You are on page 1of 32
9. SALAMANDER ENERGY er MEINDO bpmig (BANGKANAI) LIMITED —o KERENDAN GAS FACILITIES SEBK-082-11 TEG GAS DEHYDRATION UNIT SPECIFICATION SEBK Document No. BKDD00-ME-1L-47-008 0 | 110213 [poprovedtorconsiucion AFC) | P| 6g | ade] rev] are ISSUE TPE car once aseron coumuie) 9. ‘SALAMANDER ENERGY fh) 1 MEINDO, bpmigas (BANGKANAN LIMITED —- ea Ta we ae ones Tog SETORATEN UT @ [ven] aoe iN eT Date Description {0208-12 _ | leeved For Roviow (FR) (04-10-12 | Issued For Approval (FA) 26-11-12 _| Re-esued For AnprovallFA) 24-12-12,__| Re-lesued For ApprovaKFA) ‘Approved fr Constucion(AFC) wif revision as below: ‘Add GaslGiyoo! Heat Exchanger (page 6/32) Update Reference Document 9s por MOR (poge 8/32) Revised Goneral descision (page 12/32) Revised Strpping Colum description (page 17/32) ‘Add Sill Column Dasergtion (page 1632), ‘Add Gas/Giyoo! Heat Exchanger description (page 17/32) ‘Add TEG Make Up System description (page 1732) ‘Add ColdHol Glycol Heat Exchanger (page 20/32) Revised 88 per Clent comment for Instrumentation and Controls (page 2132) | 0 7.0243 9. ‘SALAMANDER ENERGY EMER bpmigas } (BANGKANAI) LIMITED memes nk enn Tee ER THE we ORE] we ouEsna TsO DERTEN NT © |rwas | sae ‘SPECIFICATION fom a TABLE 1. score - s 2 DeFWTION . . 7 2. UNITS OF MEASUREMENT . 7 4. REFERENCE DOCUMENT bo 7 5 ABBREVATIONS. . . nl 6 APPLICABLE CODES & STANOARDS.. 8 7. EWVIROMMENT CONDITIONS & AREA CLASSIFICATION . 1 7.1 vt Contos: " 72 ha Cases eT umuies " 84 Waters " 82 Eh and tuner yt " 8. DESIGN REQUIREMENTS . 2 81 Cav 2 92 TEG Cone 8 9.3 Glycol Regenerator. 14 9.4 Piping, Valves, and Fittings. _ 20 15 uments Cnt 2 26 hectic Regutenen... 2 87 kDa 25 88 lnspectn and Tsing - 2 99 Nae Pats — 2 9.10. Supplier Data Requirements, ~ 20 9 SALAMANDER ENERGY ( BLNGINBass bpmigas } (BANGKANA\) LiMITED ee Seem Te me ne | we Somnus ogee RONUNT a [armas | euae 17 Potave Coang and radan 3 10. SPAREPARTS AND TOOLS. x0 ‘Statp and Commision SB nn x0 “wo Yar Spars . a) Teal 0 1, START-UP ASSISTANCE . . a 12 PREPARATION FOR SHPUENT. . a 13. GUARANTEE AND WARRANTY. - 32 9. SALAMANDER ENERGY O |: MEINDO ARO RBare bpmigz (BANGKANAY) LIMITED —— somnesoe HagEREATOOT © [roan | ease ‘SCOPE ‘Tis specteaton covers the minimum requreneis govening te desn,fabicatcr, assembly, testing, ccumentfon, and dlvry of TRL-ETHYLENE GLYCOL {TEG) GAS DEHYORATICN UNIT to bo used af Korean Gs Facies, ‘Ts Spelleaon hal be used In conuntn wth the dreing and data shoes melon below in ths ecument ‘Tho pupote of this specteaton and referenced codes, stntans, general specications and projet acumantse estat vel of aczeplale uty. ‘Aterato standart desis of calor super quay ay be pososd, Ary excepton 0 he requirements of ‘is pecan shal be submited in wrng fr esl by the Convactso COMPANY approval Tis document defines te scope of wort requirements for TEG Gas Dehyrston Unt consis of TEG Cortacor rt Ragneraton geckage. tis ol the into Bet eac and every lam sic equred however this docuront s prepared tines the overall scope J seroes ofthe package. The scope of supply / series isthe dead cut nb specication ard cataseets. “The supply the TG Pactage shal include he folowing majo: ecupant, a a iin 8, TEG,Gs Contac b, TEG Regenerator, consist of ‘+ TES Reboer Fred