ENG INEERING DEFINIT ION

PROJECT ENGINEERING

PROCESS
PIPING ENGINEERING / LAYOUTS

CONTROL, INSTRUMENTATION & TELECOMMS

ELECTRICAL
SAFETY
MECHANICAL

PROCUREMENT
CIVIL / STRUCTURAL - ONSHORE

STRUCTURAL - OFFSHORE

HVAC

MATERIALS
PIPELINES - ONSHORE
DELIVERABLE T YPE

ProjecDte sigBna sis Y


Operating Philosophy Y
Comissioning, Start Up and Shutdown Philosophy Y
Capital Cost Methodology Y
Capital Cost Estimate Y
ITT Technical Section - Scope of Work Y
Project Risk Register Y
ProjectQ uality& T echnicalR eport Y
Project Risk Workshop Report Y
Cost Risk Workshop Report Y
Schedule Risk Workshop Report Y
Infrastructure Study Report Y
Logistics & Transportation Report Y
Site Visit Report Y
Constructability Review Y
Value Engineering Y
Permit & Approvals Requirements

Process Design Basis Y


ESD Philosophy Y
Winterisation Philosophy Y
Isolation Philosophy Y
Control Philosophy Y
Relief, Venting, Drainage & Blowdown Philosophy Y
Start Up Philosophy Y
Overpressure Protection Philosophy Y
PFD's Y
UFD's Y
Main Process P&ID's Y Main line sizes only
Utility P&ID's Y No distribution headers
Utility List Y
Equipment list Y
Line List Y 4" and above Pr ocess lines - velocity and dp not required
Main Process Heat & Mass Balances Y
Utility Balances Y
Process Simulation/ Report Y
Pipeline Steady State Hydraulic Analysis & Report Y
Flow Assurance Report (inlcuding Transient Analysis) Y
Flare Study Report (including relief valve sizing) Y Sizing of main relief headers only
API 14 C Analysis Y
Shutdown Cause & Effect Charts Y
PED - Design & Operating Conditions Y
PED - Isolation, Relief & Blowdown Y
PED - Materials Y
PED - Control System N Ifr equired
Process Equipment Data Sheets (Major Equipment) Y Major Equipment Only
Process Instrument Data Sheets - Control Valves (Main Process line Y Will impact accuracy
Process Instrument Data Sheets - Relief Valves Y Will impact accuracy
Process Instrument Data Sheets - Flowmeters Y Will impact accuracy
HAZOP Close-Out Y
Utilities and blow-down planimetric flow diagrams

Piping Design Basis Y


Layout Design Basis Y
Specification for Piping Flexability Analysis Y
Critical Line List Y
Piping & Valve Material Specification Y
Overall Field Layout Y
2-D Plot Plan Y
3-D Plot Plan N
Piping Stress Analysis Report N
Piping Specials Lists N
Tie-in Schedule Y
Piping Line Shoot Y
Valve Data Sheets for LLI's N
Equip Arrangement Key Plan Y
Equip Arrangement Drawings (1:250) Y
Piping MTO Y
Valve MTO

