Professional Documents
Culture Documents
Elementos UTI
Precio Base Personal GG
de Desgaste 10%
4.00%
S/. 410.00 S/. 64.40 S/. 31.14 S/. 41.00
S/. 16.40
Horas / mes
30
S/. 4.00 4
26
INGRESOS OJO
BASE S/. 410.00 HM
HRS DE TRABAJO
UTI S/. 41.00 HM EFECTIVAS EN OBRAPERIODO MES TURNOS
ELEM DE DESG. 60% S/. 9.84 HM 6.50 Hrs/Turno 1.00 meses 26.00 dias 1
### 164.59 USD $/HM
GASTOS
PERSONAL S/. 64.40 HM
GG S/. 31.14 HM
ELEM DE DESG. 40.0% S/. 6.56 HM
S/. 102.11 36.47 USD $/HM
NOTAS IMPORTANTES
1.- AL MOMENTO DE LA MOVILIZACION ENVIAR EN PERFECTO ESTADO ELQUIPO
2.- NO OLVIDARCE DE REVISAR LA PRESENTE COTIZACION ANTES DE TOMAR DESICIONES
3.- AL MOMENTO DE LA MOVILIZACION ENVIAR STOK DE REPUESTOS
4.- OBRA EN ZONA DE DIFICIL ACCESO
5.- HACER 3 TURNOS DE SER POSIBLE
6.- ENVIAR LA CASETA DE TACNA, PARA USAR DE OFICINA A PIE DE PLANTA
INGRESO INV. PLANTA % REC. % REC.
FIJO USD $ USD $ (SIN IGV) MES AÑO
27,814.99 620,000.00 4.486% 53.835%