Hes} + TESSe Colm + TES fue Condenser + TES Rash On + heal cade Fer + trate Carton Far TES oeutonPuros +__TESSugeDun 9 SALAMANDER ENERGY oO » EA MEINDO 3: (BANGKANAI) LIMITED bpmic DoSaERT MOR Te [aE] aS SEORATON NT 0 [utman | eorse COME LE gyrate + Ci iol eat Bchanger + He Geol eat changer ‘+ TES Make wp ard Oran Syston + Geto Heat Exchanger 6 pH Butera oan Sein ton Stem fue 4. Mesto Aaj and Poa Aner 2 Onekinetunents, contol and montaig doves {Ons vasa tgs, samp poets On skid wing cates adjunction boxes nh Stusta ee Ary radon or ttre pacing at ay be equ or cols and cages ers | Plato ads, nt hari, aequed 1 Thrtnatn an tac egos 1 Pei an coting rm. MUGAS cenctan fora peste Wess, nest exchanges (cca, condone, ete), ites, end reboles 1. Consunabls (29 fier eleners and commissioning pats), pce separly ©. Two @ years opeaton sare par, separately priced Compe data book er peraton ard maintrarce 4 Inspeion and tesing nce FAT, SAT, Startup Asien and Ting ‘ho Supple shal assume tu unt responsi Yor the package desen suppy ant perormance of at comgonant snd arity equpmart necessary to th TEG package cola, safe andaady for vuble tee peraton. 9. SALAMANDER ENERGY Dusen bpmigas (BANGKANAI) LINITED eae —— ao =e | me ee vee eCreATO © [raz] rors ‘Sipplar eal be response fra coor Issues. Al matrls and comport for dos n wih CONTRACTOR 1 COMPANY for design and Tesing in, fabicaton, and testing ofthe package shal be te respentily ofthe Supa. Any enhancements, which Supper belves could porate ease of operon, enhance sale reduce maitnanc, may be those equremens. DeFINTON Te fallowng ems used inthis speietn shal ‘COMPANY (CONTRACTOR Supple Vendor proposed as separate prea adds ded in adeno eet he marings gen blow. Samander Energy (anglan) Lined PT. Mend lang Indah Manufacturer or tbe Coury rpresitate of ecogniznd product who has teen aported for april cop of supp. UNIS OF MEASUREMENT Al Unis stl b inated in Sanda items (S) nis excep pipe sz). 4 REFERENCE DOCUMENT ‘The foloving spol shal be considered part fis spetiestin: ‘5kOD00-ME8 72401 Process Design Base ‘BKOOGO-NE-18.40401 echarical Design Eas ‘BKOOODE-1.0-001 ‘Spestieaton for Geer Pressure Vessel ‘BKODODE-1.0-002 ‘Spesticaten for Gewal Pump ‘BKODOO-E-1.00-050 KODODE-11.00051 a | BKODOO-E-1L.00-052 ing General Speciation Ping Note Spectiaton Painng Speciation | BKODOO-ME-1.00-053 Instn Speci ([Bxo0o0- We. 1L 2064 Support Specteston BKODOO HE-L-0-055 ‘Spectieaton for Pie, Figs, Flanges, Gael nd Bok (bxoo0.we. 2.80.08 ‘sol Geveral ination Specfaton 9. SALAMANDER ENERGY MENS bpmigas (BANGKANA\) LIMITED iene ori ‘DORON RINGER Te ONE | mae ODE Le TescisoesrpurN iT 0 [urea | worse ‘BKODODHE-3L@0.005| lcal Cables Spectcaton KODOD:NE 3 aD 004 _Elecal LV Mote Speticaon ODODE. SL-aD005, lca fr Package Spectaton BKDDOONE-30:37-001 kcal Standard Orang fr Powe ‘BKODOO.NE-30-7-002 kcal Standard Orang for Lighting ElctalSlandard Orawig fr Grounceg and Ughinng | BKODOONE-$0:7.003 Proteten | BKODOONESD-7.004 Elta! Sardar Drawing for Cable ray BKDDOONE-L7.001 ‘Speseation for General nstunertson BKDDOONE 467-006, ‘Spectetn forinfoor/Ouéor Pan and Cabinet ineeurent ard ConelFuntoral Speileaton BKODO0E 47.008, Pactages — | ‘kO000-E: 457000 Instunert instalation Spcteaton ‘BKDO0D-HE 40.45 001 Instunent Hook up Drains | ‘KODOD-¥E 4045-002 Inseurent instalation and Mouring Dts | ‘BKOD00 WE 40.4001 InsturentJ8 Wiking & Teminton Diagrams ‘8KO00D-ME 6.78.04, ‘Ste Soeciston| ‘BKODOD-ME30-1-002 tia! Hazardous Bea Cinsaton ‘BKOD0D NE: 60-65-502 ‘See Pian for Plant & Camp Awa 'BKOO02 HE 00-09-003 PFD ~ Ar Ctr and TEG Syst 'BKOD02:E 00-05-010 PID —TEG Coracor | ‘X00? 