You are on page 1of 12

Easy Cut Perforating

BHI Pressure Pumping Ecuador


© 2015 Baker Hughes Incorporated. All Rights Reserved.

© 2015 BAKER HUGHES I NCORPORATED. ALL RI GHTS RESERVED. TERM S AND CONDI TI ONS OF USE: BY ACCEPTI NG THI S DOCUM ENT, THE RECI PI ENT AGREES THAT THE DOCUM ENT TOGETHER W I TH ALL I NFORM ATI ON I NCLUDED THEREI N I S THE
CONFI DENTI AL AND PROPRI ETARY PROPERTY OF BAKER HUGHES I NCORPORATED AND I NCLUDES VALUABLE TRADE SECRETS AND/ OR PROPRI ETARY I NF OR M ATI ON OF BAKER HUGHES (COLLECTI VELY "I NFORM ATI ON"). BAKER HUGHES RETAI NS ALL RI GHTS
UNDER COPYRI GHT LAW S AND TRADE SECRET LAW S OF THE UNI TED STATES OF AM ERI CA AND OTHER COUNTRI ES. THE RECI PI ENT FURTHER AGREES TH AT THE DOCUM ENT M AY NOT BE DI STRI BUTED, TRANSM I TTED, COPI ED OR REPRODUCED I N W HOLE OR
1 I N PART BY ANY M EANS, ELECTRONI C, M ECHANI CAL, OR OTHERW I SE, W I THOUT THE EXPRESS PRI OR W RI TTEN CONSENT OF BAKER HUGHES, AND M A Y NOT BE USED DI RECTLY OR I NDI RECTLY I N ANY W AY DETRI M ENTAL TO BAKER HUGHES’ I NTEREST.
Easy Cut Perforating
■ La técnica del Easy Cut perforating, es un método de
punzonamiento abrasivo que consiste en la generación de
alta velocidad e impacto en la salida de los jets nozzles
especialmente diseñados, empleando gel lineal y arena
como fluido abrasivo los cuales son diseñados a una
concentración adecuada para la generación de las
perforaciones en tubulares y casing alcanzando una
penetración controlada.

■ Esta técnica de punzonamiento abrasivo es ampliamente


utilizado en Pozos de petrolero y gas para comunicar el pozo
con la formación, logrando perforaciones limpias libres de
residuos metálicos, evitando la compactación de la formación
© 2015 Baker Hughes Incorporated. All Rights Reserved.

y tortuosidades a lo largo del túnel generado , lo cuales


permiten una mejor recuperación de la producción y remoción
de daño.

2
© 2015 Baker Hughes Incorporated. All Rights Reserved.

3
BHI Pressure Pumping
PRUEBA DEL EASY CUT PERFORATING
Equipo empleado
■ Unidad de Bombeo
■ Línea de Alta Presión 2”
■ Batch Mixer
■ Brazo Hidráulico

Herramientas y Materiales
■ Casing 7”, 26 lbs/ft.
■ Encofrado de 50” de diámetro.
■ Lechada de Cemento 16 ppg.
© 2015 Baker Hughes Incorporated. All Rights Reserved.

■ Easy Cut Perforating 4”.


■ Arena Carbolite 20/40, 1.5 ppa.
■ Gel lineal de 30 ppg.

4
Easy Cut Perforating (ECP)
Especificaciones
Centralizer OD:6”

Mandrel OD: 2 7/8”

Centralizer OD:6”

Nozzle Housing OD: 4.75”


© 2015 Baker Hughes Incorporated. All Rights Reserved.

Sand Jet Nozzle 3/16”

Reverse Flow Nozzle

5
Descripción del Anillo de Cemento
TAIL TAIL BULK TEST BULK TEST
T.T.: T.T.: 2:50 Hrs @ 70 Bc 2:50 Hrs @ 70 Bc

TAIL TAIL BULK TEST BULK TEST


COMPRESSIVE STRENGTH COMPRESSIVE STRENGTH
24h 2100 PSI 24h 2100 PSI
© 2015 Baker Hughes Incorporated. All Rights Reserved.

