METRADO DE CARGAS

PRIMER NIVEL
DESCRIPCION # L A H P. ESPECIFICO SUB-TOTAL
C-1 4 0.3 0.6 4.75 2.4 8.208
COLUMNA
C-2 4 0.4 0.6 4.75 2.4 10.944
V-101 2 6 0.3 0.6 2.4 5.184
VIGAS V-102 2 6 0.3 0.5 2.4 4.32
V-A 2 10 0.25 0.5 2.4 6
%
LOZA 10 6.7 0.3 20.1
PISO TERMINADO 10.8 6.7 0.1 7.236
S/C VIVA ALMACEN 0.8 10.8 6.7 0.5 28.944
TOTAL
90.936

SEGUNDO NIVEL
DESCRIPCION # L A H P. ESPECIFICO SUB-TOTAL
C-1 4 0.3 0.6 3 2.4 5.184
COLUMNA
C-2 4 0.4 0.6 3 2.4 6.912
V-101 2 6 0.3 0.6 2.4 5.184
VIGAS V-102 2 6 0.3 0.5 2.4 4.32
V-A 2 10 0.25 0.5 2.4 6
%
LOZA 10 6.7 0.3 20.1
PISO TERMINADO 10.8 6.7 0.1 7.236
S/C VIVA VIVIENDA 0.5 10.8 6.7 0.2 7.236
TOTAL
62.172

TERCER NIVEL
DESCRIPCION # L A H P. ESPECIFICO SUB-TOTAL
C-1 4 0.3 0.6 3.6 2.4 6.2208
COLUMNA
C-2 4 0.4 0.6 3.6 2.4 8.2944
V-101 2 6 0.3 0.6 2.4 5.184
VIGAS V-102 2 6 0.3 0.5 2.4 4.32
V-A 2 10 0.25 0.5 2.4 6
%
LOZA 10 6.7 0.3 20.1
PISO TERMINADO 10.8 6.7 0.1 7.236
S/C VIVA colegio 0.5 10.8 6.7 0.25 9.045
TOTAL
66.4002
CUARTO NIVEL

DESCRIPCION # L A H P. ESPECIFICO SUB-TOTAL


C-1 4 0.3 0.6 4.2 2.4 7.2576
COLUMNA
C-2 4 0.4 0.6 4.2 2.4 9.6768
V-101 2 6 0.3 0.6 2.4 5.184
VIGAS V-102 2 6 0.3 0.5 2.4 4.32
V-A 2 10 0.25 0.5 2.4 6
%
LOZA 10 6.7 0.3 20.1
PISO TERMINADO 10.8 6.7 0.1 7.236
S/C VIVA Auditorio 0.5 10.8 6.7 0.35 12.663
TOTAL
72.4374

QUINTO NIVEL

DESCRIPCION # L A H P. ESPECIFICO SUB-TOTAL


C-1 4 0.3 0.6 2.1 2.4 3.6288
COLUMNA
C-2 4 0.4 0.6 2.1 2.4 4.8384
V-101 2 6 0.3 0.6 2.4 5.184
VIGAS V-102 2 6 0.3 0.5 2.4 4.32
V-A 2 10 0.25 0.5 2.4 6
%
LOZA 10 6.7 0.3 20.1
P. S/C AZOTEA 11.1 6.9 0.1 7.659
S/C VIVA AZOTEA 0.25 11.1 6.9 0.1 1.91475
TOTAL
53.64495

CARGA TOTAL DE LA ESTRUCTURA 210.98115 TON