00-06-010 PID=TEG Regeneratin Se ‘KODO NE £90108 Inspcton ar Test Plan or Equine: BKODODE ALS7.011 Speciation fr nstument and Telcom Cable | o-K0090008| ‘Anproved Vendor Lit 5. ABOREVATIONS res THEtylene Gel aus ume Management System cor Cental Cott Room ess Emergency Shutdown Systm ess Interatad Control & Sate Syston 9. SALAMANDER ENERGY Deere bpmige (BANGKANAI) LIMITED ELANG INDAH I = oe are =a hese e ‘Ingress Protection Pes ‘Process Control System ro Programatle Loge Conroler 5 a es a o — ore Central Processing Unit penetrance ‘Tha ltet esos ofthe flown coves and standard re considered a ato his spectcton. air2@0U APIRP 520 APIRP 24 APIRP 51 eI RP 552 PIR 550 11600 201661 p01678 101875 ‘ASME Secton| ASME Seton ASME Secton V ‘pectaton for Geo-Type Gas Dehyraton Units Sting, Seleston and Insalaion of PresureReleving Devs in Retnetes Guide for Pressure Roievng and Dopressuring Systems Proosss Measurement insbunertaton Transision Systoms anal ofan of etry nsrument and Cot System Pat 1 Fed Hester an ne ee Ganartrs Shall & Tuto Heat Exchangers for Gone Refinery Sanices ‘AisCooed Heat Exchanges fy General Refinery Senice Poste Displacement Pups -Recipocaing Positive Displacement Punps -Contoled Volare PVC, Power Boiler Matas ‘Non Desrucive Exainaton 9. SALANANDER ENERGY Qawiete Peniees (BANGKANAD LIMITED HANNA —— i =a es es agi > [awwae) wae 1S Son Dv PVG les sadn ese Ves AS Sen iting art rg ants Ase 165 pe Fagen are Fig - PS teh S24 Ave 1647 ae Dae Sul Fg -NPS 28 rah NPSEO sve 03 ress Pe ssoeserres mun Ces ss Bigs a he Ses veo. Scaling Cie evita tt rsp npn Donen cours neta pats Ets Ge Anostons secon Porites cmt Fre aig Chacr lect aes couse Tessen Ser Cable reFe Contos corn Dee el Precio Poiety rae (Pa) sasenot Alen Sy arent Spo rT Ps ny sass tunity nd titon sass Be an Pn Opera sass Cooke Sls fo Sebel cy router sa se vet a Dap ines Gash tr ces opin wastes al han Hc Aronson, es Cea Cae tat He Fannab t nace anorss0 Peru el Gos nies — Nail Ue ‘8 Conan Eneomens non a Poston Hts oer an Crt Sn ars Coes osia estore Air Ss ra Sander xh Mc Asan 9 ‘SALAMANDER ENERGY © 1, MEINDO, ENGIRBans bp! (BANGKANA\) LIMITED Soto BSDNENT NER Te mE] aces opOo ME NLA TEBGASDEHORATONUNT © [area aon | ss use Usiorm Bling Cote wae 107287 cal Sveses in Sphrcal and Cynical Sets due to Extra Leatings 7. ENVIRONNENT CONDITIONS & AREA CLASSIFICATION 74 Environmental Conon 1.2,rea Cassifeatin: Bevaion ‘7.056 meters (above sea level) Wind Volt Avetage os = 2067 is Earhqual face Zone feo 0.158 ‘Ai Tenpertre ‘verge 258°C, ei 235°0, Man 3S Pressi erage 147 pie ain Fa Average 2862 moar ‘Ne Humly 5% ‘General Geogiaphie Condon Troptal Forest ‘core equpnert lected in hazardous aes sal be cated fo exlosion pro! Ex(), Zane 2, Gas Group A, mp clas T3 ad IF 85, less specif abherwse onthe Area lasscafon Drawing. Junction ‘Box shall b EE() IA TS card fr Zane 2 appleaton wih Ee and Ee IA Cable ind & umes 81 Witer System Ne TT aseipion [vay water Firs Wate 1 | Spay Pests, uthest unt batt (bar) | 18 a5 2 [ supe Temperate () 287 257 82 Eheteal and Instrument Syste: No] Description 7 1 [1001 63 Paso 3 Wes 50 He, Soli eared fr nomal LV Motor Load 9 ‘SALAMANDER ENERGY © : MEINE aap bpmigas =» (BANGKANAI) LIMITED enn ot cn DeDRENT MEER Te me [OnE] ae OOOO ME L708 TO GIgDEREMTON UT 0 [iran | seers 2 | SOWACEP hase, 5 or4 Wes, Sz, Soy eared or nomal package equpnent and nomal snot static nd pe. "50V AC t-Phase, 2 Wes 50 He Sol earthed for amaliging, ronal smal power oad & oral motor ating bebw 0 HP Instone Ar Design Pressure: 123 849 + Mac Poss: 114 8a Normal resi 8 arg Minimum Pressure: 78 Bary 9 DESIGN REQUIREMENTS 94° General ‘EG Gas Dehytraton sytem shal be used fo dohyraton of wae saturated wySrocarton gas. The proces stall be contuousabsorpton ung TE a the hygroscopic medium ‘EG package sal be designed fr conénuous ue ia an exposed, ctor, pial and onshere els, TEG craton rte sal be sisted in project data shoe. Suplr shal Somonsrat tat the urenoed out condon ae achievable wih the proposed ciclson rte and Gijcol Cantacar acing hag fora he opting range undown rae as spect nthe detasheet, “The TEG package shal be dosigot ard guaranteed to prove the requis Siles Gas Spceaton a3 stated inthe Process Design Bass BKDDUO-NE-0B 2.0% without coninrs usage of purge gs by maianing apororat len TEG elton ree and pu. The emisen fom TEG Sit Colm coterhead sal bo win 4 kor of hyo carton “The att ge png neface fanges shall be designed to wtstard th piping forces a defined in ‘8 COMPANY Soecigton ‘The TEG peckage sal be dsgned wth reer geo makeup ard dain sem. Suppor sha ‘abi inher proposal th gol make-up ard craig tom ‘A ters sal be lozated in cenenon ain odo it ras sujet tsitagetplson. Te 280 rund ters shall ensure asoessbily fr easy marienance and handing eed lr. RGY ‘SALAMANDER ENERG) Ouwee bprr (BANGKANAI) LIMITED seer DOCaNENT MONBER Te woe | me ODODE A708 TESS DENDUTONUNT 0 [sem an0 | ra0rse “The paps sal be mut ran acossbe eaon an re ppg arangod sch tat tb puns and meters re esiyemovabe or mainenance without renvirg te ppg. ‘The Supper sal when devoping the layout ge due consieraton + Sle erty anesape oes + iam sie weg +m sto eeton rd hok up + Mri ites wih PURCHASER yt + Masiour sing n Be Suppers wert he compet its) + Ensue adequate acess for maltonace ant inspection ‘Al equipment lassid as a pressure vessel shal be designed and cvsturted as per COMPANY ‘specication 8KO002-ME-tL10001, "Speciation for Geers Pressure vessel and ASME VI, Oi ‘TA eovabe inter stl be desged to passthrough he manny Unless otters sof, th mata for TEG Package shal be etn ste. A intra and ‘tral bolig shal be 3T6L pe stares stool and provided wth doubo nuts. TEG Contactor shal be proved wth suppr cps fo aes and pats an ping fr vessel ip axes. Swing type lav shal be provided fot emova of anole ange x al he pressure ase, ‘Shel and tube heat exchangers shal be designed and constuted es por TEMA, and AP 60 Isolation bck vas, pressure ard tpaae gauges shal be poe athe entry an ent of each exchange. For vesols sal be designed and consturted as per BKOOOO.ME-L00.001 Spccaton fr Goer Pressure Vessel and ASME Vil. Te op ensure shal be easy rercnable by