66 1.46 2.43 6.69 10.37 9.42 16.75 11.87 6.43 3.30 1.45 73.40
22 0.40 0.23 0.17 0.17 0.25 0.35 2.55 6.91 5.52 2.71 1.47 0.89 21.64
23 0.43 0.26 0.24 0.29 0.59 1.26 2.28 2.41 1.81 1.24 0.71 0.44 11.96
24 0.28 0.18 0.13 0.21 0.46 0.77 3.88 11.69 9.03 5.08 2.98 1.80 36.49
25 0.42 0.22 0.14 0.14 0.15 3.96 6.81 4.78 4.96 3.54 1.87 1.25 28.25
26 0.41 0.23 0.14 0.12 0.15 0.50 4.95 12.44 8.20 4.23 2.53 1.31 35.21
27 0.34 0.20 0.17 0.17 0.23 0.71 5.52 13.37 8.03 3.16 1.58 0.93 34.41
28 0.41 0.22 0.15 0.22 0.50 2.95 8.86 12.84 9.90 5.09 2.24 1.04 44.40
29 0.60 0.33 0.35 0.75 0.76 1.11 1.99 3.19 3.32 2.42 1.57 0.84 17.24
30 0.72 0.42 0.32 0.23 0.23 0.26 0.68 1.66 2.12 1.68 1.06 0.67 10.05
31 1.13 0.65 0.39 0.37 0.93 1.82 3.14 3.77 3.22 2.33 1.47 0.82 20.05
32 0.99 0.51 0.34 0.29 0.83 2.87 4.39 4.47 3.68 2.23 1.30 0.81 22.71
33 1.29 0.96 0.60 0.39 0.82 2.17 9.84 23.76 14.22 7.72 4.15 2.04 67.93
34 1.34 0.76 0.56 0.49 0.52 1.19 2.41 3.84 5.66 5.99 3.91 2.01 28.68
35 0.65 0.53 0.43 0.39 0.50 0.48 2.03 7.83 11.07 6.88 3.17 1.53 35.50
36 0.90 0.51 0.38 0.70 1.41 1.82 2.01 2.82 2.73 2.28 1.75 0.93 18.25
37 1.27 0.75 0.44 0.44 0.54 0.75 1.34 1.97 2.90 2.54 1.51 1.24 15.68
38 0.85 0.60 0.57 0.73 4.07 5.69 5.68 8.76 8.67 5.98 3.44 1.69 46.74
39 0.49 0.32 0.21 0.15 0.27 1.30 2.83 4.93 5.28 4.81 3.42 2.02 26.02
Fuente: Modelo Weap CRHC Chira Piura, 2015
37
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
Esc ago-18 sep-18 oct-18 nov-18 dic-18 ene-19 feb-19 mar-19 abr-19 may-19 jun-19 jul-19 total
25 0.42 0.22 0.14 0.14 0.15 3.96 6.81 4.78 4.96 3.54 1.87 1.25 28.25
26 0.41 0.23 0.14 0.12 0.15 0.50 4.95 12.44 8.20 4.23 2.53 1.31 35.21
27 0.34 0.20 0.17 0.17 0.23 0.71 5.52 13.37 8.03 3.16 1.58 0.93 34.41
28 0.41 0.22 0.15 0.22 0.50 2.95 8.86 12.84 9.90 5.09 2.24 1.04 44.40
34 1.34 0.76 0.56 0.49 0.52 1.19 2.41 3.84 5.66 5.99 3.91 2.01 28.68
35 0.65 0.53 0.43 0.39 0.50 0.48 2.03 7.83 11.07 6.88 3.17 1.53 35.50
38 0.85 0.60 0.57 0.73 4.07 5.69 5.68 8.76 8.67 5.98 3.44 1.69 46.74
Fuente: Elaboración propia
30.00
25.00
Esc 4
20.00 Esc 5
Esc 6
HM3
15.00
Esc 8
10.00 Esc 10
Esc 11
5.00
Esc 12
6.00
ESC 4 (HM3)
8.00
4.00 y = 0.503x + 0.3652 6.00
R² = 0.9005 4.00
2.00 2.00
0.00 0.00
0.00 5.00 10.00 15.00 20.00 0.00 5.00 10.00 15.00 20.00
Figura N°54. Relación esc 4 - año normal Figura N°55. Relación esc 11 - año normal
Fuente: Elaboración propia Fuente: Elaboración propia
38
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
16.00
14.00
Esc 13
12.00
Esc 14
10.00
Esc 15
HM3
8.00
Esc 19
6.00
Esc 20
4.00
Esc 24
2.00
Esc 25
0.00
Año normal
1 2 3 4 5 6 7 8 9 10 11 12
MESES
10.00 14.00
12.00
8.00
Esc 24 (HM3)
Esc 15 (HM3)
10.00
6.00 y = 0.5846x + 0.6456 8.00
4.00 R² = 0.917 6.00 y = 0.752x - 0.1601
4.00 R² = 0.89
2.00 2.00
0.00 0.00
0.00 5.00 10.00 15.00 20.00 0.00 5.00 10.00 15.00 20.00
Año normal (HM3) Año normal (HM3)
Figura N°57. Relación esc 15 - año normal Figura N°58. Relación esc 24 - año normal
Fuente: Elaboración propia Fuente: Elaboración propia
16.00
14.00
12.00 Esc 26
10.00 Esc 27
HM3
8.00 Esc 28
6.00 Esc 34
4.00 Esc 35
2.00 Esc 38
39
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
14.00 16.00
12.00 14.00
10.00 12.00
Esc 27 (HM3)
Esc 26 (HM3)
10.00
8.00
8.00
6.00 6.00
4.00 4.00 y = 0.8324x - 0.6754
y = 0.7862x - 0.4126
2.00 R² = 0.9238 2.00 R² = 0.9288
0.00 0.00
-2.00 0.00 5.00 10.00 15.00 20.00
-2.00 0.00 5.00 10.00 15.00 20.00
Año normal (HM3) Año normal (HM3)
Figura N°60. Relación esc 26 - año normal Figura N°61. Relación esc 27 - año normal
Fuente: Elaboración propia Fuente: Elaboración propia
10.00
40
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
Cuadro N° 43 Índice de eficiencia
Esc Nash
4 0.7738
11 0.8826
15 0.8583
24 0.8915
26 0.9033
27 0.9071
28 0.9856
Fuente: Elaboración propia
El probable escenario es el 28
9 Río Bigote
9.1 Resultados de los escenarios del modelo Weap para el río Bigote
Cuadro N° 44 Volumen de agua de los escenarios (Hm3)
Esc ago-18 sep-18 oct-18 nov-18 dic-18 ene-19 feb-19 mar-19 abr-19 may-19 jun-19 jul-19 total
1 9.41 7.07 10.33 14.43 13.81 17.04 15.82 14.10 11.57 7.93 6.27 5.10 132.89
2 21.11 18.75 10.59 11.10 11.39 9.63 10.87 19.87 19.17 14.20 10.71 9.60 166.97
3 7.25 4.85 3.78 3.44 10.42 14.33 12.96 11.45 10.08 7.77 5.69 6.80 98.82
4 9.75 5.39 4.68 4.98 8.17 10.84 12.87 26.71 35.98 23.35 12.50 12.22 167.44
5 3.48 4.24 5.75 12.02 13.74 13.02 14.48 32.41 31.26 17.27 11.54 9.45 168.66
6 6.45 5.49 6.81 9.50 23.55 22.45 13.75 14.99 18.67 17.59 12.48 7.24 158.97
7 5.10 3.77 4.18 4.11 4.47 4.40 4.67 5.52 6.31 7.57 6.76 5.23 62.08
8 5.50 3.75 2.77 2.10 2.44 9.14 37.71 54.43 37.04 18.14 9.43 6.13 188.59
9 3.86 3.07 2.52 2.24 2.48 3.99 6.06 5.47 4.49 3.67 4.61 6.08 48.55
10 3.97 3.62 3.83 3.39 4.70 7.19 6.97 8.17 21.93 20.69 10.64 5.98 101.09
11 7.79 8.05 5.18 4.13 4.66 9.20 29.94 38.34 33.11 19.61 8.86 4.77 173.64
12 4.27 2.88 2.50 2.41 2.53 5.17 14.55 88.28 56.65 24.87 11.68 7.05 222.84
13 5.37 4.36 4.56 4.74 5.56 15.82 23.00 18.73 18.57 18.67 14.06 9.54 142.98
14 5.04 3.66 5.13 8.78 9.22 8.80 12.98 23.29 21.84 18.11 12.55 7.38 136.79
15 11.82 13.48 10.14 7.21 5.73 7.60 22.96 30.74 30.13 19.95 10.02 6.07 175.85
16 3.34 2.75 3.31 3.76 4.41 5.09 9.14 14.34 12.27 9.41 6.96 4.98 79.77
17 3.10 2.13 2.16 2.84 3.51 7.38 21.57 24.46 19.03 16.23 11.17 6.45 120.02
18 2.60 2.29 2.24 2.26 3.76 7.19 9.92 16.85 20.03 13.26 7.61 5.18 93.20
19 6.73 5.73 7.56 7.75 5.39 8.30 18.03 20.93 22.04 16.93 9.33 5.85 134.56
20 4.89 9.58 13.70 10.13 14.61 20.99 20.82 19.03 15.02 9.49 6.12 5.43 149.81
21 12.11 16.38 13.98 11.03 15.54 18.83 18.45 28.87 23.59 20.89 15.48 7.70 202.85
22 3.75 3.65 3.64 4.13 4.44 3.91 12.12 33.40 26.86 14.47 9.09 5.88 125.34
23 3.25 2.45 2.16 2.73 5.86 9.38 11.85 12.29 11.04 8.15 5.17 3.71 78.04
24 2.01 1.62 1.92 3.35 5.23 8.38 76.41 140.54 52.71 23.09 12.97 8.22 336.44
25 3.87 2.96 2.59 3.31 4.78 7.15 8.19 11.17 22.15 19.24 10.63 6.70 102.74
26 3.93 3.30 3.16 2.89 3.19 5.56 13.29 20.79 17.62 14.31 10.48 6.04 104.56
27 2.46 1.67 1.41 1.61 2.34 4.71 40.10 56.06 31.70 16.82 9.29 6.10 174.28
41
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
Esc ago-18 sep-18 oct-18 nov-18 dic-18 ene-19 feb-19 mar-19 abr-19 may-19 jun-19 jul-19 total
28 4.25 2.86 2.47 2.85 3.61 7.84 18.49 30.61 34.58 23.30 12.23 6.73 149.81