6
Parámetros de Diseño (Simulación-CIRCA)
SUMMARY OF FLOW RESULTS

Produced Fluids
Pressure known at: Reel Injection
Production Mode: Not Perforated
Fluid Composition: Not Perforated

Circulated Fluids
Fluid Composition: GW-22 Gel in 2-3 pct KCl
Liquid: 3.83 bbl/min
Solids: 0.17 bbl/min
Circulation Point: 5.0 ft
Workstring HHP Required : 391.99 HP

COMPLETION:

Wellhead Pressure........................................... 406.5 psi


Hydrostatic pressure loss............. 5285.5 psi
Friction pressure loss................ 0.1 psi
Kinetic pressure loss................. 0.2 psi
Equivalent Circulation Density[ECD]... 8.84 lb/gal (US)

Bottom Hole Pressure........................................ 5692.4 psi

FROM CIRCULATION POINT TO WELLHEAD:


Liquid transit time............................. 0 min
Annular volume.................................. 0.5 bbl
Volume below circulation point.................. 754.2 bbl
Total liquid volume............................. 754.6 bbl

WORKSTRING:

Pressure at reel rotating joint............................. 4000.0 psi


Friction pressure loss on reel........ 3.5 psi
Hydrostatic pressure loss on reel..... 4.7 psi

Pressure inside WS at Gooseneck............................. 3991.8 psi


Hydrostatic pressure loss............. -6.6 psi
Friction pressure loss................ 1.3 psi
© 2015 Baker Hughes Incorporated. All Rights Reserved.

Equivalent Circulation Density[ECD]... 7.19 lb/gal (US)

BHA total pressure loss ..................... 3582.8 psi


BHA Hydrostatic loss ....... -0.5 psi
BHA Friction loss .......... 0.1 psi
Nozzle ..................... 3583.2 psi

Circulation Point pressure ................................. 413.9 psi

FROM REEL ROTATING JOINT TO CIRCULATION POINT:


Liquid transit time................................ 0 min
Displacement Volume................................ 0.1 bbl
Internal Volume.................................... 0.1 bbl
Internal liquid volume........................... 0.1 bbl

Length of Workstring on reel.......................... 16.0 ft

7
PRUEBA DE PUNZONAMIENTO

INICIO DEL PUNZONAMIENTO ABRASIVO @ 4 BPM, 4200 PSI

Diámetro: 50” 12 MINUTOS DE BOMBEO


© 2015 Baker Hughes Incorporated. All Rights Reserved.

8
RESULTADOS DE LA PRUEBA

17 Pulg
6 Pulg
© 2015 Baker Hughes Incorporated. All Rights Reserved.

3 Orificios
6 Pulg 5/8”-1” 120°

9
VENTAJAS DEL EASY CUT PERFORATING (ECP)
 Punzonamientos mas limpios, sin fragmentos/residuos/compactación. La arena y el
material de formación erosionado son circulados fuera del pozo.
 Minimiza la tortuosidad y la fricción cerca del pozo (Near Wellbore friction),
permitiendo fracturamientos hidráulicos con menor presión y menor riesgo de un
arenamiento prematuro.
 Incrementa el drenaje de fluidos hacia el Pozo por la geometría generada por el
punzonamiento abrasivo.
 No causa deformaciones en el revestimiento (Burst) y cemento.
 Punzonamiento focalizado sin generar micro-fracturas, evitando el contacto con la
zona de aporte de agua.
© 2015 Baker Hughes Incorporated. All Rights Reserved.

 El ECP posee ventajas de seguridad sobre la perforación convencional, debido a que


no se manipulan explosivos.

10
EXPERIENCIAS
TCP vs. ECP

TCP ECP
N° de Perforados 200 55
Perf.Efectivos 74 40
Eficiencia 37% 70%
Fricción Perf. 100 psi 95 psi
Fricción Near Wellbore 60 psi 0 psi
© 2015 Baker Hughes Incorporated. All Rights Reserved.

Documentación técnica
SPE 138798 Cementing, Perforating and fracturing using Coiled tubing: Rigless completion technique
Developed for a marginal Field in Perú.
SPE 127738 Improvements in Multistage Fracturing of Horizontal Wells Using a Newly Introduced single
trip Coiled Tubing Conveyed Annular perforating and Fracturing tool.
SPE 135015 Rigless Abrasive Perforating and Fracturing in horizontal Tight gas Wells.
SPE 130678 Coiled Tubing Fracturing: An Operational review of a 43-stage Barnett Shale Stimulation.
11 SPE 107050 Abrasive Perforating via Coiled Tubing Revisited.
GRACIAS
Departamento de Ingeniería CTU & Estimulación
© 2015 Baker Hughes Incorporated. All Rights Reserved.

12

You might also like