COSTO DE ALQUILER DE CALDERA DE ASFALTO

Elementos UTI
Precio Base Personal GG
de Desgaste 10%
4.00%
S/. 410.00 S/. 64.40 S/. 31.14 S/. 41.00
S/. 16.40

PERSONAL CANT. SALARIO (Mes) PARCIAL


Supervisor 0.13 S/. 5,000.00 S/. 650.00
Conductor 1 S/. 3,500.00 S/. 3,500.00
Op. Planta 1 S/. 4,500.00 S/. 4,500.00
Cajeros 2 S/. 3,500.00 S/. 7,000.00
4.13 ### Mes
S/. 64.40 Hora
Horarios de
trabajo Estandar Dias Brutos Eficiencia Dias Efect. Por mes Horas Efect. Por Mes
Mañana 7 am 12 pm 5 30 90.00% 27 dias
Refrigerio 12 pm 13 pm 1 Horas Brutas Eficiencia Hora Efec. Por dia 243
Tarde 13 pm 16 pm 3 10 90.00% 9 horas
7 270 Horas/Mes
ELEMENTOS DE DESGASTE
POR HORA S/. 16.40
POR DIA DE 8 HRS S/. 131.20
POR MES S/. 3,936.00
POR MES USD $ 1405.71
ST (USD$ / HM) ST (USD$ / HM) Hrs.MES ST (S/. / MES) ST (USD$ / MES) ST (USD$ / AÑO)

S/. 562.95 USD $ 201.05 243 S/. 136,796.43 48,855.87 586,270.39

DESCRIPCION CANT. P.Unit. (Mes) PARCIAL


Alimentos 4.13 S/. 0.00 S/. 0.00
Hospedaje 4.13 S/. 0.00 S/. 0.00
Pasajes 4.13 S/. 300.00 S/. 1,239.00
EPPS 4.13 S/. 300.00 S/. 1,239.00
Veaticos 4.13 S/. 450.00 S/. 1,858.50
Seguros (5% mes HH) 4.13 S/. 782.50 S/. 3,231.73
S/. 7,568.23 Mes
Horas Efect. Por Mes S/. 31.14 Hora

Horas / mes

30
S/. 4.00 4
26
INGRESOS OJO
BASE S/. 410.00 HM
HRS DE TRABAJO
UTI S/. 41.00 HM EFECTIVAS EN OBRAPERIODO MES TURNOS
ELEM DE DESG. 60% S/. 9.84 HM 6.50 Hrs/Turno 1.00 meses 26.00 dias 1
### 164.59 USD $/HM
GASTOS
PERSONAL S/. 64.40 HM
GG S/. 31.14 HM
ELEM DE DESG. 40.0% S/. 6.56 HM
S/. 102.11 36.47 USD $/HM

NOTAS IMPORTANTES
1.- AL MOMENTO DE LA MOVILIZACION ENVIAR EN PERFECTO ESTADO ELQUIPO
2.- NO OLVIDARCE DE REVISAR LA PRESENTE COTIZACION ANTES DE TOMAR DESICIONES
3.- AL MOMENTO DE LA MOVILIZACION ENVIAR STOK DE REPUESTOS
4.- OBRA EN ZONA DE DIFICIL ACCESO
5.- HACER 3 TURNOS DE SER POSIBLE
6.- ENVIAR LA CASETA DE TACNA, PARA USAR DE OFICINA A PIE DE PLANTA
INGRESO INV. PLANTA % REC. % REC.
FIJO USD $ USD $ (SIN IGV) MES AÑO
27,814.99 620,000.00 4.486% 53.835%