29 4.41 2.68 3.97 6.96 5.73 7.12 14.07 20.91 18.65 11.75 7.19 4.73 108.16
30 4.59 4.01 4.38 3.52 3.91 4.90 9.16 22.29 23.64 13.79 8.13 5.43 107.75
31 6.09 4.77 4.39 4.16 6.25 9.24 22.10 31.80 23.24 13.58 7.82 4.69 138.12
32 5.34 3.40 2.82 3.53 7.70 15.14 20.85 26.60 21.19 13.44 8.95 5.78 134.74
33 8.21 8.39 7.80 8.23 9.07 10.37 37.25 46.96 37.32 24.64 13.50 8.34 220.08
34 6.49 5.58 6.63 6.27 5.32 10.05 15.01 18.85 24.50 22.05 14.79 9.18 144.74
35 3.88 5.04 5.40 4.47 5.04 5.16 22.43 87.62 57.47 28.00 13.05 6.57 244.13
36 4.54 3.83 4.61 5.85 11.77 14.73 11.96 19.43 21.92 15.69 10.15 6.10 130.57
37 6.60 4.65 3.73 3.90 5.93 7.44 7.51 7.59 9.16 8.57 5.52 4.53 75.12
38 5.19 5.16 5.25 5.26 10.06 12.28 32.56 52.00 38.74 24.36 14.52 8.77 214.14
39 4.69 3.62 3.23 3.29 4.33 7.50 9.48 13.11 19.87 18.16 10.79 6.33 104.40
Fuente: Modelo Weap CRHC Chira Piura, 2015
42
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
Esc ago-18 sep-18 oct-18 nov-18 dic-18 ene-19 feb-19 mar-19 abr-19 may-19 jun-19 jul-19 total
31 6.09 4.77 4.39 4.16 6.25 9.24 22.10 31.80 23.24 13.58 7.82 4.69 138.12
32 5.34 3.40 2.82 3.53 7.70 15.14 20.85 26.60 21.19 13.44 8.95 5.78 134.74
34 6.49 5.58 6.63 6.27 5.32 10.05 15.01 18.85 24.50 22.05 14.79 9.18 144.74
36 4.54 3.83 4.61 5.85 11.77 14.73 11.96 19.43 21.92 15.69 10.15 6.10 130.57
37 6.60 4.65 3.73 3.90 5.93 7.44 7.51 7.59 9.16 8.57 5.52 4.53 75.12
39 4.69 3.62 3.23 3.29 4.33 7.50 9.48 13.11 19.87 18.16 10.79 6.33 104.40
Fuente: Elaboración propia
60.00
Esc 1
50.00
Esc 2
40.00 Esc 3
Esc 4
HM3
30.00
Esc 5
20.00 Esc 6
Esc 8
10.00
Esc 10
Esc 11
0.00
1 2 3 4 5 6 7 8 9 10 11 12 Año normal
MESES
R² = 0.9796
Esc 8 (HM3)
40.00 30.00
30.00
20.00
20.00
10.00 10.00
0.00 0.00
0.00 20.00 40.00 60.00 0.00 20.00 40.00 60.00
Año normal (HM3) Año normal (HM3)
43
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
Figura N°64. Relación esc 8 - año normal Figura N°65. Relación esc 11 - año normal
Fuente: Elaboración propia Fuente: Elaboración propia
60.00
Esc 13
50.00 Esc 14
Esc 15
40.00
Esc 16
Esc 17
HM3
30.00
Esc 18
Esc 19
20.00
Esc 20
Esc 22
10.00
Esc 23
0.00 Esc 25
1 2 3 4 5 6 7 8 9 10 11 12 Año normal
MESES
20.00 40.00
Esc 22 (HM3)
Esc 16 (HM3)
15.00 30.00
10.00 20.00
44
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
60.00
Esc 26
50.00 Esc 27
Esc 28
40.00 Esc 29
Esc 30
HM3
30.00
Esc 31
Esc 32
20.00
Esc 34
10.00 Esc 36
Esc 37
0.00 Esc 39
1 2 3 4 5 6 7 8 9 10 11 12
Año normal
MESES
60.00 25.00
50.00 20.00
y = 0.3398x + 4.4617
Esc 27 (HM3)
Esc 29 (HM3)
40.00
15.00 R² = 0.9425
30.00 y = 1.0433x + 0.5462
R² = 0.9547 10.00
20.00
10.00 5.00
0.00 0.00
0.00 20.00 40.00 60.00 0.00 20.00 40.00 60.00
Figura N°69. Relación esc 27 - año normal Figura N°70. Relación esc 29 - año normal
Fuente: Elaboración propia Fuente: Elaboración propia
35.00
30.00
y = 0.5358x + 4.3315
Esc 31 (HM3)
25.00
R² = 0.9856
20.00
15.00
10.00
5.00
0.00
0.00 20.00 40.00 60.00
Año normal (HM3)
45
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
Cuadro N° 47 Coeficiente de determinación
Esc R2
8 0.9796
11 0.9492
16 0.9107
22 0.9209
27 0.9547
29 0.9425
31 0.9856
Fuente: Elaboración propia
46
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC Total
1990 105.90 209.70 256.60 365.40 231.60 217.40 112.30 68.90 39.30 30.00 52.20 90.70 1,780.00
1991 89.40 220.80 609.70 320.80 209.40 124.50 119.40 81.00 49.80 44.20 65.20 45.00 1,979.20
1992 69.00 202.70 1,262.80 2,253.10 568.70 255.20 123.10 65.60 52.00 26.50 40.80 73.90 4,993.40
1993 97.60 365.10 1,835.70 1,454.20 451.80 255.30 199.00 109.70 73.50 95.00 94.70 219.00 5,250.60
1994 405.90 930.80 882.90 965.20 373.60 285.50 204.70 165.00 147.90 126.50 104.70 158.30 4,751.00
1995 159.90 205.10 264.60 278.10 192.40 112.10 72.50 17.10 23.00 25.10 74.00 70.20 1,494.10
1996 115.30 204.30 594.70 212.60 147.30 92.80 87.20 59.50 31.90 37.60 16.20 31.70 1,631.10
1997 52.30 147.60 320.50 257.80 207.50 80.90 95.90 66.10 36.10 21.40 89.90 863.90 2,239.90
1998 2,249.30 3,076.40 4,498.00 4,826.20 1,566.20 507.10 249.60 179.40 125.50 102.90 120.30 55.10 17,556.00
1999 202.70 1,232.90 2,603.20 837.00 791.50 454.00 273.40 154.90 108.80 75.10 65.90 218.00 7,017.40
2000 190.40 610.50 1,880.10 1,561.40 773.90 413.30 241.30 152.10 101.60 58.50 24.90 105.60 6,113.60
2001 246.50 388.30 2,245.00 1,393.80 389.70 411.40 215.50 145.40 64.50 69.30 107.80 107.50 5,784.70
2002 147.60 345.00 1,976.30 2,083.20 571.30 262.20 237.60 138.90 66.60 99.00 124.50 158.50 6,210.70
2003 157.50 230.80 342.20 355.80 318.60 162.50 108.60 62.10 44.60 48.90 36.10 124.30 1,992.00
2004 141.30 117.10 208.10 235.50 149.70 185.00 98.00 51.70 41.40 55.60 67.20 145.10 1,495.70
2005 71.00 283.90 851.90 412.60 183.50 146.50 79.20 51.80 41.70 37.50 59.00 82.30 2,300.90
2006 158.50 893.00 1,387.60 1,093.40 238.50 175.30 95.10 72.20 57.60 48.00 65.30 136.70 4,421.20
2007 161.30 153.60 417.30 403.00 221.90 222.70 82.10 95.70 69.40 64.20 136.20 98.70 2,126.10
2008 220.00 1,635.30 2,809.00 2,165.20 774.50 356.20 271.40 158.80 103.60 115.70 141.10 116.80 8,867.60
2009 639.43 1,312.02 2,073.91 1,179.10 602.70 301.53 281.61 174.92 118.47 108.22 78.23 112.60 6,982.74
2010 137.50 398.40 560.80 614.40 360.30 186.80 101.58 77.00 70.50 37.29 49.22 63.47 2,657.26
2011 120.46 490.59 206.21 666.98 281.28 166.32 232.29 74.01 100.15 87.90 84.07 197.30 2,707.56
2012 680.41 2,701.23 2,290.31 1,382.96 560.49 285.54 201.03 121.73 90.05 91.41 138.06 155.71 8,698.93
2013 241.60 273.00 378.40 176.35 168.82 179.87 130.49 89.68 71.02 91.63 30.83 63.00 1,894.69
2014 125.87 98.28 521.68 193.78 344.98 262.57 148.12 112.76 77.24 87.05 62.73 101.51 2,136.57
2015 231.13 229.10 1,440.98 1,007.77 398.01 353.03 210.25 117.58 92.02 92.67 87.35 102.05 4,361.94
2016 153.63 326.79 1,415.13 590.46 352.53 215.73 163.11 100.90 66.04 47.51 15.86 3,447.69
Prom. 284.07 588.62 1,115.54 914.59 423.78 261.37 168.93 107.54 76.70 80.39 75.46 140.53 4,237.53
Fuente: Proyecto Especial Chira - Piura y AAA Jequetepeque-Zarumilla (Propiedad Especial Chira-Piura)
Nota : 1937-1975 en estación Puente Sullana; 1976-2010 con balance hídrico en ardill; 1976 inicio operación Presa Poechos
m SEP OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO p