means ofa roaingdavit Quick opening csues wih pressure safety device shalt provided for op change ‘vero cages. lation lc vas, vt and dan valves sal epee fo esc er. TEG contactor ‘EG Contactor sal be desig for minimum tundoun of 2% of dx gs fow. Supper shall ‘aie the maximum gas flow hats alowed tough the Contactor macinum pressure dp, based cont nga ofthe packing. ‘EG Canfactr intemal shal be 85318, The ow carbon materi (316) shallbe used when any hot working sppaton produce th struct packing. 9 \ SALAMANDER ENERGY oO A 7, MEINDO | = /ELANG INDAH bp [O's (BANGKANAL LIMITED eee me ER THe we pee UMN | TES cag DoRATONUNT 0 |rnrwans | sare 93 ‘Centar sal ave bl wp vlane wih iru 5% of paced vole, ‘Tre gli shal be sated on the Seo he vessel below te rit lint. ltr png shal be proved to cave the ayo to enter evenly te ay sua. Ful oper bal avs shal be ‘tates on al rts 2d outs, Acheck ave shalt installed decty one eet conecton tote vessel ‘Te tower shal be exupped wth in ting gs wach o be stengh- waded toa pat. The pas shal bestengt-woéed to the owe. Towers wih ager damelers shal have mares wih a micimum ieee of 20 menes (nics diameter) as per BKCOOP-ME-IL20001 Spactaton for Genera Pasue Vso, Sul packing shal be instal to meet the process urate. The vessel ‘ogring shal be arged we be anges instal |Alquid oe contl rans shal be stale to have conolabl rage. ich gal shall be at tte chimney level ofthe vessel and sal be proved to cover ete gud be push gs inet ote [Arte sgt ass sal be frovied the ene range fa he tre for toe chimney fo. The ‘hmnay cap shal be desgne to prove ven dtrbuon of gas the totom tay. Fed gas enters the TEG Contactor blow te Chimney tayo int separator. Int separator shal be roe a the Btiom ote chimney vay ine TEG Cotto rrove thei aqueous condensate omed ‘Tre condensat(qulaqueois) willbe soto MP Separator Vessel on ovel onto. iycol Regenerator Refux Condenser Fefux Co Condenser shal be sed at he np scton of Stl Cour wt aged conecon, ‘Tie Condeneer col hall be removable ype ant the marl shal be 25 per suppe’s ‘ecormandaton ‘Aveta! slant ube type exchanger i an acisabe ateatve fr this condense. The hest ‘echanger and condenser sabe designed and frist in acorance wih TEMA and COMPANY secteaons. 9. SALAMANDER ENERGY va Qe en bpmigas 22 (ANGKANAN LIMITED en | Samar 7 a pee meena Tag Set © [irene Pare The condenser hal be round on the gy] eererao cl coun ad ted wi arerovable SS {16 L helical cos. The condenser cl maybe fax fom famed pipe. Condensing steam hea ‘stl be inte sek “The refx cot vahes and ping stall have te sare mechanical design presse ab the gas conatr' revert damage ssf crtanmentincase Supple’ level conto va fas pe. Vapour inet and condensed vpour tum shal trough the sell cove ange. The cover ange tal be desgned to be compel wth Be tp fnge ofthe gyal i lure neal bees may be requte to reduce bypassing. A temperature col ansmiter ard et contl vate shal te provided for col emperate con, ‘sil coum ‘Su Coun shal te designs to support rex leontensar and lated en op of eb wih a fangedcomscnn, St Cura materal of conructn shall be designed fx SS 36 ype, random pecking or stutral packing shal be confirmed nd designed by Verde. Te packing suppor sha eof 53161, ‘The counn sna be designed o alow an aditaal