You are on page 1of 1



GEOTECHNICAL REPORT
FINAL DESIGN OF Z MORH TUNNEL SECTION
OF NH-1 IN THE STATE OF JAMMU & KASHMIR

And therefore, concluding that:


t

- The opening shoouldn’t be bigger than 0,05mm in any case.

- The permeabilityy values obtained in the area crossed by the tunnel


t are shown in
Figure 6.1.1.3.

Depth (m) Lugeon Value


ŽƌĞŚŽůĞEŽ͘ KůĚŚĂŝŶĂŐŐĞ EĞǁŚĂŝŶĂŐĞ
From To Maximum Minimum

,Ͳϭ ϬнϭϬϯ;WŽƌƚĂůt
tĞƐƚͿ ϱнϭϬϯ;WŽƌƚĂůtĞƐƚͿ 17.00 30.00 0.30 0.88

,ͲϭΖ Ͳ ϱнϭϯϴ;WŽƌƚĂůtĞƐƚͿ Ϯϰ Ϯϳ Ϯ͕Ϯϵ

,ͲϮ ϬнϱϬϬ ϱнϱϬϬ ϱϮ ϲϳ ϭϬ͕Ϭϴ ϲ͕ϳϵ

,Ͳϰ ϮнϰϱϬ ϳнϰϱϬ ϭϴϭ ϭϵϲ ϭ͕ϵ Ϭ͕ϲϭ

,Ͳϱ ϲнϮϰϳ ϭϭнϮϰϳ ϭϳϯ ϮϬϬ ϰ͕ϵϵ ϭ͕ϱ

,Ͳϲ ϲнϰϰϮ;WŽƌƚĂůĂƐƚͿ ϭϭнϰϰϮ;WŽƌƚĂůĂƐƚͿ ϰϵ ϳϬ ϵ͕Ϭϳ ϱ͕Ϭϴ

,ͲϲΖ Ͳ ϭϭнϱϮϲ;WŽƌƚĂůĂƐƚͿΎ ϭϳ ϯϬ ϴ͕ϴϭ ϭ͕Ϭϰ

,Ͳϳ ϬнϬϮϬ;ĐĐĞƐdƵ
ƵŶŶĞůͿ ϬнϬϯϵ;ĐĐĞƐdƵŶŶĞůͿΎ Ϯϵ ϰϳ ϭ͕ϭϵ ϲ͕ϲϳ

,Ͳϴ ϬнϮϬϬ;ĐĐĞƐdƵ
ƵŶŶĞůͿ ϬнϭϳϮ;ĐĐĞƐdƵŶŶĞůͿΎ ϭϱϬ ϭϲ͕ϱ ϲ͕Ϭϵ Ϯ͕ϭϮ

ΎŚĂŝŶĂŐĞĂĐĐŽƌĚŝŶŐƚŽďŽƌĞŚŽů ĞƐƌĞƉŽƌƚ͘,ͲϭΖΖŝƐŝŶĐŚĂŝŶĂŐĞϱнϭϱϴĂŶĚ,ͲϲΖŝƐŝŶϭϭ
ϭнϱϯϭĂĐĐŽƌĚŝŶŐƚŽůĂLJŽƵƚƉůĂŶƚ͘
ΎΎŚĂŝŶĂŐĞĂĐĐŽƌĚŝŶŐƚŽƚŚĞĐŚĂĂŶŐĞĚŶĞǁůĂLJŽƵƚ͘
Figure 6.1.1.3. Permeability values obtained in the area crossed by the tunnel.

6.1.2.- Lab testing

The lab results obtained onn different samples collected from boreholes performed in each
formation are presented andd analyzed next:

a) Zojila Formation Slate and Mica-schist

Two boreholes pass through this geotechnical group.

- t 30m approx. with the following laboratory testing:


BH-01, from 5 to

March 2016 / Version 2 46