1 193.97 292.38 157.77 863.9 2,249.30 3,076.40 4,498.00 4,826.20 2,485.99 1,562.46 450.49 232.76 2.44
2 153.27 183.6 141.1 480.3 2,009.49 2,701.23 2,851.80 3,673.56 1,566.20 507.10 343.01 217.47 4.88
3 147.9 128 138.06 232.59 680.41 1,823.04 2,809.00 2,253.10 791.50 454.00 281.61 179.40 7.32
4 129.34 126.5 136.2 219 639.43 1,635.30 2,603.20 2,165.20 774.50 426.12 273.40 174.92 9.76
5 125.5 115.7 134.78 218 405.90 1,312.02 2,290.31 2,083.20 773.90 413.30 271.40 165.00 12.20
6 118.47 113.79 129.08 198.72 289.50 1,232.90 2,245.00 1,561.40 602.70 411.40 249.60 158.80 14.63
7 108.8 108.35 124.5 197.3 266.37 1,089.59 2,073.91 1,454.20 571.30 356.20 241.30 154.90 17.07
8 103.6 108.22 120.3 181.44 246.50 930.80 1,976.30 1,393.80 568.70 353.03 237.60 152.10 19.51
47
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
m SEP OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO p
9 101.6 102.9 108.09 158.5 243.82 893.00 1,919.72 1,382.96 560.49 301.53 232.29 145.40 21.95
10 100.66 99 107.8 158.3 241.60 738.30 1,880.10 1,198.37 492.83 285.54 215.50 138.90 24.39
11 100.15 96.68 104.7 155.71 231.13 610.50 1,835.70 1,179.10 484.01 285.50 210.25 132.62 26.83
12 92.02 95 94.7 145.1 223.43 516.84 1,440.98 1,093.40 451.80 262.57 208.83 121.73 29.27
13 90.05 92.67 89.9 136.7 220.00 490.59 1,415.13 1,007.77 398.01 262.20 204.70 117.58 31.71
14 83.98 91.63 87.35 124.59 202.70 468.29 1,387.60 965.20 389.70 258.60 201.03 116.12 34.15
15 78.45 91.41 84.07 124.3 190.40 398.40 1,262.80 837.00 373.60 255.30 199.00 112.76 36.59
16 77.24 89.51 78.23 116.8 179.02 388.30 1,131.50 796.60 360.30 255.20 185.50 111.02 39.02
17 73.5 87.9 74 115.08 176.26 365.10 1,001.72 724.20 358.10 240.50 163.11 109.70 41.46
18 72.23 87.05 73.18 112.6 161.30 345.00 882.90 671.33 352.53 222.70 157.40 105.15 43.90
19 71.02 77.85 73.09 107.5 159.90 328.41 851.90 666.98 351.22 217.40 148.12 100.90 46.34
20 70.5 76.46 71.19 105.6 158.50 326.79 777.08 614.40 344.98 215.73 130.49 95.70 48.78
21 69.4 75.1 67.2 104.54 157.50 308.24 742.26 590.46 318.60 193.10 127.09 89.68 51.22
22 68.52 74.39 65.9 102.05 153.63 283.90 609.70 412.60 281.28 186.80 123.10 89.20 53.66
23 66.6 73.44 65.3 101.51 147.60 273.00 594.70 403.00 238.50 185.00 121.48 81.00 56.10
24 65.8 69.3 65.2 98.7 141.30 230.80 560.80 384.31 231.60 179.87 119.40 78.97 58.54
25 64.89 64.2 62.73 95.21 140.49 229.10 521.68 365.40 223.86 175.30 112.30 77.00 60.98
26 64.5 59.01 59 90.7 137.50 226.89 449.63 357.35 221.90 168.31 108.60 74.01 63.41
27 60.22 58.5 52.4 83.81 125.87 220.80 417.30 355.80 209.40 166.32 106.53 72.20 65.85
28 57.6 55.6 52.2 82.3 120.46 209.70 378.40 320.80 207.50 162.50 102.04 70.93 68.29
29 52 51.06 49.22 80.44 115.30 205.10 342.20 278.10 192.40 146.50 101.58 68.90 70.73
30 49.8 48.9 48.76 77.93 112.67 204.30 320.50 273.63 183.50 145.32 98.00 68.86 73.17
31 45.79 48 47.78 77.76 105.90 202.70 287.28 267.15 168.82 136.51 97.37 66.10 75.61
32 44.6 46.98 47.35 73.9 105.06 200.10 270.86 266.41 164.59 124.50 95.90 65.60 78.05
33 41.7 44.2 46.14 70.2 104.54 153.60 264.60 257.80 163.73 117.42 95.10 62.47 80.49
34 41.47 37.6 42.08 63.47 104.54 147.60 256.60 235.50 161.48 112.10 92.28 62.10 82.93
35 41.4 37.5 40.8 63 97.60 144.37 251.51 225.59 158.46 109.21 88.30 59.50 85.37
36 39.3 37.29 36.1 55.1 96.68 131.07 225.59 212.60 149.70 106.96 87.20 51.80 87.80
37 36.1 30 30.83 49.2 89.40 118.89 213.58 197.16 148.69 92.80 82.10 51.70 90.24
38 31.9 26.5 29.81 45 71.00 117.10 208.10 193.78 147.30 85.88 79.20 50.11 92.68
39 23 25.1 24.9 31.7 69.00 98.28 206.21 180.32 136.68 80.90 78.77 28.94 95.12
40 21.88 21.4 16.2 22.8 52.30 95.82 156.56 176.35 111.89 61.26 72.50 17.10 97.56
Prome 76.97 81.22 76.95 140.53 285.58 586.80 1,110.32 912.55 421.81 257.07 164.84 103.23 4,217.87
P(50%) 69.95 75.78 69.20 105.07 158.00 317.52 759.67 602.43 331.79 204.42 128.79 92.69 2,915.30
P(75%) 46.79 48.23 48.03 77.80 107.59 203.10 295.59 268.77 172.49 138.71 97.53 66.79 1,571.41
P(90%) 36.42 30.73 31.36 49.79 90.13 120.11 214.78 198.70 148.79 94.22 82.61 51.71 1,149.34
P(95%) 23.45 25.17 25.15 32.37 69.10 99.22 206.30 180.99 137.21 81.15 78.79 30.00 988.89
Fuente: DCERH-ANA
48
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
1,200.00
1,000.00
800.00
HM3
600.00
400.00
200.00
0.00
SEP OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO
MESES
Figura N°72. Variación mensual de volúmenes de las descargas medias – Río Chira
Fuente: Elaboración propia
49
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC Total
1992 0.00 0.61 265.35 749.67 121.24 27.30 5.44 0.08 0.00 0.00 0.00 0.00 1169.69
1993 0.00 33.89 393.38 1069.34 220.27 61.02 33.25 1.90 0.33 0.00 0.00 0.05 1813.43
1994 5.13 133.16 86.99 313.48 103.61 29.36 13.43 7.94 0.97 0.09 0.01 0.00 694.17
1995 0.75 7.98 7.60 33.32 5.37 1.79 0.10 0.00 0.00 0.00 0.00 0.00 56.91
1996 1.19 1.36 16.30 5.40 0.50 0.00 0.00 0.01 0.00 0.05 0.00 0.00 24.81
1997 0.00 0.00 40.58 8.87 3.19 0.51 0.06 0.00 0.00 0.00 0.00 113.81 167.02
1998 575.20 812.42 1252.37 1508.72 817.86 341.88 152.75 47.53 14.49 5.71 2.64 0.04 5531.61
1999 0.00 406.51 658.89 314.58 232.67 92.53 56.15 13.49 5.09 0.26 0.03 13.48 1793.67
2000 0.00 156.32 557.91 522.59 336.10 85.32 69.64 37.38 2.75 0.06 0.01 0.62 1768.70
2001 92.55 149.80 920.83 441.66 180.65 95.46 46.69 16.10 7.56 0.92 0.85 1.39 1954.47
2002 2.86 122.99 699.69 826.43 112.35 55.17 18.40 10.66 7.46 5.22 0.39 0.62 1862.26
2003 16.45 67.63 150.55 45.94 14.47 7.49 4.86 2.18 0.36 0.00 0.00 0.00 309.93
2004 0.00 0.41 6.51 33.77 6.00 0.52 0.00 0.00 0.00 0.00 0.00 0.00 47.20
2005 0.00 0.00 182.19 49.17 7.44 0.50 0.00 0.00 0.00 0.00 0.00 0.00 239.30
2006 0.00 139.83 516.36 307.25 45.14 8.94 1.86 0.00 0.00 0.00 0.00 0.00 1019.37
2007 0.00 0.00 90.69 38.51 7.26 2.18 0.00 0.00 0.00 0.00 0.00 0.00 138.64
2008 12.07 657.36 860.23 669.96 209.11 128.58 78.85 26.27 6.68 2.26 3.17 2.06 2656.60
2009 170.30 500.54 567.56 231.05 133.21 39.58 16.15 2.95 0.07 0.00 0.00 3.44 1664.85
2010 15.12 181.28 278.46 259.80 95.59 22.91 5.98 1.98 0.00 0.00 0.00 0.00 861.11
2011 0.00 62.86 4.06 114.13 26.27 7.24 2.15 0.00 0.00 0.00 0.00 0.00 216.70
2012 43.10 819.18 546.73 356.88 154.67 77.38 33.52 22.03 5.18 0.00 0.00 0.00 2058.67
2013 8.57 22.39 184.89 36.52 15.19 19.65 4.38 0.51 0.00 0.00 0.00 0.00 292.09