vapour fow to 150% the maxinum snip ‘ae, and shal be designed for ficient operation tough te ‘ul spaced rang of operating craton Each ond fhe vessel sal be fang, The lot targe shale be othe tp nozl othe gy! rebolt. he eux condenser salle toed ote urperfange. The clin and condense sactons ‘shal be lange separate uns. The fu lt nazi sal be on este ofthe vss atthe midpoint ‘ard shal be desgned fox Grou of he iru qui. The gyal sl cum and assole piping shal be insulted for ot sre. Cavs as ler required for repars,replaamenis, or rmantenance sha be supp (ne Kui ib tay shal be salle Belo th top ange face. The op buoyant the Inet buon piping shal be renova Inspection fange win a bind farge pt hal be proved near tho lowe ange, The inspecton fang sal be allt the vesel and lots abwe te packing suppor. Dern Pressure Tanita across sl olun pctng shal be provided for mont pacing cendien 9. SALAMANDER ENERGY © -weynvo BANG IRBAn bp! (BANGKANA\) LIMITED — ose SOIT MER Te Re [ONE | maces MCE MEALT a Tee AS DEIUTEN UT 0 | sve0.200 | se0rae “The oat get forte TEG Sil Couns verted amorpore wich i mostly Conpied ol wat ‘ard C02 wih races of Hyecerten, The emission shat comply as ge Indonesian Misty of Envionmet Regus fr TEG Petar (0.8 kg HC per msc of as tesa). Reboller “The fuel gas fred Reber sal be fre tbe type, Sesgned and constciedin accordance wth APL 12600. An aoa uel conta sal malta aearstantemgeraiein gel ele. “Te BMS shall be designed to mintindyclteperatue nth TEG Si Colin win speci ‘ange cng turcown ant startup operation (oad change). Avorn il shot valves shal be provides. The valves stab operat tom the package contol ‘ane The shto valves shal shut pet ard primary tl the reboer temperate ora nt femayercy shutdown ‘elt monitorng and canal netunectaton shal comp wih he nseunent and Cia Funconl ‘Specleaton for Package SKODOO-NE-4L 87-408, “The Role shal be Sefer bout 1108 ofthe estimate heat uty prove sarap isan loses, nrased cesaton ras et. ore and above te fouling factor. The ow area of rtm bunds, sand ns shall rot be ss han 0% of th fow awa ofthe ole ‘The heat equted er ropenerton shal be fused by afl gas fred neater sytem and shal be signs for compatity we tb ange instal at oe ro thereto Nether ec cols nor iwc waste exhausts heat cos re acetal ‘The Real package sha rete bunds, feb, buners, stack, supporting stuctues, ans ard uel conta stan. “Tho in tthe bet exchanger bonne stl be rafal and cated onthe top ofthe het exchange. ‘The cule othe net exchanger shal be radial ar lab onto bton ofthe heat exchange Equpment shal be aranged te parm the reboler bunt tobe removed ih minima dsasserby of czrnectig ppg on ‘The vessel shall have companion flange forthe heat ehanger at ono en. A anged azo to sipprthe vertical column shall be octed on he tp of he vessl at he oa exchanger ange end, “Two inspection farges, complete wih Hind fange plates, shal be proved a he op ofthe ess ne ofthe inspection Nangos shal be cated above the neat exchanger bundo, The oar fa >. SALAMANDER ENERGY © > et. MEINDO | bpmigas = (BANGKANA\) LIMITED BLANGINDARE =a Ta =a pee aan a ae © [wean | rrane GFalbe cated above te ape A ver and dn comecon sal be stale The rebar shal be ined Mano willbe provided by vendor sper standard minim vessel ameter. The