EDS Philosophy Y
Metering Philosophy Y
Telecomms Philosophy Y
PLMS Philosophy N If project involves a pipeline.
Telecommunication System Functional Specifications Y
Integrated Control & Safety System (ICSS) Specification Y May need to be split into three specs if not an ICSS
General Instrumentation Specification Y
Package Equipment Specification N Usually combined into Gen Inst Spec unless specified in ITT
Wellhead Control Panel Specification N If project involves wellheads
Metering Specification N If project involves Fiscal/Custody Transfer Metering.
Instrument Data Sheets N Only if ITT requires them.
Prelim Inst Cable Schedule N For Level 2c estimates only or if specified in the ITT
Control and Safety System Topology Diagram Y
Typical Telecommunication Room Layout Y
Shutdown Cause & Effect Charts N These are a Process D ept. deliverable at FEED stage.
ICSS Database including I/O Sched & Index Y Could be Intools or Excel, depending upon size of Project
Prelim Inst Cable Block Diagram N Only if ITT requires them
Control Room Layout Drawing Y
Overall Telecommunication System Block Diagram Y
Bulk Instrument MTO N For Level 2c estimates only or if specified in the ITT
Technical Requisition for LLI's N For Level 2c estimates only or if specified in the ITT
Basis of Design / Philosophy Y
Protection Design Philosophy Y
Trace Heating Philosophy Y
LV Switchgear Specification Y
MV Switchgear Specification Y
UPS Specification Y
Long Lead Item (Generator) Specification Y
Long Lead Item (Power Transformer) Specification Y
MV Motor Specification Y
LV Motor Specification Y
Overall Single Line Diagram Y
Power System Studies Y
Electrical Requirements for Packaged Equipment Y
Verification of Client Specification and Applicable National Codes Y
Electrical Load List Y
Cable Schedules Y
LV Swtichboard Datasheet Y
MV Switchboard Datasheet Y
Long Lead Item (Power Transformer) Datasheets N
Long Lead Item (Generator) Datasheets N
AC UPS Datasheet Y
DC UPS Datasheet Y
MV Motor Datasheets Y
LV Motor Datasheets Y
Power Layouts Y
Cable Routing Layout Y
Substation Layouts Y
UPS Single Line Diagram Y
MV Single Line Diagram Y
LV Single Line Diagram Y
Instrument Power Supplies Single Line Diagram Y
Bulk Material MTO Y

HSE Design Philosophy Y


FireP rotectionD esignB asis Y Mandatoryb utO ptionalo utsideU KCS/NCS
Passive Fire Protection Philosophy Y Mandatory but Optional outside UKCS/NCS
Fire and Gas Detection Design Basis Y Mandatory but Optional outside UKCS/NCS
Project Specific Technical Specifications (PSTS's) Y Mandatory but Optional outside UKCS/NCS
Project Safety Management System (SMS) Y
Project Environmental Management System (EMS) Y
ActionT rackingS ystem( SHEAPS) Y
Fire & Explosion Risk Analysis Y
Gas Dispersion Analysis (incl H2S) Y
EERA (Escape, Evacustion and Rescue Analysis) N
Health Risk Analysis Y
Environmental Management Plan Y Mandatory but Optional outside UKCS/NCS
HSSE Plan Y
Safety Critical Elements (SCE) Y Mandatory but Optional outside UKCS/NCS
Performance Standards Y Mandatory but Optional outside UKCS/NCS
Environmental Review Document Y
Input to Safety Case Documents Y Mandatory but Optional outside UKCS/NCS
Safety & Warning Management & Precautions Document Y
Safety, Health & Environmental Actions Progress System ProcedureY
Fire Fighting System Hydraulic Study Y
Fire Water P&IDs Y
Deluge System Typical P&ID Y
Fire Protection Layouts Y
Fire Water Demand Summary Reoprt Y
Emergency System Survivability Assessment Y
Safety Critical Element Assessment Y
Demonstration of ALARP Strategy Y
SHEAPS Action Database Register Y
Environmental Effects Register Y
BasAe ssumptionRs eport Y
Reliability, Availability and Maintainability (RAM) Study Report Y
Preliminary QRA Study Report Y
HAZOP Report Y
HSE Evaluation Report Y
Preliminary SIL Assessment Report Y
HAZID Report Y
ENVID Report Y
EIA Report Y BOy thers
Fire & Gas Cause & Effect Chart Y
Safety Equipment & Escape Route Layout Y
Fire Zone Layouts Y
HazardousA reaC lassificationD rawing Y
Fire & Gas Detection Fire Zone Summary Chart Y
FireF ightingE quipmentS pecification Y
FirewaterD esignS ummaryS preadsheet Y
Fire water planimetric flow diagram Y