2014 0.00 0.00 60.36 8.29 10.45 5.44 0.54 0.00 0.00 0.00 0.00 0.00 85.08
2015 0.00 0.00 351.67 236.65 71.25 36.94 10.18 0.00 0.00 0.00 0.00 0.00 706.69
2016 0.00 0.00 426.94 159.93 46.34 13.48 2.68 0.00 0.00 0.00 0.00
Max 575.20 819.18 1252.37 1508.72 866.27 608.26 181.35 57.54 23.28 20.33 10.63 113.81 5531.61
Prom 35.15 142.21 310.96 260.65 98.68 43.54 18.32 6.16 1.80 0.83 0.46 5.38 924.14
Min 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
Fuente : AAA Jequetepeque-Zarumilla(Propiedad Proyecto Especial Chira-Piura)
Nota: Los números en color azul son datos completados
m SET OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO p
1 23.28 20.33 10.63 113.81 575.20 819.18 1252.37 1508.72 866.27 608.26 181.35 57.54 2.22
2 14.49 5.71 3.17 75.92 510.02 812.42 920.83 1165.52 817.86 341.88 152.75 47.53 4.44
3 7.56 5.22 2.64 17.52 170.30 657.36 874.30 1069.34 336.10 128.58 78.85 37.38 6.67
4 7.46 2.26 2.52 13.48 92.55 569.34 860.23 826.43 232.67 95.46 69.64 26.27 8.89
5 6.68 0.92 0.85 3.85 59.90 500.54 699.69 749.67 220.27 92.53 56.15 22.03 11.11
6 5.18 0.82 0.50 3.44 43.10 418.38 658.89 669.96 209.11 85.32 46.69 16.10 13.33
7 5.09 0.78 0.39 2.59 25.67 406.51 567.56 522.59 180.65 77.38 33.52 13.49 15.56
8 2.75 0.72 0.10 2.06 16.45 355.13 564.81 441.66 154.67 61.02 33.25 10.66 17.78
50
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
m SET OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO p
9 1.88 0.35 0.03 1.41 15.32 287.13 557.91 356.88 133.21 55.17 26.18 7.96 20.00
10 1.49 0.26 0.01 1.39 15.12 205.23 546.73 329.33 121.24 39.58 18.40 7.94 22.22
11 1.38 0.09 0.01 0.62 12.07 181.28 540.01 314.58 112.35 37.13 16.15 5.69 24.44
12 0.97 0.06 0.00 0.62 11.65 156.32 516.36 313.48 107.62 36.94 13.43 3.84 26.67
13 0.95 0.05 0.00 0.05 8.57 149.80 458.33 308.91 103.61 29.99 11.75 2.95 28.89
14 0.89 0.00 0.00 0.04 6.64 139.83 426.94 307.25 98.05 29.75 10.81 2.71 31.11
15 0.36 0.00 0.00 0.00 5.26 133.16 393.38 292.58 95.59 29.36 10.18 2.36 33.33
16 0.33 0.00 0.00 0.00 5.13 126.88 381.42 259.80 83.08 27.30 7.90 2.18 35.56
17 0.09 0.00 0.00 0.00 2.86 122.99 351.67 242.99 80.06 22.91 6.51 1.98 37.78
18 0.07 0.00 0.00 0.00 2.17 83.00 341.88 236.65 71.80 19.65 6.51 1.96 40.00
19 0.00 0.00 0.00 0.00 1.89 67.63 278.46 231.05 71.25 19.44 5.98 1.90 42.22
20 0.00 0.00 0.00 0.00 1.19 62.86 265.35 218.91 46.83 16.04 5.44 0.51 44.44
21 0.00 0.00 0.00 0.00 0.75 33.89 243.79 189.29 46.34 14.23 4.86 0.23 46.67
22 0.00 0.00 0.00 0.00 0.00 22.39 242.62 171.62 45.14 13.48 4.38 0.08 48.89
23 0.00 0.00 0.00 0.00 0.00 16.65 232.68 159.93 36.35 8.94 2.68 0.01 51.11
24 0.00 0.00 0.00 0.00 0.00 13.29 184.89 114.13 26.27 8.54 2.15 0.00 53.33
25 0.00 0.00 0.00 0.00 0.00 11.36 182.19 49.17 15.19 7.49 1.86 0.00 55.56
26 0.00 0.00 0.00 0.00 0.00 9.68 150.55 45.94 14.47 7.24 1.45 0.00 57.78
27 0.00 0.00 0.00 0.00 0.00 7.98 111.01 43.02 12.50 5.44 0.76 0.00 60.00
28 0.00 0.00 0.00 0.00 0.00 3.82 90.69 41.53 10.45 2.18 0.54 0.00 62.22
29 0.00 0.00 0.00 0.00 0.00 1.36 86.99 38.51 7.44 1.79 0.43 0.00 64.44
30 0.00 0.00 0.00 0.00 0.00 0.61 76.78 36.52 7.26 1.47 0.10 0.00 66.67
31 0.00 0.00 0.00 0.00 0.00 0.41 60.36 33.77 6.00 1.35 0.06 0.00 68.89
32 0.00 0.00 0.00 0.00 0.00 0.00 50.37 33.32 5.37 0.52 0.00 0.00 71.11
33 0.00 0.00 0.00 0.00 0.00 0.00 40.58 24.43 4.26 0.51 0.00 0.00 73.33
34 0.00 0.00 0.00 0.00 0.00 0.00 27.39 16.49 3.54 0.50 0.00 0.00 75.56
35 0.00 0.00 0.00 0.00 0.00 0.00 22.04 16.24 3.19 0.42 0.00 0.00 77.78
36 0.00 0.00 0.00 0.00 0.00 0.00 19.72 12.67 0.91 0.00 0.00 0.00 80.00
37 0.00 0.00 0.00 0.00 0.00 0.00 16.30 11.31 0.50 0.00 0.00 0.00 82.22
38 0.00 0.00 0.00 0.00 0.00 0.00 7.73 8.87 0.37 0.00 0.00 0.00 84.44
39 0.00 0.00 0.00 0.00 0.00 0.00 7.60 8.29 0.35 0.00 0.00 0.00 86.67
40 0.00 0.00 0.00 0.00 0.00 0.00 6.51 5.40 0.00 0.00 0.00 0.00 88.89
41 0.00 0.00 0.00 0.00 0.00 0.00 4.06 2.23 0.00 0.00 0.00 0.00 91.11
42 0.00 0.00 0.00 0.00 0.00 0.00 1.11 0.00 0.00 0.00 0.00 0.00 93.33
43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 95.56
44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 97.78
Prome 1.84 0.85 0.47 5.38 35.95 144.92 302.80 259.75 99.73 43.81 18.43 6.21 920.14
P(50%) 0.00 0.00 0.00 0.00 0.00 19.52 237.65 165.78 40.74 11.21 3.53 0.04 478.48
P(75%) 0.00 0.00 0.00 0.00 0.00 0.00 30.69 18.48 3.72 0.50 0.00 0.00 53.39
P(90%) 0.00 0.00 0.00 0.00 0.00 0.00 5.28 3.81 0.00 0.00 0.00 0.00 9.10
P(95%) 0.00 0.00 0.00 0.00 0.00 0.00 0.28 0.00 0.00 0.00 0.00 0.00 0.28
Fuente: DCERH-ANA
51
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
350.00
300.00
250.00
200.00
HM3
150.00
100.00
50.00
0.00
SET OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO
MESES
Figura N°73. Variación mensual de volúmenes de las descargas medias – Río Piura
Fuente: Elaboración propia
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC Total
1954 25.4 17.1 19 13 6 80.50
1955 19.30 61.00 97.50 50.20 87.50 46.00 42.00 30.00 25.00 11.00 7.20 6.20 482.90
1956 38.00 86.41 30.40 71.30 52.40 37.00 37.40 25.50 23.30 25.00 9.30 7.30 443.31
1957 17.00 37.40 23.40 76.01 21.50 26.00 20.40 23.40 17.20 16.00 2.20 8.00 288.51
1958 56.40 74.10 73.20 105.00 87.40 21.00 36.10 25.81 21.07 21.07 4.00 3.40 528.55
1959 9.00 33.00 66.00 80.50 57.00 34.10 49.30 24.40 29.20 25.20 29.00 24.00 460.70
1960 23.00 94.62 78.00 94.00 66.20 42.10 26.00 25.50 30.30 4.10 2.40 12.00 498.22
1961 28.00 29.05 98.00 80.50 87.20 41.00 34.00 21.00 20.10 29.50 11.00 28.00 507.35
1962 61.00 101.20 107.40 96.00 78.00 42.30 41.10 26.00 34.40 27.00 21.10 31.50 667.00
1963 34.10 51.20 101.50 73.10 50.00 31.30 29.40 13.00 8.50 16.40 17.20 48.00 473.70
1964 37.00 46.34 54.20 63.30 59.20 46.40 26.00 34.50 37.50 36.00 26.50 7.10 474.04
1965 22.20 41.50 46.00 90.00 33.00 64.20 41.00 28.00 33.40 26.00 38.00 21.00 484.30
1966 55.40 47.10 67.00 71.00 51.00 25.00 30.40 18.00 13.20 22.00 13.00 9.30 422.40
1967 58.20 66.50 75.10 67.00 48.00 33.30 47.00 37.20 14.40 23.40 9.00 13.00 492.10
1968 28.40 14.97 90.00 55.00 20.50 14.00 41.00 24.50 18.40 21.20 10.10 0.09 338.16
1969 20.00 50.50 47.20 76.10 32.50 16.00 20.00 34.00 21.00 9.00 15.30 31.00 372.60
1970 73.10 71.10 96.00 69.00 77.20 78.40 42.00 33.00 25.00 31.20 33.00 60.00 689.00
52
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC Total