rebler shal be provided wih a higheeeraue shutown device, A temperate controler ‘transite sal be provided fr heating contol Sipping Coun The provision of stipping gas sal be made for proven of he dew point by increasing the sich TEG ply Ae atomate design, Sparge Pp sale used instead sping col, Gas /Giyeol Heat Exchanger as Giyoa! Heat Exchanger i Stell nd Tube type exchanger. The lean TEG fom the Reboler scnangr het win th TEG Contactor out gs bore the lean TES erase TEG contac. By ogi, ott caryove of te TEG to contac eownsteam canbe aoited/innize, ‘TEG Makeup System ‘The TEG make up stm sale provides th TEG storage dru ar rake p pup for easy ake Uw of TEG ino the Surge Du. rovson sal te mate an tha the TES can be tansered easly from exteal suet TEG mate up du. ‘TEG Fash Voss! Fash Vessel shall epressuized wth LP Ful Gas an the vor of Fash Vessel shall be met 3s siping ges, Fash Vessel shal beatae tase haz epartr designed for @resierce ie 30 mites ‘of peraton The separator sl hav an ol colecon bucket PV sized fr govering cae ofr case o gas How (Sv fale of coat LCV) o Fun Gas anketng PRV flue sale insta onthe Goo lah Vessel, ‘a atamate gyealcondrste ince evel cto ansiter(plae Type) sal be instal, Nomal ve cael sal be leted a o prove maximum Neil slectng operating lev! yet ‘operat wth miu (es an 12 evel of geo. ‘SALAMANDER ENERGY BARE IRBans A (BANGKANAI) LIMITED Sees Sema Te wer [one | ee ‘xODO MELA aS BERYORATIN UT 0 [vans | r9orse Srecreavon contra ol erste al be ale. Raley gauge gases shal be sted 0 span th tu nge of ones lvelard gel ees. Ale ndetar shal be insta for intetare love. Tho interface vel shal api transparent ype vel Gg erage isang pressure rans nd tener lo nda. ‘TEG cage Pre Fiore and Charcos Fiters 2 100% TEG Pre ter shal be designed fr max TEG vounetc fo rao. Firatn efcenywibe 96% c partes § microns and lant Maximum pressure dep shal be ss than 2 pl (ceo) and 12 psi (Sy. Vendor aise er cape ternal pressure Fier shalbe pio ao aig inthe open ain sytem Fier cases sel be veal wih quick opeing type avrg bal) closures. Flanged sires ae not ‘eevbie The cosie gastet mata shal be BuraN. Ech orcas shal be equiped wth @ ‘avo ober means of reovig and hang te top cose iter cases stl be equoped with & fangdinspecon pening if th cer wat chamber. ‘caries sat be marofacured om suze materia wh comeresin ens, The bot end shallbe sealed agate stress steel seal caps and song. “TE6 Charcoal Fr sal be sale downsveam ofthe petro remove deradton reuters sd contanants fom TES. “EG Charon iter (1 100% wih a bypass s design fr 100% ofthe TEG celaton pane ava, Catton shal be coe! sed an ini esr me 29 ints Cc! eharoa! er shal be granted charcoal bed oe ad shal wze 10 mesh ganaed ‘hrcoal Suppor i shal Nav a a minum wo layers of 20 mesh sans sel seen. Fiter sal be eouiped wh a tential pressure rans. Devon pressure at design temperature shal be a sated poet data shoes Acces pata sal be proved to citi racer _Avertine wh vale shale prvde to revve vepourlak fom he op fit. 2. SALAMANDER ENERGY Darwen bpmig (BANGKANAI) LIMITED ‘ageeng mt one a at we ee AS DERORATON NT The er case sal be wera) and al bo fhe qukoreing tp (vig bol or clap). Panged closures are not acopable, Te sue gasket materia shal be Buna N. Th fit caso sta be