Basis of Design N
Equipment Specifications Y
Project Specifications Y
Project Procedures N
Equipment List Y
Emission Study N
Compressor & Driver Selection Study Report Y
Mechanical Equipment Data Sheets Y
Package Data Sheets Y
Technical Requisition for LLI's N
Technical Bid Evaluation N

Procurement Philosophy/ Plan Y


Shipping and Transportation Plan Y
Preferred Supplier List LLI's Y
Supplier List LLI's Y
Prequal Enquiry Y
Request for Enquiry -LLI's Y
Enquiry Co-ordination Y
Clarification Co-ordination Y

Civils/ Structural/ Architect Design Basis Y


Landscape Philosophy N
Foundation Philosophy N If considered critical, subject to location
Meterological Data Evaluation N If considered critical, subject to location
Topographical & Geotechnical Survey Specification Y
Architectural Building Elevatons and Plans Y
3D Model N
Foundation Calculations Y
Road & Drainage Calculations Y
Blast Ananlysis of Building & Pipe Racks Y
Basic Structural Calculations Y
Tentative Pile Layout Drawings Y
Foundation Layout drawings Y
Road, Paving & Finishes drawings Y
Surface Water Drainage drawings Y
Structural Layout Drawings Y
Civil MTO Y
Structural MTO Y
Sewer System Planimetric Flow Diagram Y

Structural Design Basis Y


Architectural Philosophy Y
Preliminary Hydrodynamic and Wave Study Y
Geotechnical Survey Specification Y
Configuration Study N
Installation Study Y
Structural Calculations Y
Substructure GA's Y
Topside Facility GA's Y
Weight Report

HVAC Design Basis / Philosophy Y


HVAC Equipment List Y
HVAC Sizing

Materials Selection Philosophy Y


Corrosion Protection Philosophy Y
Passive Fire Protection Specifications Y
Coating Specification (Pipelines/ Structures/ Equipments) Y
Plant paint specifications and insulation specifications
Fabrication and Welding Specifications (Pipelines/Vessels &
Equipment/ Piping/Structural)
Insulation Specfications (Thermal) Y
Specification for Cathodic Protection Survey Scopes Y
Materials Specification for Pipeline & Facilities
Specification for Supplier Requirements for Submission of
Welding & Inspection Documentation
Pipeline Cathodic Protection Design & Calculations Y
Plant Cathodic Protection Design & Calculations Y
Materials Selection Report/ Pipeline and/or Facilities Y
Building Material for Cathodic Protection System Y
Material Selection Diagrams Y
Cathodic Protection Layout Drawings Y
Cathodic Protection Standard Drawings Y
Data Sheets for Cathodic Protection Equipment & Anodes Y
Technical Requisition for Cathodic Protection & Specialist Material Y

BDaeossfi isg n Y
PipelinPeh ilosophies Y
GeotechnicalS urveyS pecification Y
TopographicS urveyS pecification Y
CSPu rveSyp ecification Y
ConstructionS pecifications Y
MateriaSl pecificationsL LI's Y
PipeliSnteu dies Y
DesTko Rpo utinSgt udy Y
PipelineT ransienAt nalysis Y
ScopoeWf orfko Sru rveys Y
InterfaMcae trix Y
Permitsa ndC onsentMs atrix Y
Constraints Matrix and Crossings Schedule Y
Derogationst oN ationaCl odes Y
PipelineM echanicalD esignR eport Y
MaterialSs electionR eport Y
StresAsn alysRise port Y
PipelineC PD esignR eport Y
PipelinSei teV isiRt eport Y
OveralFl ieldL ayoutD rawing Y
SurveRyo utinDg rawings Y
TrialP it& B oreholeL ocationD rawings Y
LandA llocationD rawings Y
RoutiDnrga wings Y
Maps/SatellitIem agery Y
PipelineS ystemS chematic Y
MateriaDla tSah eets Y
RequisitioLnLs I's N
TechnicaBl idE valuationL LI's N
MateriTaal ke-off Y
PIPELINES - OFFSHORE
BDaeossfi isg
MANDAT ORY COMMENT S
if not an ICSS