1971 68.00 74.10 75.10 49.00 74.40 61.20 53.00 48.00 44.00 39.20 17.00 16.40 619.40
1972 64.00 35.72 21.50 13.20 36.50 32.00 40.00 23.00 37.00 19.20 18.00 5.00 345.12
1973 38.30 5.40 21.00 25.00 9.00 40.10 35.40 34.00 28.00 16.00 19.30 3.00 274.50
1974 50.10 92.30 92.00 53.00 44.20 40.00 57.20 25.40 17.50 27.50 28.10 66.00 593.30
1975 83.00 81.00 89.00 35.00 81.00 54.00 47.00 54.40 33.00 32.00 29.30 2.00 620.70
1976 44.00 87.86 29.20 49.00 30.30 15.00 46.50 53.00 26.00 9.10 13.00 25.00 427.96
1977 50.40 83.00 96.00 109.00 49.50 52.00 34.40 26.00 18.00 21.20 12.50 24.20 576.20
1978 24.00 29.10 62.40 63.30 40.20 43.30 33.50 27.40 21.40 31.20 9.40 17.00 402.20
1979 31.20 26.00 110.50 74.00 38.00 32.20 31.40 14.00 11.50 15.00 5.20 17.10 406.10
1980 21.00 53.59 70.00 76.40 48.10 43.00 26.20 8.10 8.30 21.00 3.00 8.00 386.69
1981 17.00 52.10 58.40 77.10 34.50 33.00 24.00 10.00 7.50 12.00 9.00 31.20 365.80
1982 28.20 51.00 32.00 54.00 32.40 17.00 23.30 20.30 19.10 25.00 16.00 81.50 399.80
1983 78.00 79.35 75.32 68.04 33.37 22.65 50.54 24.59 14.59 29.49 18.00 61.00 554.94
1984 59.00 73.38 6.00 83.30 90.40 58.00 50.00 29.20 19.00 28.00 25.00 28.26 549.54
1985 36.50 62.00 53.00 44.50 59.30 48.00 36.00 33.00 18.00 18.00 13.00 24.00 445.30
1986 51.00 76.00 65.20 90.00 62.30 21.30 34.50 17.40 17.00 17.00 21.10 40.00 512.80
1987 59.40 69.00 61.00 73.00 70.00 29.30 54.20 17.00 13.00 12.00 10.00 22.00 489.90
1988 39.10 65.65 61.10 52.20 32.00 16.50 27.30 17.00 14.00 17.40 22.40 24.00 388.65
1989 83.00 120.00 124.00 76.30 81.00 52.00 37.00 23.20 21.00 26.00 18.00 13.30 674.80
1990 46.00 50.00 74.00 86.00 56.00 66.00 33.00 23.00 15.00 18.20 23.30 34.70 525.20
1991 29.00 49.10 101.00 60.40 41.20 30.00 32.00 26.20 16.00 14.30 17.50 19.30 436.00
1992 31.00 28.10 43.00 11.00 34.40 37.00 29.00 17.20 20.00 16.40 23.10 30.50 320.70
1993 36.00 59.40 124.00 67.00 50.33 33.76 31.98 29.70 22.20 32.30 33.90 64.30 584.87
1994 92.10 93.10 133.30 103.06 78.30 61.70 50.40 31.90 31.70 18.90 24.30 43.00 761.76
1995 48.90 38.40 77.50 47.36 46.43 23.31 29.00 12.53 10.25 9.88 30.03 33.54 407.13
1996 52.62 76.02 129.42 70.26 46.57 29.26 29.47 32.42 17.55 21.32 17.19 22.29 544.39
1997 25.35 68.36 75.34 53.64 56.02 22.56 31.96 23.89 17.44 19.20 31.53 50.33 475.62
1998 35.71 17.89 5.36 9.81 21.56 24.36 23.70 14.66 12.87 14.33 19.28 15.27 214.80
1999 57.86 95.98 70.91 46.67 34.15 41.53 23.64 27.85 21.98 22.54 14.73 55.68 513.52
2000 34.64 88.34 165.53 154.44 126.10 87.94 41.16 28.20 38.85 21.44 15.02 50.79 852.45
2001 80.65 76.29 165.53 109.60 57.83 93.84 54.65 44.12 24.32 23.85 44.84 38.67 814.19
2002 60.55 114.83 165.53 160.19 81.95 37.71 54.03 30.09 20.92 28.01 38.41 48.73 840.95
2003 61.19 55.81 78.42 116.60 112.89 56.14 36.24 18.18 15.83 19.80 22.13 40.32 633.55
2004 45.96 28.09 67.34 52.57 36.72 57.08 34.28 20.32 16.76 22.35 29.72 58.66 469.85
2005 39.99 115.26 165.53 126.31 53.80 46.07 25.06 14.12 14.43 17.49 29.72 32.06 679.84
2006 69.15 149.51 165.53 152.27 55.60 44.79 49.87 34.90 12.80 16.74 10.39 6.99 768.54
2007 66.95 42.70 82.04 100.49 63.32 68.43 27.55 17.90 17.10 25.52 60.32 34.93 607.25
2008 94.01 149.51 165.53 160.19 110.22 86.16 50.81 32.62 29.55 37.00 40.32 28.91 984.82
2009 147.56 149.51 165.53 160.19 99.63 51.45 45.63 38.43 31.28 29.58 26.64 41.38 986.81
2010 49.84 101.48 63.68 79.15 63.84 38.12 28.47 24.81 23.59 17.88 25.63 28.61 545.10
2011 58.21 130.46 65.48 160.19 93.99 62.63 76.82 23.93 33.18 32.19 36.41 85.27 858.76
2012 165.53 149.51 165.53 160.19 96.32 62.78 43.90 37.07 25.01 36.41 54.63 61.28 1058.16
2013 103.12 72.78 99.56 54.42 60.57 72.24 60.57 22.53 20.85 39.82 19.00 30.26 655.72
53
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC Total
2014 51.76 39.11 139.99 61.96 88.86 74.52 31.37 39.51 21.99 29.02 27.90 43.46 649.45
2015 89.59 76.72 91.77 25.35 65.07 47.35 48.10 31.21 19.92 34.19 27.72 42.16 599.16
2016 36.66 88.19 165.53 94.00 70.36 59.72 34.07 23.93 19.95 19.68 11.10 28.19 651.39
2017 73.23 91.70 165.53 160.19 115.65 61.60 45.10 34.31 23.92 35.84 23.09 32.36 862.52
Prom 52.20 70.14 87.79 79.79 59.88 44.23 38.20 26.74 21.51 22.77 21.17 30.49 554.91
Fuente:DCPRH y AAA Jequetepeque Zarumila (Propiedad Proyecto Especial Chira-Piura)
m SET OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO p
1 44.00 39.82 60.32 85.27 165.53 149.51 165.53 160.19 126.10 93.84 76.82 54.40 1.59
2 38.85 39.20 54.63 81.50 147.56 149.51 165.53 160.19 112.89 87.94 60.57 53.00 3.17
3 37.50 37.00 44.84 66.00 103.12 149.51 165.53 160.19 110.22 86.16 57.20 48.00 4.76
4 37.00 36.41 40.32 64.30 94.01 149.51 165.53 160.19 99.63 78.40 54.65 44.12 6.35
5 34.40 36.00 38.41 61.28 92.10 130.46 165.53 160.19 96.32 74.52 54.20 39.51 7.94
6 33.40 34.19 38.00 61.00 89.59 120.00 165.53 154.44 93.99 72.24 54.03 38.43 9.52
7 33.18 32.30 36.41 60.00 83.00 115.26 165.53 152.27 90.40 68.43 53.00 37.20 11.11
8 33.00 32.19 33.90 58.66 83.00 114.83 165.53 126.31 88.86 66.00 50.81 37.07 12.70
9 31.70 32.00 33.00 55.68 80.65 101.48 165.53 116.60 87.50 64.20 50.54 34.90 14.29
10 31.28 31.20 31.53 50.79 78.00 101.20 139.99 109.60 87.40 62.78 50.40 34.50 15.87
11 30.30 31.20 30.03 50.33 73.10 95.98 133.30 109.00 87.20 62.63 50.00 34.00 17.46
12 29.55 29.58 29.72 48.73 69.15 94.62 129.42 105.00 81.95 61.70 49.87 34.00 19.05
13 29.20 29.50 29.72 48.00 68.00 93.10 124.00 103.06 81.00 61.20 49.30 33.00 20.63
14 28.00 29.49 29.30 43.46 66.95 92.30 124.00 100.49 81.00 59.72 48.10 33.00 22.22
15 26.00 29.02 29.00 43.00 64.00 88.34 110.50 96.00 78.30 58.00 47.00 32.62 23.81
16 25.01 28.01 28.10 42.16 61.19 88.19 107.40 94.00 78.00 57.08 47.00 32.42 25.40
17 25.00 28.00 27.90 41.38 61.00 87.86 101.50 94.00 77.20 56.14 46.50 31.90 26.98
18 25.00 27.50 27.72 40.32 60.55 86.41 101.00 90.00 74.40 54.00 45.63 31.21 28.57
19 24.32 27.00 26.64 40.00 59.40 83.00 99.56 90.00 70.36 52.00 43.90 30.09 30.16
20 23.59 26.00 26.50 38.67 59.00 81.00 98.00 86.00 70.00 52.00 42.00 30.00 31.75
21 23.30 26.00 25.63 34.93 58.21 79.35 97.50 83.30 66.20 51.45 42.00 29.70 33.33
22 22.20 25.52 25.00 34.70 58.20 76.72 96.00 80.50 65.07 48.00 41.16 29.20 34.92
23 21.99 25.20 24.30 33.54 57.86 76.29 96.00 80.50 63.84 47.35 41.10 28.20 36.51
24 21.98 25.00 23.30 32.06 56.40 76.02 92.00 79.15 63.32 46.40 41.00 28.00 38.10