femuioped wih dav or ter eans of emovng and handing the top cosire Fit cases shal be onuigped wih ange inspectnn opening ro he cle wt chanber Criss hal be ready-made and uly encase wth the ends seed apa! he post washer ard ‘he top sea agent the consresson- rt water. The cade Stal not exceed 26 inches length, an shal ot be stacked, The ebro sha furs ou complete sets of caries for ach TEG Suge Drum EG Surge Drum stall be a hoeontal vessel negra’ wih he TES Regenerator and shall be signs fort vacuum ‘Apress soy vale salle provided on te Surge Du, hich shal ear for fr oad alo ‘The suge rum shall have a capscty of rot less than fe orgeal Goal chaye volume of te complet sytem, Design pressure at doin top sol be sated in Data Sheets ‘The suge dum sal be ost unde tego roperara ‘Tho geal net tothe sug dum shal end point ebw he normal operating lol of topo Inte supe dun. A reflex ype gauge and level tars colurn shal be stale to span te entre operating eels ote vessel, and kwsee shown rarer sale ovde on be geal lvl. Provo shal bea o equalz pressure wt he yal regenera. EG Circulation Pumps EG Crauaion Punp an meta shal be designed and consid in accordance wih appa (CODE:Standars and BKODCO.-1L00-02 Speiicaon or Gereral Pump. The pups shall be ‘mourn an azoessbl locaton, Pungs shall b ved and piped to factat removal, ropa, ard rain operon nd mnorance ‘A taset ype suten srr shal be provid in he TEG le ofeach pup, The star sal be ‘asl renovate fo cleaning. 9 \ SALAMANDER ENERGY Qiwwvee _ MEARS a bp "S. (BANGKANAI) LIMITED conn tort ES THe ww [we] ee ROOODMEALAT-O08 Teecas peer © | 11Feb.2019 | 20 oF 32 Tatomate Proton Upon igh pressure dacharge (PSV) shal be proved - bypass shal be installed betwen he pump dschage and fe pup int. The bypass shal be contol by assy el avo so a he pump case des pressure, ‘The puns shal have a sel case. Each pump shal bo iad fom commen manifolds wh net tock vat (igor bal vate of same sie as the upsteam png), al check abe and Cute ook vate (gua pet bal vate), Col yea Heat Exchanger & Hot Glycol Het Exchanger ‘Woe gasket mara salbo as spect onthe datasheets The eat exchanger shal meth inrum requirements of TEMA, | dablebe exchanger may be proved as an atom Ith doube pipe exchanger mous the sevice requirements. The exchanger shal be suppotod by the TES repeneaion slit. Ping ‘eqed for intronneting te contact and th exchanger shal be proved by the VENDOR ald yoo! Heat Exchange sued © host up Rich Gol fom TEG Contactor going to TES Fleh rum by cooing the Lean Geo, tot Gyo! Heat Exchanger is used to het up th Reh hl om TEG Flash Oram going to TES Seiping Clu by cooing the Lean iyo Asan alot design, titor can ofr Lean! Reh TEG ‘exchange located at downstoar of Caton Fite 84 Fiping, Ves, and tings ‘te pling, ves and tings shall most he erence te project peiicaton (Ping General ‘Spscifcaton BKDDID-ME-140.050 ant Ping Matera Speccaton BKDDIO-VE-10-101). A ‘pling Flanges vp and ining 24 inches NB stall be as per ASME B 16.5 an above 24 inches WB shot be ASME 1647, Sor 8 [A plpework shat be ararged so that a te rshtahate Hens of equpmentinstunen are _coessbe and capable of being raved ‘si ong shal be pew pped andl Packages initaceconecons sabe brought the sit ge and amined with anges

You might also like