25 21.40 25.00 23.10 31.50 55.40 76.00 91.77 77.10 62.30 46.07 41.00 27.85 39.68
26 21.07 23.85 22.40 31.20 52.62 74.10 90.00 76.40 60.57 46.00 40.00 27.40 41.27
27 21.00 23.40 22.13 31.00 51.76 74.10 89.00 76.30 59.30 44.79 37.40 26.20 42.86
28 21.00 22.54 21.10 30.50 51.00 73.38 82.04 76.10 59.20 43.30 37.00 26.00 44.44
29 20.92 22.35 21.10 30.26 50.40 72.78 78.42 76.01 57.83 43.00 36.24 26.00 46.03
30 20.85 22.00 19.30 28.91 50.10 71.10 78.00 74.00 57.00 42.30 36.10 25.81 47.62
31 20.10 21.44 19.28 28.61 49.84 69.00 77.50 73.10 56.02 42.10 36.00 25.50 49.21
32 20.00 21.32 19.00 28.26 48.90 68.36 75.34 73.00 56.00 41.53 35.40 25.50 50.79
33 19.92 21.20 18.00 28.00 46.00 66.50 75.32 71.30 55.60 41.00 34.50 25.40 52.38
34 19.10 21.20 18.00 25.00 45.96 65.65 75.10 71.00 53.80 40.10 34.40 24.81 53.97
35 19.00 21.07 18.00 24.20 44.00 62.00 75.10 70.26 52.40 40.00 34.28 24.59 55.56
36 18.40 21.00 17.50 24.00 39.99 61.00 74.00 69.00 51.00 38.12 34.07 24.50 57.14
37 18.00 19.80 17.20 24.00 39.10 59.40 73.20 68.04 50.33 37.71 34.00 24.40 58.73
38 18.00 19.20 17.19 24.00 38.30 55.81 70.91 67.00 50.00 37.00 33.50 23.93 60.32
54
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
m SET OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO p
39 17.55 19.20 17.00 22.29 38.00 53.59 70.00 67.00 49.50 37.00 33.00 23.93 61.90
40 17.50 19.00 16.00 22.00 37.00 52.10 67.34 63.30 48.10 34.10 32.00 23.89 63.49
41 17.44 18.90 15.30 21.00 36.66 51.20 67.00 63.30 48.00 33.76 31.98 23.40 65.08
42 17.20 18.20 15.02 19.30 36.50 51.00 66.00 61.96 46.57 33.30 31.96 23.20 66.67
43 17.10 18.00 14.73 17.10 36.00 50.50 65.48 60.40 46.43 33.00 31.40 23.00 68.25
44 17.10 17.88 13.00 17.00 35.71 50.00 65.20 55.00 44.20 32.20 31.37 23.00 69.84
45 17.00 17.49 13.00 16.40 34.64 49.10 63.68 54.42 41.20 32.00 30.40 22.53 71.43
46 16.76 17.40 13.00 15.27 34.10 47.10 62.40 54.00 40.20 31.30 29.47 21.00 73.02
47 16.00 17.00 13.00 13.30 31.20 46.34 61.10 53.64 38.00 30.00 29.40 20.32 74.60
48 15.83 16.74 12.50 13.00 31.00 42.70 61.00 53.00 36.72 29.30 29.00 20.30 76.19
49 15.00 16.40 11.00 12.00 29.00 41.50 58.40 52.57 36.50 29.26 29.00 18.18 77.78
50 14.59 16.40 10.39 9.30 28.40 39.11 54.20 52.20 34.50 26.00 28.47 18.00 79.37
51 14.43 16.00 10.10 8.00 28.20 38.40 53.00 50.20 34.40 25.00 27.55 17.90 80.95
52 14.40 16.00 10.00 8.00 28.00 37.40 47.20 49.00 34.15 24.36 27.30 17.40 82.54
53 14.00 15.00 9.40 7.30 25.35 35.72 46.00 49.00 33.37 23.31 26.20 17.20 84.13
54 13.20 14.33 9.30 7.10 24.00 33.00 43.00 47.36 33.00 22.65 26.00 17.00 85.71
55 13.00 14.30 9.00 6.99 23.00 29.10 32.00 46.67 32.50 22.56 26.00 17.00 87.30
56 12.87 12.00 9.00 6.20 22.20 29.05 30.40 44.50 32.40 21.30 25.06 14.66 88.89
57 12.80 12.00 7.20 6.00 21.00 28.10 29.20 35.00 32.00 21.00 24.00 14.12 90.48
58 11.50 11.00 5.20 5.00 20.00 28.09 23.40 25.35 30.30 17.00 23.70 14.00 92.06
59 10.25 9.88 4.00 3.40 19.30 26.00 21.50 25.00 21.56 16.50 23.64 13.00 93.65
60 8.50 9.10 3.00 3.00 17.00 17.89 21.00 13.20 21.50 16.00 23.30 12.53 95.24
61 8.30 9.00 2.40 2.00 17.00 14.97 6.00 11.00 20.50 15.00 20.40 10.00 96.83
62 7.50 4.10 2.20 0.09 9.00 5.40 5.36 9.81 9.00 14.00 20.00 8.10 98.41
Prome 21.42 22.55 21.17 30.10 51.86 69.79 86.54 78.49 58.99 43.95 38.09 26.61 549.56
P(50%) 20.05 21.29 18.93 28.17 48.67 68.20 74.80 72.98 56.00 41.39 35.25 25.50 511.22
P(75%) 15.96 16.94 12.88 13.23 31.15 45.43 61.08 53.48 37.68 29.83 29.30 20.32 367.25
P(90%) 12.82 12.00 7.74 6.06 21.36 28.38 29.56 37.85 32.12 21.09 24.32 14.28 247.58
P(95%) 8.76 9.22 3.15 3.06 17.35 19.11 21.08 14.97 21.51 16.08 23.35 12.60 170.22
Fuente: DCERH-ANA
55
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
100.00
90.00
80.00
70.00
60.00
HM3
50.00
40.00
30.00
20.00
10.00
0.00
SET OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO
MESES
Figura N°74. Variación mensual de volúmenes de las descargas medias – Río Quiroz
Fuente: Elaboración propia
1935 17.25 26.22 40.07 70.68 14.81 14.10 5.54 4.60 6.00 4.60 3.60 5.40 212.88
1936 12.60 24.24 32.40 29.00 20.40 9.10 7.00 0.00 4.40 5.40 4.40 10.20 159.14
1937 7.80 5.60 7.80 10.60 2.10 3.70 9.40 3.70 2.10 0.50 0.00 6.20 59.50
1938 5.40 14.30 58.90 50.80 10.20 16.80 17.90 2.10 3.60 0.50 0.00 2.10 182.60
1939 28.40 63.90 225.80 166.70 30.00 22.00 5.40 2.10 0.00 0.00 1.30 9.40 555.00
1940 20.40 31.48 22.00 95.60 30.00 7.50 3.70 0.00 3.60 2.10 1.30 12.60 230.28
1941 31.60 76.90 129.90 124.90 52.50 20.50 5.40 0.50 2.10 5.40 3.60 9.40 462.70
1942 9.40 31.00 30.00 24.40 43.70 7.50 0.50 3.70 1.30 0.50 0.00 0.50 152.51
1943 10.20 22.00 31.60 60.10 16.30 5.20 2.10 0.00 2.10 3.50 5.20 5.40 163.70
1944 26.00 31.96 52.50 43.00 42.90 0.00 0.50 9.40 5.20 0.50 0.00 12.60 224.56
1945 28.40 25.60 26.00 50.80 7.80 3.60 7.80 5.40 9.10 0.50 0.00 0.50 165.50
1946 11.80 44.50 62.90 44.60 22.00 28.30 6.20 0.50 5.20 3.70 1.30 5.40 236.40
1947 6.20 12.80 10.20 9.10 9.40 2.10 2.10 0.00 0.00 2.10 7.50 11.80 73.30
1948 20.40 17.67 34.80 57.80 22.00 14.50 3.70 3.70 1.30 0.50 1.30 0.50 178.17
1949 0.50 16.90 58.90 50.80 11.80 18.10 10.20 16.60 2.10 2.10 0.00 0.50 188.50
1950 2.10 22.00 59.70 33.70 19.60 33.70 52.50 5.40 7.50 7.80 5.20 20.40 269.60
1951 11.80 44.50 62.90 44.60 22.00 28.30 6.20 3.70 5.20 3.70 1.30 5.40 239.60
1952 0.50 16.22 58.90 50.80 11.80 23.30 10.20 3.70 1.30 0.50 0.00 0.00 177.22
1953 7.80 44.50 77.10 116.40 42.90 31.40 15.80 2.10 1.30 3.70 10.60 9.40 363.00
1954 5.40 14.30 26.80 22.00 9.40 3.60 0.50 1.10 0.00 7.80 3.60 9.40 103.90
1955 2.10 3.40 34.80 34.70 16.90 8.60 2.10 1.30 1.30 1.10 1.30 1.30 108.90
56
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC Total
1956 5.60 1.28 58.40 16.60 9.10 5.70 3.50 3.70 1.30 4.60 1.80 1.90 113.48
1957 2.40 14.50 68.30 69.50 27.10 11.10 5.60 2.70 3.40 1.60 3.40 3.70 213.30
1958 14.50 24.40 42.60 37.30 21.20 14.30 7.20 4.30 2.60 2.40 2.60 1.90 175.30
1959 1.30 10.20 23.80 30.80 22.00 10.60 5.90 0.80 3.40 3.50 2.90 5.10 120.30
1960 11.20 17.19 22.00 19.20 10.40 3.10 1.10 0.80 0.50 0.80 2.60 0.50 89.39
1961 5.60 10.20 14.70 15.30 7.80 5.20 1.10 0.50 1.00 0.80 1.00 1.10 64.30
1962 5.60 16.20 18.70 10.40 5.40 1.80 0.50 0.00 0.50 0.50 1.00 0.80 61.40
1963 1.90 2.70 18.70 14.80 3.20 0.30 0.00 0.50 0.00 0.00 0.00 0.00 42.10
1964 3.50 10.62 3.70 11.10 4.80 1.60 0.50 1.60 0.30 0.00 0.00 0.00 37.72
1965 1.60 5.60 32.40 55.00 21.70 3.60 2.10 0.30 1.00 1.10 0.80 1.10 126.30
1966 4.80 9.20 15.00 9.10 4.00 0.80 0.80 0.50 0.30 1.60 0.30 0.30 46.70
1967 3.50 12.60 11.00 4.40 1.60 0.80 1.10 0.00 0.00 1.30 0.00 0.00 36.30
1968 0.80 0.77 1.90 1.80 1.10 0.00 0.30 0.30 0.00 0.30 0.00 0.00 7.27
1969 1.30 1.90 11.00 13.50 7.50 2.90 0.50 0.00 0.30 0.30 0.80 0.80 40.80
1970 5.10 5.60 8.30 8.00 8.80 3.10 0.50 0.30 0.30 1.90 0.50 0.80 43.20
1971 3.50 6.80 25.40 24.10 5.60 3.90 0.80 3.50 0.50 0.50 1.00 1.90 77.50
1972 4.00 12.84 56.80 14.00 7.80 4.70 3.50 2.90 1.30 1.60 1.30 3.70 114.44
1973 8.30 45.50 32.90 31.10 12.30 7.00 5.10 0.80 2.90 2.40 2.30 2.90 153.50
1974 5.90 13.50 12.30 4.70 5.90 1.30 1.10 1.90 0.80 0.80 0.30 1.10 49.60
1975 2.70 10.40 30.50 23.80 11.50 6.50 3.50 1.90 1.80 2.70 1.80 1.10 98.20
1976 8.00 19.31 33.20 29.00 18.50 8.80 3.50 1.90 1.60 1.10 1.60 2.40 128.91
1977 8.80 22.00 27.10 23.60 13.90 8.30 2.90 0.30 1.80 1.60 1.00 1.10 112.40
1978 1.10 3.60 7.80 10.10 5.10 1.60 0.50 0.30 0.30 0.30 0.30 0.30 31.30
1979 1.60 4.10 23.30 8.30 4.00 1.60 0.30 0.00 0.30 0.30 0.30 0.30 44.40
1980 0.30 0.77 3.50 7.00 1.90 0.30 0.30 0.30 0.00 0.00 0.00 0.00 14.37
1981 0.00 4.10 27.30 12.20 2.70 0.30 0.30 0.00 0.30 0.30 0.00 0.00 47.50
1982 0.00 1.70 1.10 4.10 1.10 0.50 0.30 7.80 0.00 0.00 0.50 7.50 24.60
1983 61.90 90.00 170.10 242.10 177.60 105.80 27.10 4.30 4.90 4.30 4.10 4.00 896.20
1984 4.60 29.06 45.80 24.90 14.20 7.30 5.40 2.50 1.30 1.50 2.10 2.10 140.76
1985 2.40 2.80 9.00 4.30 1.30 1.50 2.70 0.10 0.80 0.30 0.10 0.20 25.50
1986 4.50 13.50 8.50 8.40 3.10 1.10 0.20 0.20 0.00 0.00 0.10 0.30 39.90
1987 9.60 15.00 20.90 7.40 4.70 0.90 0.20 0.10 0.10 0.10 0.10 0.10 59.20
1988 1.60 0.19 4.60 5.00 1.60 0.40 0.10 0.00 0.00 0.00 0.00 0.00 13.49
1989 13.90 18.70 17.70 32.90 10.60 2.80 1.10 1.50 0.00 1.00 0.10 0.10 100.40
1990 1.80 2.10 2.40 12.90 7.90 3.80 2.50 0.05 0.10 0.13 0.08 1.87 35.64
1991 0.00 9.70 38.01 10.81 4.47 6.40 5.04 5.81 2.77 4.47 2.05 4.71 94.25
1992 3.86 6.89 45.53 44.12 24.45 40.41 5.46 0.96 1.63 0.21 0.03 0.43 173.99
1993 9.05 18.87 64.82 62.42 36.91 4.72 10.79 1.18 0.13 1.79 0.78 1.26 212.71
1994 9.70 9.92 35.73 35.54 26.81 18.48 39.88 0.99 4.10 1.39 0.44 0.56 183.54
1995 0.62 2.47 10.55 5.42 2.22 0.78 1.37 5.20 1.43 0.19 0.16 0.11 30.49
1996 7.66 13.89 10.10 11.90 3.96 0.26 0.03 2.92 4.28 3.86 0.23 4.42 63.50
1997 0.00 1.55 2.52 5.26 5.22 0.67 0.19 0.94 0.03 0.16 0.34 4.66 21.53
1998 6.72 48.70 47.76 111.09 32.17 34.68 14.97 0.24 5.81 1.15 5.88 13.95 323.13
57
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC Total
1999 5.44 21.72 65.78 128.30 72.72 65.68 49.55 1.23 0.67 0.05 0.49 5.54 417.19
2000 3.13 15.87 19.15 72.34 48.32 93.36 52.55 2.89 1.52 0.40 0.05 1.87 311.46
2001 12.54 12.79 90.32 35.50 8.15 4.51 3.97 1.24 0.19 1.45 3.62 3.62 177.90
2002 8.20 39.44 95.90 55.70 10.88 7.36 1.97 0.70 0.47 3.56 7.03 13.98 245.19
2003 11.80 7.87 18.29 15.64 3.32 0.83 1.04 0.02 0.00 0.00 0.00 1.91 60.72
2004 0.00 3.35 0.86 7.12 0.33 0.36 0.27 0.09 0.00 0.00 0.00 0.00 12.38
2005 0.07 0.02 7.75 3.80 1.13 0.11 0.00 0.00 0.00 0.00 0.00 0.00 12.88
2006 0.87 12.88 44.44 31.73 3.86 6.32 9.11 8.76 11.47 9.43 15.03 1.66 155.56
2007 54.18 29.01 78.46 89.09 50.99 56.32 17.06 9.58 5.00 12.22 47.28 17.08 466.27
2008 0.91 54.48 64.35 66.52 15.04 10.84 5.62 2.57 0.47 0.01 0.00 0.00 220.82
2009 25.14 74.62 45.04 18.54 15.76 6.60 1.40 0.96 0.49 1.69 0.67 0.67 191.58
2010 8.00 40.84 50.04 36.91 18.37 9.06 2.24 0.89 0.57 0.41 0.81 0.78 168.91
2011 2.95 4.84 0.60 11.87 2.91 2.88 2.78 0.73 0.27 0.26 0.13 0.22 30.44
2012 7.72 106.73 55.42 54.89 21.83 13.34 10.34 4.79 3.01 6.13 5.68 5.26 295.17
2013 4.98 5.88 9.25 4.01 5.79 4.24 3.11 2.46 0.49 1.43 0.39 0.43 42.47
2014 1.97 1.49 7.34 5.33 10.82 3.76 8.25 0.39 0.33 0.40 0.26 0.27 40.60
2015 3.39 62.95 38.61 5.70 0.76 0.86 0.55 0.18 0.16 0.27 0.09 0.12 113.64
2016 0.32 3.23 12.78 3.08 2.87 1.53 1.86 0.32 0.34 0.32 0.32 6.76 33.72
2017 11.21 40.65 194.83 87.61 24.80 21.18 14.00 6.56 2.62 2.79 9.28 21.29 436.82
Prom 8.52 19.11 37.87 37.98 17.23 11.92 6.49 2.17 1.87 1.84 2.29 3.56 150.77
Fuente:DCPRH y AAA Jequetepeque Zarumila (Propiedad Proyecto Especial Chira-Piura)
m SET OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO p
1 11.47 12.22 47.28 20.40 61.90 106.73 225.80 242.10 177.60 105.80 52.55 16.60 1.22
2 9.10 9.43 15.03 17.08 54.18 90.00 170.10 166.70 72.72 93.36 52.50 9.58 2.44
3 7.50 7.80 10.60 13.98 31.60 76.90 129.90 128.30 52.50 65.68 49.55 9.40 3.66
4 6.00 7.80 7.50 13.95 28.40 74.62 95.90 124.90 50.99 56.32 39.88 8.76 4.88
5 5.81 6.13 7.03 12.60 28.40 63.90 90.32 116.40 48.32 40.41 27.10 7.80 6.10
6 5.20 5.40 5.88 12.60 26.00 62.95 78.46 111.09 43.70 34.68 17.90 5.81 7.32
7 5.20 5.40 5.68 11.80 25.14 54.48 77.10 95.60 42.90 33.70 17.06 5.40 8.54
8 5.20 4.60 5.20 10.20 20.40 48.70 68.30 89.09 42.90 31.40 15.80 5.40 9.76
9 5.00 4.60 5.20 9.40 20.40 45.50 65.78 72.34 36.91 28.30 14.97 5.20 10.98
10 4.90 4.47 4.40 9.40 14.50 44.50 64.82 69.50 32.17 28.30 10.79 4.79 12.20
11 4.40 4.30 4.10 9.40 13.90 44.50 64.35 66.52 30.00 23.30 10.34 4.30 13.41
12 4.28 3.86 3.62 9.40 12.60 44.50 62.90 62.42 30.00 22.00 10.20 4.30 14.63
13 4.10 3.70 3.60 7.50 12.54 40.84 62.90 60.10 27.10 20.50 10.20 3.70 15.85
14 3.60 3.70 3.60 6.20 11.80 39.44 59.70 57.80 26.81 18.48 9.40 3.70 17.07
15 3.60 3.70 3.60 5.54 11.80 31.96 58.90 55.70 24.45 18.10 9.11 3.70 18.29
16 3.40 3.56 3.40 5.40 11.80 31.48 58.90 55.00 22.00 16.80 8.25 3.70 19.51
58
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
m SET OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO p
17 3.40 3.50 2.90 5.40 11.20 31.00 58.90 54.89 22.00 14.50 7.80 3.70 20.73
18 3.01 3.50 2.60 5.40 10.20 29.06 58.40 50.80 22.00 14.30 7.20 3.70 21.95
19 2.90 2.70 2.60 5.40 9.70 29.01 56.80 50.80 22.00 13.34 7.00 3.50 23.17
20 2.77 2.40 2.30 5.26 9.60 25.60 55.42 50.80 21.83 11.10 6.20 2.92 24.39
21 2.60 2.40 2.10 5.10 9.40 24.40 52.50 50.80 21.70 10.84 6.20 2.90 25.61
22 2.10 2.10 2.05 4.71 9.05 24.24 50.04 44.60 21.20 10.60 5.90 2.89 26.83
23 2.10 2.10 1.80 4.66 8.80 22.00 47.76 44.60 20.40 9.10 5.62 2.70 28.05
24 2.10 2.10 1.80 4.42 8.30 22.00 45.80 44.12 19.60 9.06 5.60 2.57 29.27
25 2.10 1.90 1.60 4.00 8.20 22.00 45.53 43.00 18.50 8.80 5.46 2.50 30.49
26 1.80 1.79 1.30 3.70 8.00 21.72 45.04 37.30 18.37 8.60 5.40 2.46 31.71
27 1.80 1.69 1.30 3.70 8.00 19.31 44.44 36.91 16.90 8.30 5.40 2.10 32.93
28 1.63 1.60 1.30 3.62 7.80 18.87 42.60 35.54 16.30 7.50 5.40 2.10 34.15
29 1.60 1.60 1.30 2.90 7.80 18.70 38.61 35.50 15.76 7.50 5.10 2.10 35.37
30 1.52 1.60 1.30 2.40 7.72 17.67 38.01 34.70 15.04 7.36 5.04 1.90 36.59
31 1.43 1.60 1.30 2.10 7.66 17.19 35.73 33.70 14.20 7.30 3.97 1.90 37.80
32 1.30 1.50 1.30 2.10 6.72 16.90 34.80 32.90 13.90 7.00 3.70 1.90 39.02
33 1.30 1.45 1.00 1.91 6.20 16.22 34.80 31.73 12.30 6.60 3.70 1.60 40.24
34 1.30 1.43 1.00 1.90 5.90 16.20 33.20 31.10 11.80 6.50 3.50 1.50 41.46
35 1.30 1.39 1.00 1.90 5.60 15.87 32.90 30.80 11.80 6.40 3.50 1.30 42.68
36 1.30 1.30 1.00 1.90 5.60 15.00 32.40 29.00 11.50 6.32 3.50 1.24 43.90
37 1.30 1.15 0.81 1.87 5.60 14.50 32.40 29.00 10.88 5.70 3.50 1.23 45.12
38 1.30 1.10 0.80 1.87 5.44 14.30 31.60 24.90 10.82 5.20 3.11 1.18 46.34
39 1.30 1.10 0.80 1.66 5.40 14.30 30.50 24.40 10.60 5.20 2.90 1.10 47.56
40 1.00 1.10 0.78 1.30 5.40 13.89 30.00 24.10 10.40 4.72 2.78 0.99 48.78
41 1.00 1.00 0.67 1.26 5.10 13.50 27.30 23.80 10.20 4.70 2.70 0.96 50.00
42 0.80 0.80 0.50 1.10 4.98 13.50 27.10 23.60 9.40 4.51 2.50 0.96 51.22
43 0.80 0.80 0.50 1.10 4.80 12.88 26.80 22.00 9.40 4.24 2.24 0.94 52.44
44 0.67 0.80 0.49 1.10 4.60 12.84 26.00 19.20 9.10 3.90 2.10 0.89 53.66
45 0.57 0.50 0.44 1.10 4.50 12.80 25.40 18.54 8.80 3.80 2.10 0.80 54.88
46 0.50 0.50 0.39 1.10 4.00 12.79 23.80 16.60 8.15 3.76 2.10 0.80 56.10
47 0.50 0.50 0.34 0.80 3.86 12.60 23.30 15.64 7.90 3.70 2.10 0.80 57.32
48 0.50 0.50 0.30 0.80 3.50 10.62 22.00 15.30 7.80 3.60 1.97 0.73 58.54
49 0.49 0.50 0.30 0.80 3.50 10.40 22.00 14.80 7.80 3.60 1.86 0.70 59.76
50 0.49 0.50 0.30 0.78 3.50 10.20 20.90 14.00 7.80 3.60 1.40 0.50 60.98
51 0.47 0.50 0.30 0.67 3.39 10.20 19.15 13.50 7.50 3.10 1.37 0.50 62.20
52 0.47 0.50 0.26 0.56 3.13 9.92 18.70 12.90 5.90 3.10 1.10 0.50 63.41
53 0.33 0.50 0.23 0.50 2.95 9.70 18.70 12.20 5.79 2.90 1.10 0.50 64.63
54 0.30 0.41 0.16 0.50 2.70 9.20 18.29 11.90 5.60 2.88 1.10 0.50 65.85
55 0.30 0.40 0.13 0.50 2.40 7.87 17.70 11.87 5.40 2.80 1.10 0.39 67.07
56 0.30 0.40 0.10 0.50 2.40 6.89 15.00 11.10 5.22 2.10 1.10 0.32 68.29
57 0.30 0.30 0.10 0.50 2.10 6.80 14.70 10.81 5.10 1.80 1.04 0.30 69.51
58 0.30 0.30 0.10 0.43 2.10 5.88 12.78 10.60 4.80 1.60 0.80 0.30 70.73
59 0.30 0.30 0.10 0.43 1.97 5.60 12.30 10.40 4.70 1.60 0.80 0.30 71.95
59
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
m SET OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO p
60 0.30 0.30 0.09 0.30 1.90 5.60 11.00 10.10 4.47 1.60 0.55 0.30 73.17
61 0.27 0.30 0.08 0.30 1.80 5.60 11.00 9.10 4.00 1.53 0.50 0.30 74.39
62 0.19 0.30 0.05 0.30 1.60 4.84 10.55 9.10 4.00 1.50 0.50 0.30 75.61
63 0.16 0.27 0.03 0.30 1.60 4.10 10.20 8.40 3.96 1.30 0.50 0.24 76.83
64 0.13 0.26 0.00 0.27 1.60 4.10 10.10 8.30 3.86 1.10 0.50 0.20 78.05
65 0.10 0.21 0.00 0.22 1.30 3.60 9.25 8.00 3.32 0.90 0.50 0.18 79.27
66 0.10 0.19 0.00 0.20 1.30 3.40 9.00 7.40 3.20 0.86 0.50 0.10 80.49
67 0.03 0.16 0.00 0.12 1.10 3.35 8.50 7.12 3.10 0.83 0.50 0.10 81.71
68 0.00 0.13 0.00 0.11 0.91 3.23 8.30 7.00 2.91 0.80 0.50 0.09 82.93
69 0.00 0.10 0.00 0.10 0.87 2.80 7.80 5.70 2.87 0.80 0.30 0.05 84.15
70 0.00 0.05 0.00 0.10 0.80 2.70 7.80 5.42 2.70 0.78 0.30 0.02 85.37
71 0.00 0.01 0.00 0.00 0.62 2.47 7.75 5.33 2.22 0.67 0.30 0.00 86.59
72 0.00 0.00 0.00 0.00 0.50 2.10 7.34 5.26 2.10 0.50 0.30 0.00 87.80
73 0.00 0.00 0.00 0.00 0.50 1.90 4.60 5.00 1.90 0.40 0.30 0.00 89.02
74 0.00 0.00 0.00 0.00 0.32 1.70 3.70 4.70 1.60 0.36 0.27 0.00 90.24
75 0.00 0.00 0.00 0.00 0.30 1.55 3.50 4.40 1.60 0.30 0.20 0.00 91.46
76 0.00 0.00 0.00 0.00 0.07 1.49 2.52 4.30 1.30 0.30 0.20 0.00 92.68
77 0.00 0.00 0.00 0.00 0.00 1.28 2.40 4.10 1.13 0.30 0.19 0.00 93.90
78 0.00 0.00 0.00 0.00 0.00 0.77 1.90 4.01 1.10 0.26 0.10 0.00 95.12
79 0.00 0.00 0.00 0.00 0.00 0.77 1.10 3.80 1.10 0.11 0.03 0.00 96.34
80 0.00 0.00 0.00 0.00 0.00 0.19 0.86 3.08 0.76 0.00 0.00 0.00 97.56
81 0.00 0.00 0.00 0.00 0.00 0.02 0.60 1.80 0.33 0.00 0.00 0.00 98.78
Prome 1.00 1.00 0.67 1.26 5.10 13.50 27.30 23.80 10.20 4.70 2.70 0.96 92.19
P(50%) 1.00 1.00 0.67 1.26 5.10 13.50 27.30 23.80 10.20 4.70 2.70 0.96 92.19
P(75%) 0.23 0.25 0.08 0.30 1.65 5.55 10.85 8.96 3.94 1.38 0.47 0.29 33.95
P(90%) 0.00 0.00 0.00 0.00 0.36 1.74 3.88 4.76 1.66 0.37 0.28 0.00 13.04
P(95%) 0.00 0.00 0.00 0.00 0.00 0.82 1.95 4.02 1.10 0.26 0.11 0.00 8.27
Fuente: DCERH-ANA
30.00
25.00
20.00
HM3
15.00
10.00
5.00
0.00
SET OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO
MESES
Figura N°75. Variación mensual de volúmenes de las descargas medias – Río Chipillico
Fuente: Elaboración propia
60
CONSEJO DE RECURSOS HIDRICOS DE CUENCA CHIRA PIURA
GRUPO DE TRABAJO
PLAN DE APROVECHAMIENTO DE DISPONIBILIDADES HIDRICAS - PADH
11.0 Conclusiones y Recomendaciones
11.1 Conclusiones
DESCRIPCION AGO SET OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL TOTAL
Percentil 60 75.42 68.62 51.68 56.82 81.51 161.38 334.01 553.88 410.68 264.63 162.51 101.47 2322.60
ESC AGO SET OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL TOTAL
14 1.03 0.66 0.50 0.46 0.45 1.29 4.45 66.82 37.58 55.42 19.73 6.74 195.14
ESC AGO SET OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL TOTAL
12 22.78 17.80 14.87 11.43 10.60 18.98 28.81 149.50 134.39 80.39 53.06 35.97 578.60
ESC AGO SET OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL TOTAL
P(75%) 0.23 0.25 0.08 0.30 1.65 5.55 10.85 8.96 3.94 1.38 0.47 0.29 33.95
Río AGO SET OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL TOTAL
Charanal 0.57 0.31 0.18 0.17 0.22 0.89 11.12 25.63 13.55 6.45 3.95 1.95 64.99
Yapatera 0.7 0.6 1.11 1.32 1.98 4.06 9.47 12.4 7.38 3.43 1.94 1.22 45.61
Corral del
1.8 1.23 1.21 1.28 1.43 2.92 16.63 37.21 21.78 10.11 6.09 4.35 106.04
Medio
La Gallega 0.41 0.22 0.15 0.22 0.5 2.95 8.86 12.84 9.9 5.09 2.24 1.04 44.42
Bigote 2.46 1.67 1.41 1.61 2.34 4.71 40.1 56.06 31.7 16.82 9.29 6.1 174.27
Total 5.94 4.03 4.06 4.6 6.47 15.53 86.18 144.14 84.31 41.9 23.51 14.66 435.33
11.2 Recomendaciones
Enviar la propuesta de oferta de agua a la AAA JZ para su aprobación.